Last updated: 24 April 2006 Alberto Escudero Pascual ItrainOnline MMTK Budgeting and Planning Developed by: Alberto Escudero Pascual,

Slides:



Advertisements
Similar presentations
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
Advertisements

Chapter 3: Planning a Network Upgrade
Disaster Recovery Planning Because It’s Time! Copyright Columbia University and Bentley College, This work is the intellectual property of the author.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Network Design and Implementation
Internet Technologies For Rural Areas Presented By: Dan Barker Internet Manger - Kingdom Telephone Co.
Module 6/7: DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
TYPES OF BROADBAND. BROADBAND FLAVORS Wired: Digital Subscriber Lines (DSL) Cable Modem Leased Lines (T1) Fiber Optic Cable Broadband Over Powerline (BPL)
Equipment Installation, piping & wiring Variable Water Flow System.
Economics – Why Today? Collecting data Additional information for request –Single vs multiple units –Quantity –Quality Future decisions Economic analysis.
Types of Broadband.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
Planning a Wireless Network Training materials for wireless trainers.
Wireless Delivery of data to the car May, 2005 Paul Lipkin Director of Dynamic Content.
1 Community-Owned Networks Edith Ofwona Adera Senior Program Specialist, IDRC ICT4Dev Southern Sudan 2010.
Wireless Fundamentals Lesson 2: Implementing A New Wireless System Bellevue Community College Bob Young, Instructor.
«Energy Saving Policies in Greece» Dr. Litos Charalampos, Technical Chamber of Greece, Prof. Ioannis Vourdoumpas Chania
{ Transmission Media.  Information can be transmitted through a medium by varying some physical property.  The physics of the universe places some limits.
Communications & Computer Networks Resource Notes - Network Hardware
1 Computer Maintenance Software Configuration: Evaluating Software Packages, Software Licensing, and Computer Protection through the Installation and Maintenance.
Sydney (02) Melbourne (03) Brisbane (07) Carlo Biaro Capital Insight Conference 2013 – Tools and.
NETWORKING & SYSTEM UPDATES
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
12.1 Plan Procurement: Introduction
Wireless Networking Devices. wireless LAN adapter cards wireless access Points wireless bridges wireless routers.
County of Grey Wireless Project Presentation to Finance and Personnel, Feb. 6/03 Presentation received, and directed to move forward. Update on test presented,
USAID Afghanistan Engineering Support Program (ESP) Pre-Bid Meeting July 14, 2015.
Last updated: 13 May 2006 Alberto Escudero Pascual, IT +46 ItrainOnline MMTK 1 Communication Tower Developed by:
Last updated: 17 April 2006 Alberto Escudero Pascual ItrainOnline MMTK 1 Wireless Standards Developed by: Alberto.
Last updated: 20 April 2006 Sebastian Büttrich ItrainOnline MMTK 1 Basic Wireless Infrastructure and Topologies Developed by Sebastian.
Wireless Network Planning Alberto Escudero Pascual Louise Berthilson IT +46 Unit 20.
Last updated: 12 May, 2006 Alberto Escudero Pascual ItrainOnline MMTK Outdoor Radio Simulation An introduction to “Radio Mobile”
Last updated: 28 April, 2006 Tomas B. Krag ItrainOnline MMTK: 1 Linux based Infrastructure Developed by: Tomas B. Krag, wire.less.dk.
Last updated: 20 April 2006 Alberto Escudero Pascaul ItrainOnline MMTK Access Point Configuration Developed by IT +46 Based on the.
1 Determining a client’s peripheral requirements  Determine current business practices  Determine peripheral requirements  Analyse and document existing.
Last updated: 18 April 2006 Sebastian Büttrich ItrainOnline MMTK 1 Basic Radio Physics Developed by: Sebastian Büttrich.
Energy and Environmental Solutions Company Confidential—Siemens Building Technologies 2008 SLS 242/342: Performance Contracting - Proposing Opportunities.
Last updated: 23 April 2006 Sebastian Büttrich ItrainOnline MMTK 1 Radio Link Calculation Developed by: Sebastian.
Computer Maintenance Software Configuration: Evaluating Software Packages, Software Licensing, and Computer Protection through the Installation and Maintenance.
Planning and Realisation of Wind Farms
Georgia Tech Safety and Health Consultation Program
Equipment Planning Joe Conlon, CSTE Wednesday, July 10, :00 AM.
Contents Computer Network Benefits of Computer Network
COMPUTER NETWORKS CS610 Lecture-21 Hammad Khalid Khan.
Creating a Wireless VRS Network
Content of Tender Dossier - Instructions to Tenderers - Tenders
Enterprise Wireless Solutions
VISER progress report on DBBT curriculum & equipment
Contract implementation - Management of Suppliers -
School Connectivity: E-Rate Services Team
Developing and Issuing the RFP
Phase 4: Compelling Case for Change
Hazardous Areas & Hazards of Electricity
Computer Maintenance Software Configuration: Evaluating Software Packages, Software Licensing, and Computer Protection through the Installation and Maintenance.
حساب الميزانية والتخطيط
The E-Rate Program Eligible Services Fall 2011 Applicant Trainings.
HP-II Workshop on Real-time Hydrological Information Systems
Computer networking In this section of notes you will learn the rudiments of networking, the components of a network and how to secure a network.
Communications & Computer Networks Resource Notes - Network Hardware
Department of Information Technology (DoIT)
10/19/2018 Report Project Status Version 23
Information security planning
Specifications What should it cover Goods Services Warranty
Compare geothermal to solar
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
PG&E EV Fleet Program.
East Hall under construction
Opportunities for Local Energy
School Connectivity: E-Rate Services Team
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Last updated: 24 April 2006 Alberto Escudero Pascual ItrainOnline MMTK Budgeting and Planning Developed by: Alberto Escudero Pascual, IT +46

