Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Ricardo.

Slides:



Advertisements
Similar presentations
Proposed update of Technical Guidance for INSPIRE Download services based on SOS Matthes Rieke, Dr. Albert Remke (m.rieke, 52°North.
Advertisements

General introduction to Web services and an implementation example
1 CEOS/WGISS20 – Kyiv – September 13, 2005 Paul Kopp SIPAD New Generation: Dominique Heulet CNES 18, Avenue E.Belin Toulouse Cedex 9 France
CEOS WGISS, Hanoi May OSCAR Prototyping the sensor web Wyn Cudlip BNSC/QinetiQ Presentation to WGISS Hanoi May 2007 (Slides.
ICalendar Compatible Collaborative Calendar- Server (CCS) Web Services Ahmet Fatih Mustacoglu Indiana University Computer Science Department Community.
HMA January 2011 – Slide 1 Daniele Marchionni TELESPAZIO HMA Follow On Task 4 - Order AR January 2011.
ESA UNCLASSIFIED – For Official Use INSPIRE Orthoimagery TWG Status Report Antonio Romeo ESRIN 15/02/2012.
HMA Sep 2009 – Slide 1 Daniele Marchionni Elsag Datamat HMA Follow On – Task 4 - Workplan.
HMA 5-6 July 2010 – Slide 1 Daniele Marchionni Elsag Datamat Stefania Pappagallo Elsag Datamat HMA Follow On Task 4 - Order MTR 5-6 July 2010.
05 October 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Teleconference, 22 October 2008 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 Progress Meeting 26 Nov 2008, by.
3 November 2009 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Page 1Overview of the HMA Project, 8 March 2010 Overview of the HMA Project OGC TC Opening Plenary Pier Giorgio Marchetti European Space Agency.
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Frascati, 2-3 July 2008 Slide 1 CITE tests for and HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Nicolas LESAGE, IGN.
ESRIN, 15 July 2009 Slide 1 Web Service Security support in the SSE Toolbox HMA-T Phase 2 AR Meeting 15 July 2009 S. Gianfranceschi, Intecs.
Frascati, 2-3 July 2008 Slide 1 HMA User Management in G-POD HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Fabrice Brito, Terradue Srl
5 July 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) MTR 5 July.
HMA-T Phase 2 KO, 2-3 July 2008 Slide 1 HMA-Testbed Phase 2 Negotiation and KO Meeting 2-3 July 2008, Frascati Yves Coene, SPACEBEL.
Spacebel - Hoeilaart, February 2009 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 Acceptance Review 1 18.
HMA Slide 1 Heterogeneous Missions Accessibility Follow On Pier Giorgio Marchetti - European Space Agency
HMA 23 Feb 2011 – Slide 1 Daniele Marchionni TELESPAZIO HMA Follow On Task 4 - Order 23 February 2011.
Page /06/2014HMA-S Final Presentation HMA-S Final Presentation OGC ROSEO Protocol D. Marchionni, Telespazio S.p.A. June 11, 2014.
ESRIN, 15 July 2009 Slide 1 Web Service Security support in the SSE Toolbox HMA-T Phase 2 FP 14 December 2009 S. Gianfranceschi, Intecs.
19 January 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
FedEO KO 5 June 2007 Slide 1 FedEO Catalogue Session. …
HMA Identity Management Status
HMA Follow On Activities
HMA Follow On Task 4 - Order Final Presentation June 2011
CEN 202 “Space Standardisation”
HMA AWG Configuration Management Status 1 December 2008
HMA Follow On Activities
Task 2.6 Eric Delory PLOCAN
CEOS OpenSearch Project II
HMA Follow On Activities
Ordering Services for EO Products SWG ATS / ETS
HMA Identity Management Status
T Network Application Frameworks and XML Web Services and WSDL Sasu Tarkoma Based on slides by Pekka Nikander.
HMA-S Final Presentation OGC DSEO Protocol
N. Fanjeau, Airbus Defence & Space June 11, 2014
EO Profile of GML and HMA Product Catalog for VITO CVB
HMA Follow On Activities
HMA Follow On Task 4 - Order Final Presentation June 2011
HMA SPS Mandatory I/F Development
HMA Follow On Task 4 - Order Preliminary Review 2-3 February 2010
Ordering Services for EO Products SWG ATS / ETS
CEOS OpenSearch Project II
HMA Follow On Activities
HMA Follow On Activities
Overview of Progress HMA Standardisation Work
HMA-FO Task 1 Workplan HMA AWG 30th of September 2009 Darmstadt OGC TC
HMA-Testbed Phase 2 AR-2 Meeting July 2009, Frascati
HMA Follow On Activities
CEOS OpenSearch Project II
N. Fanjeau, Airbus Defence & Space June 11, 2014
Evaluating Compuware OptimalJ as an MDA tool
EO Data Access Protocol
HMA Follow On Activities
Standardisation Status Update
Web Service Security support in the SSE Toolbox
HMA Follow On Task 4 - Order Final Presentation 21 June 2011
Ordering Services for EO Products Abstract Test Suite (ATS)
HMA Follow-on Kickoff Meeting
OGC and activities HMA-T Phase 2 KO Meeting
Status OpenSearch Standardisation Activities - HMA-S Project
HMA Follow On Task 4 - Order Final Presentation 21 June 2011
Pier Giorgio Marchetti - European Space Agency
HMA-Testbed Project Call
Web Service Security support in the SSE Toolbox
EO profile for WMS progress report
Presentation transcript:

Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Ricardo Moyano, DEIMOS Space Reuben Wright, DEIMOS Space Philippe Merigot, SPOT Image

Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 2  Objectives  ITT and Proposal information HMA-T team Work Breakdown Structure Deliverables Schedule DEIMOS SPS SPOT SPS

Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 3 This project aims at :  The implementation of a SPS EO library  The implementation, based on this library, of two SPS Profile for Earth Observation (OGC ) interoperability standards defined within the HMA contract:  SPOT IMAGE SPS EO – optical  DEIMOS SPS EO – radar  The full life cycle process for the two software developments, starting from the generation/update of the Requirement Baseline up to the validation of the interface at the development platform. Objectives All documentation shall be generated for each development phase following the tailored ECSS standards from the Statement Of Work.

Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 4 Proposal Information: HMA-T SPS Team

Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 5 Proposal Infromation: WBS

Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 6 Proposal Information: List of Deliverables

Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 7 Schedule : HMA “short” schedule shall be applied

Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 8 Reviews and Payment Plan Milestone%Date KOM20T0 (03/07/08) AR-170T0 + 7m (02/02/09) FP10T0 + 18m (03/06/09) Notes  In our proposal, only one travel is foreseen (this one!)

Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 9 Proposal Information: SPS development (1/2) SPS is dedicated to the EO Sensor domain complying with specification OGC The operations part of the contract are aimed at: Determining the request and receive service metadata describing the abilities of the specific server implementation (GetCapabilities) Requesting information needed to send GetFeasibility and Submit requests (DescribeTasking) Determining the feasibility of an intended sensor planning request (GetFeasibility) Submitting such a request (Submit) Retrieving information about how and where data (produced by the sensor) can be accessed (DescribeResultAccess)

Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 10 Proposal Information: SPS development (2/2) SPOT System connector Deimos CFI- based System

Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 11 Proposal Information: Development issues The proposal describes the implementation complying with version 1.0 of OGC  We will need finalised inputs from the SPS Application Profile standardisation. The proposal describes the implementation complying with version 1.0 of OGC  The Requirements and Software specification will follow directly from the Use Cases identified  Validation testing must not be confused with conformance testing. Validation shall follow the ECSS approach comprising test case and test procedure specifications.

Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 12 Proposal Information: DEIMOS SPS – Technical Approach (1/3)  SPS SOAP interface will be developed “Contract first” using Web Service Description Language (  The Java code stubs are then generated via a framework – Axis – this is an Apache project.  The SPS I/F shall then be developed, utilising the core library and accessing the existing CFI sensor planning system.  SPS I/F server will be deployed on an Apache Tomcat server. No client software deliverable is anticipated.

Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 13 Proposal Information: DEIMOS SPS – Technical Approach (2/3) CFI-based System

Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 14 Proposal Information: DEIMOS SPS – Technical Approach (3/3) Earth Explorer Mission Software CFI  Existing sensor planning library, ie. a COTS to this project.  Collection of software functions performing accurate computations of mission related parameters.  Computes time segments at which an Earth Explorer satellite, or one of its instruments is in view of various targets.  Implemented in C but will be accessed in Java code via a Java Native Interface (JNI).  Can simulate a variety of Earth Explorer missions, such as GOCE, CryoSat and Aeolus. We will decide early on in the project the details of the Radar planning system we wish to simulate.

Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 15 Proposal Information: SPOT SPS overview Client SPS Request SPS Response Mapping Spot Image SPS PRM request PRM response Deserialization Req validity check Serialization EO LIB XML sweCommon request response Java objects XML sweCommon PRM Spot Image Programming System

Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 16 SOAP Framework HTTP Servlet SPS Message Deserializer SWE Common Reader SPS Message Serializer SWE Common Writer XML Tree Objects (i.e. DOM) XML Tree Objects Byte Stream Ground Segment Connector EO Writer Helper EO Reader Helper SPS Message Java Object Users, Tasks DB Programming Orders Feasibility Studies Apache Tomcat Apache Axis SPS Library Programming Status Notification System Subscrip- tion DB Sensor Params DB GS Specific Feasibility Report Proposal Information: SPOT SPS in details

Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 17  Simplify the life of implementer  Contains a Low-level module (sweCommon) that can be reused by other WS  Improve Interoperability SPS Lib : key points

Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 18  New SPS v2.0 specification will be the basis for the SPS EO Profile (i.e. part of the Requirement Baseline)  Spec currently under construction via the SPS SWG at OGC. HMA SPS EO Profile 1.0 will follow shortly  Should simplify the life of implementers. More consistent with other SWE standards and notifications are optional  EO Profile specification will reuse more of the core SPS and define specific data structures used in EO (hopefully better than in v0.9.5)  Target for SPS 2.0 draft: September 2008 (TC Atlanta, USA) Target for SPS 2.0 final: December 2008 (TC Valencia, Spain) SPS specification : key points