Role & Responsibility for Quality Assurance What is your opinion on this topic heading? Role and Responsibility of: Role and Responsibility of….(Er.) for.

Slides:



Advertisements
Similar presentations
COMPANY MAINTENANCE MANUAL
Advertisements

Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.
Effective Contract Management Planning
Checking & Corrective Action
SUBMITTALS PROCESSING Fall 2008 ARCH 330
Ensuring Better Services and Fair Value “Introduction and roadmap to implementation of ISO in Zambia’s water utilities” Kasenga Hara March 2015.
More CMM Part Two : Details.
Sampling Methods and Quality Assurance Plan
Contractor Safety Management
The ISO 9002 Quality Assurance Management System
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
Quality Management System
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
Quality Assurance/Quality Control Policy
ISO 9000 Certification ISO 9001 and ISO
5.2 Personnel Use competent staff Supervise as necessary
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
WELCOME TO TRAINING PROGRAMME FOR CONSULTANTS’ SERVICES FOR 3 rd PARTY QUALITY CONTROL AND QUALITY ASSURANCE G. PRABHAKAR.
Introduction to Software Quality Assurance (SQA)
The Role of the Internal Auditor for Maintaining System Compliance and Promoting Continuous Improvement Wayne M. Uttke
Effective Management and Compliance 1 ANA GRANTEE MEETING  FEBRUARY 5, 2015.
MATTHEW MATKOVICH MINE EQUIPMENT COMPLIANCE SPECIALIST QUALITY ASSURANCE & MATERIALS TESTING DIVISION MSHA – APPROVAL & CERTIFICATION CENTER 30CFR, PART.
Railway Transport Equipment (RTE) Certification Railway Transport Equipment Certification Procedure Application for railway transport equipment certification.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
a guidance to conversion
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
Exercise 1 Tor Stålhane IDI / NTNU. Intro The strength of ISO 9001 and many other standards is that they focus on “What shall be done” and leave “How.
RBIG WORKSHOP 1 Supply Chain and Asset Management.
Project management Topic 3 Quality.
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
1 Service Coordinator Orientation FN R. CollESH SectionX8518.
DOCUMENTATION ISO/IEC 17025:2005 Documentation.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
Pat Nestor MSCSI MRICS Head of Building Control Dublin City Council
Software Quality Control and Quality Assurance: Introduction
ISO/IEC
Maintaining Safety Standards
Administration of a FIDIC Contract - Project Control
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Structural Funds Financial Management and Control, Romania
Maintaining Safety Standards
External Validation of Quality Programs
UNIT V QUALITY SYSTEMS.
Experience in Conformity Assessment of Products and Services  for Russian NPPs and Overseas Nuclear Power Plant New Builds Yury Meltsov Aug
QC Document Update Todd Shields, INDOT.
Acceptance Process for Manufactured Products by Certification:
Temporary Works Co-ordination
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Quality Management Systems – Requirements
Construction Management
What is the UL QFCP? FCIA Webinar Presenters:
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Emulsion Task Force Meeting
ISO 9000 Dr. S. Thomas Foster, Jr..
Quality Assurance for Emulsified Asphalt Surface Treatments
Operationalizing Export Certification and Regionalization Programmes
Management Verifications & Sampling Methods
External Validation of Quality Programs
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Fiber Reinforced Polymer Systems
Presentation transcript:

Role & Responsibility for Quality Assurance What is your opinion on this topic heading? Role and Responsibility of: Role and Responsibility of….(Er.) for Quality Assurance (in execution of the “Road and Bridge” contracts)

Role & Responsibility (of…) for Quality Assurance Role & Responsibility of “Sub.Er.” “Er.” “ Division Chief” and “ Regional Director” Role & Responsibility of the “ Contractor” Role & responsibility of the Technical Auditer Role & responsibility of the

Information Quality Level Quality Level Staff Level Short Description IQL- III/IV RDSummary Details IQL- II/III DCDetailed IQL- I/II Er. Detailed with Values IQL- I Sub. Er.Most Detailed and Comprehensive

Role & Responsibility of the Contractor Standard Specification Sub-clause 504: “ The Contractor shall submit to the Engineer for his approval, the Quality Assurance Plan (QAP)which shall be based on the detailed Program of the Works as per SS Sub-clause 116” Once Division Chief approves the QAP, it is the responsibility of the Contractor to maintain/control quality of the Works as per the approved QAP.

Continue Contract Awarded "Detailed Work Program" Supported with other Resource Programs 1) Materials Program 3)Labour Program 4) Equipment & Plant Program

Continue Sequence of Works 1)Identify main Components of the works, 2)Detailed out Sequence of Works of each Component describing on (a) Line & Level and Lay-out, (b) Workmanship, and (c) Quality Control and (d) Stage wise Request of Inspection

Continue Recapitulative Test Schedule and Testing Program 1)Breakdown the BoQ Items into (a) Natural Material such as stone, (b) Manmade Materials such as Steel and (b) Construction Activities such as Concreting 2) Prepare a Testing Program comprising (a) Suitability Test (b) Production Control Test, (c) Process Control Tests and (d) Acceptance Tests and (e) Tests to be carried out out-side: should clearly show number of tests to be carried out and frequency to be maintained as per process described in sequence of works and SS 510 Table 5.1

Continue Establish: 1) Trials process including lab trials, site trials, and trial section 2)Details of materials mainly factory made and supplied matching with Material Plan including (a) material storage facility, (b) delivery invoice at site, (c) manufacture’s quality certificate and (d) Verification test at production yard. 3) Appropriate equipments to be used in lab, their calibration frequency, Standard & Codes to be followed and testing process to be adopted, Testing Format to be adopted. 4) List of staff and qualification 5) Organization Chart of the Lab strength 6) Delegation of Authority to verify and certify test results

Role & Responsibility of the Sub. Er. ‘Key Actor’ at base level for checking compliances to Specification Recording any area of non-compliance (workmanship, materials quality, and constriction process quality) with Specification requirement and notify the Er. Coordinate with Er. to arrange Materials Testing through Material Engineer/Er. When work schedule requires

Role & Responsibility of the Er. If Er. at Divisional Office is working as Material Engineer, he /she shall have following role and responsibility: Materials Approval – Natural Materials – Manmade materials Testing – Prepare a list of tests together with test frequencies to be undertaken for all phases of the Works – Monitor field and lab. Testing including trials testing

Role & Responsibility of the Er. continue Undertake independent materials testing when considered necessary Supervise Contractor’s lab (or DoR’s own) activities for Specification conformance such as equipment calibration etc. Check QAP submitted by the Contractor as per Standard Specification of the Condition of Contract and submit to Division Chief for approval Supervise Contractor’s field activities for material source and implementation technique to achieve top quality work Forward non-conforming work report to Division Chief.

Role & Responsibility of the Divisional Chief When any non-conforming work is undertaken by the Contractor, issue and sign notice of non-conformance to record the defects When non-conformance work is correctly completed, sign off the non-conformance reports and could request RD for verification at site Keep the record of non-conformance to make known to RD

Role and Responsibility of the RD Review notice of non-conformance reports Give guidance to Divisional Chief with regards to sign-off after correction of defects by the Contractors Field visit to check correction made before sign-off by Divisional Chief. Keep record of such Contractors

END Thank you Vishnu Shrestha