Last updated: 24 April 2006 Alberto Escudero Pascual ItrainOnline MMTK Goals To understand that: ● A budget is not “just” a request for funding ● A good plan needs a good budget ● A good budget shows that you have a good plan

Last updated: 24 April 2006 Alberto Escudero Pascual ItrainOnline MMTK The goals are NOT ● To present the budget for your implementation ● To provide the plan for your implementation

Last updated: 24 April 2006 Alberto Escudero Pascual ItrainOnline MMTK Table of Contents Viability Study Hardware Budgeting Issues Licenses and permissions Procurement and Import Implementation phase Contracts and Quality Assurance

Last updated: 24 April 2006 Alberto Escudero Pascual ItrainOnline MMTK Viability study What physical infrastructure is available? What technical infrastructure is already in use? Where is the closest point of presence for power/energy? Where is the closest point of presence for Internet? Weather conditions and terrain Accessibility for transport Legislation (radio/tower)

Last updated: 24 April 2006 Alberto Escudero Pascual ItrainOnline MMTK Many existing sites? –Measurements (SNR) Measure distance to other point(s) –GSM, map, car Equipment to bring –Binoculars (line-of-sight), digital camera –Torch or blinking lamp –Adequate clothes, rope, climbing gear,helmet Existing Physical Infrastructure

Last updated: 24 April 2006 Alberto Escudero Pascual ItrainOnline MMTK Existing wireless infrastructure Existing antennas and cabling Other equipment on site Frequencies/channels Radio power Existing Technical Infrastructure

Last updated: 24 April 2006 Alberto Escudero Pascual ItrainOnline MMTK Access to Power/Energy Distance to closest power grid –Dig and hook on –Permission Wind or solar cells –Installation and transport –Yearly maintenance cost

Last updated: 24 April 2006 Alberto Escudero Pascual ItrainOnline MMTK Internet Connectivity Wired versus Wireless –Price vs performance Optical fiber or twisted pair –Protection (PVC) –Water tightness

Last updated: 24 April 2006 Alberto Escudero Pascual ItrainOnline MMTK Hardware Budgeting ● Case study included – Radio and networking hardware ● Other relevant issues for budgeting

Last updated: 24 April 2006 Alberto Escudero Pascual ItrainOnline MMTK Hardware Budgeting ● Stable source of electricity (UPS) ● Electrical grounding and lightening protection – Direct and indirect hits ● Practical tools – Climbing gear, walkie-talkie, ladders, backpackers, GPS equipment, maps, trip-meter, binoculars, blinking lamp or torch, ropes, tape and a standard tool box ● Local Transport

Last updated: 24 April 2006 Alberto Escudero Pascual ItrainOnline MMTK Licenses and Permissions Permission to build tower (see “Communication Tower”) –Owner of house/tower/plot –Authority handling regulations of airspace Permission to operate IEEE –Unlicensed (license free within limits) –License is required

Last updated: 24 April 2006 Alberto Escudero Pascual ItrainOnline MMTK Licenses and Permissions ● “Unlicensed” implies that no license is needed ● “Unlicensed” does not imply unregulated – The maximum power output is regulated ● Regulations varies from country to country. ● Typically “Commission for Communication” handles the licenses

Last updated: 24 April 2006 Alberto Escudero Pascual ItrainOnline MMTK Licenses and Permissions

Last updated: 24 April 2006 Alberto Escudero Pascual ItrainOnline MMTK Procurement of Equipment ● Local purchase – Heavy and bulky items ● Import – Transport and Insurance – Pre-shipment inspection – Import duty – Clearance of goods (clearance agent) – Delivery time

Last updated: 24 April 2006 Alberto Escudero Pascual ItrainOnline MMTK Implementation Phase ● Before you start: – Equipment procured and delivered – Licenses and permissions obtained and paid ● Time for implementation (weather conditions) ● Project team (experience)

Last updated: 24 April 2006 Alberto Escudero Pascual ItrainOnline MMTK General about Contracts Delivery time Transport Testing Warranty Currency

Last updated: 24 April 2006 Alberto Escudero Pascual ItrainOnline MMTK Public Tenders Prepare a good specification in advance Specify what you want and you do not want Let someone with experience review your specification. Bring outsiders in the process Do not forget: testing and evaluation Expect quality, Demand quality!

Last updated: 24 April 2006 Alberto Escudero Pascual ItrainOnline MMTK Quality Assurance Test and label the equipment Check the specifications What do you want? How can you measure it? What can you guarantee? Who is going to be blamed?

Last updated: 24 April 2006 Alberto Escudero Pascual ItrainOnline MMTK Conclusions ● You do not need to be a genius to plan and budget for a wireless implementation, just realistic and a bit “pessimistic” ● A good implementation plan from the beginning will save you lots of trouble (and money) at the end of the project ● Budget also for bringing Internet and electricity to the place, licenses, lightening protection, transport and tools ● A budget on its own is not a good plan. But a good plan has a good and detailed budget.