EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, EURISOL DS PROJECT Task#2: MULTI-MW TARGET DESIGN Y. Kadi On behalf of Task#2 European.

Slides:



Advertisements
Similar presentations
1 MEGAPIE Structural Materials : Is there a risk of failure? MEGAPIE Workshop Aix-en Provence, Nov MEGAPIE Structural Materials Is there a risk of.
Advertisements

SNS Experimental FacilitiesOak Ridge Target Systems for the Spallation Neutron Source Presented by John R. Haines at the High-Power Targetry for Future.
The Current T2K Beam Window Design and Upgrade Potential Oxford-Princeton Targetry Workshop Princeton, Nov 2008 Matt Rooney.
Mike Fitton Engineering Analysis Group Design and Computational Fluid Dynamic analysis of the T2K Target Neutrino Beams and Instrumentation 6th September.
for a neutrinos factory
September 15-16, 2005/ARR 1 Status of ARIES-CS Power Core and Divertor Design and Structural Analysis A. René Raffray University of California, San Diego.
EURISOL DS Progress Meeting T2-03, CEA Saclay, France 27 – 28 October, EURISOL DS PROJECT Task#2: MULTI-MW TARGET DESIGN Adonai Herrera-Martínez.
Target & Capture for PRISM Koji Yoshimura On behalf of PRISM Target Group Institute of Particle and Nuclear Science High Energy Accelerator Research Organization.
Status of T2K Target 2 nd Oxford-Princeton High-Power Target Workshop 6-7 th November 2008 Mike Fitton RAL.
LH2 Absorber Heat Load and Homeostasis. What has happened before… 1.Huge LH2 volumes, low heat deposition: Bubble chambers 2.Small LH2 volumes, low heat.
March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Status ARIES-AT Blanket and Divertor Design The ARIES Team Presented.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Nuclear and Energy Technologies.
ISIS Second Target Station
2 nd Oxford-Princeton High-Powered Target Workshop, Y. KadiNovember 6, EURISOL DS PROJECT Task#2: MULTI-MW TARGET DESIGN Y. Kadi On behalf of the.
EURISOL Town Meeting October 2012 – Lisbon High-Power Targets High-Power Targets Developments and Testing of Spallation Neutron Sources Yacine Kadi,
EURISOL DS Target Meeting, CERN, CHY.KADIMarch 10-11, EURISOL DS PROJECT Task#2: MULTI-MW TARGET 1st year planning Y. Kadi (AB/ATB) European Organization.
High-Power Density Target Design and Analyses for Accelerator Production of Isotopes W. David Pointer Argonne National Laboratory Nuclear Engineering Division.
Study of a new high power spallation target concept
Copyright © 2013 SCKCEN Pb-Bi target for Optimization toward higher yields SCKCEN Mentor : Dr. Lucia-Ana Popescu University Promoter : Prof.
Y. Romanets 1, R. Luis 1,J. Bermudez 3, J.C. David 5, D. Ene 5, I. F. Goncalves 1, Y. Kadi 2, C. Kharoua 2, F. Negoita 4, R. Rocca 2, L. Tecchio 3, P.
Mats Lindroos Future R&D: beta-beam Mats Lindroos.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
FP6 Design study "DIRAC secondary beams" Project "NUSTAR":Experiments with stored radioactive beams Super-FRS high-power production target has to cover.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
The CNGS Target Station By L.Bruno, S.Péraire, P.Sala SL/BT Targets & Dumps Section.
Investigation of a “Pencil Shaped” Solid Target Peter Loveridge, Mike Fitton, Ottone Caretta High Power Targets Group Rutherford Appleton Laboratory, UK.
EURISOL – Task 11 meeting 2007S. Chabod 1 OUR CONTRIBUTION INSIDE EURISOL TASK 11 OPTIMIZATION OF IN-TARGET NUCLEI YIELDS Target parameters: material (Al.
Jefferson Lab Muon Collider Design Workshop December 2008 Lithium Lens for Muon Final Cooling UCLA K. Lee, D. Cline and A. Garren.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
B. Azadegan, S. A. Mahdipour Hakim Sabzevari University
C.KotnigFCC Design Meeting FCC Beam Screen cooling Claudio Kotnig.
Design of an Inertial Fusion Energy Target Injection & Tracking System Ronald Petzoldt, Dan Goodin, Mike Hollins, Chuck Gibson, Neil Alexander, and Gottfried.
EURISOL DS Target Meeting, CERN, CHY.KADIMarch 10-11, EURISOL DS PROJECT Task#2: MULTI-MW TARGET Y. Kadi (AB/ATB) European Organization for Nuclear.
BENE/EURISOL-DS Joint Meeting, CERN, SwitzerlandFebruary 22, Progress in the Liquid Mercury Multi-MW Target Design Studies Y. Kadi On behalf of.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
Task2: Liquid Metal Target Thermo hydraulic and structural analysis of the Eurisol liquid metal target Ashrafi-Nik M. * C.E.R.N, AB Department, ATB Group.
Paul Scherrer Institut 5232 Villigen PSI EURISOL Town Meeting Pisa, March 30-April 2, 2009 / W. Wagner PAUL SCHERRER INSTITUT EURISOL Spallation Neutron.
TIARA-PP WP 9 « TIHPAC » Test Infrastructure for High Power Accelerator Components Sébastien Bousson (CNRS-IN2P3-IPN Orsay) TIARA PP TIARA Steering Committee.
HL-LHC-UK Thermal Shield Update Niklas Templeton 07/03/2016.
3 February 2005, J. Lettry 1 Task #3 100 kW direct targets “Development of targets and ion sources for radionuclide production that can accommodate up.
CSNS cryogenic system Institute of High Energy Physics Guoping Wang June 21, 2016.
LIEBE project Safety aspects of the Pb/Bi loop target LIEBE meeting report – WP5AP.Bernardes Thanks to : Richard Catherall/EN-STI, M.Delonca/EN/STI,
Target Systems and Monolith Design Update Rikard Linander Group Leader Monolith and Handling April 2, 2014.
SPS High Energy LSS5 Thermal contact & cooling aspects
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
Organization – Work Units General layout Neutronics Target design RIBO calculations Yields Beam optics Target handling Shielding Safety target Safety converter.
EURISOL: European Collaboration towards the ultimate ISOL facility Yorick Blumenfeld IPN – Orsay We acknowledge the financial support of the European Community.
Summary of IAP comments from 2007 EURISOL Town Meeting
P1 – GANIL P2 – CNRS/IN2P3 P3 – INFN P4 – CERN P6 – CEA Saclay P7 – NIPNE Bucarest P18 – PSI Switzerland P19 – IPUL Latvia C2 – BINP Novosibirsk C3 – VNIITF.
New nTOF target: Design Issues
ISIS TS1 Project: Target Design and Analysis
Present and possible future schemes for hadron therapy linacs Alberto Degiovanni for the ADAM team HG2017 Workshop , Valencia.
Coatings for neutron conversion for n_TOF
DCLL TBM Reference Design
Xiaomin Pang, Yanyan Chen, Xiaotao Wang, Wei Dai, Ercang Luo
SMI-06 Workshop, Groningen,
Designing Safety into a High-power Neutron Spallation Source
Peter Loveridge High Power Targets Group
Target and Horn status report
Sébastien Bousson (CNRS-IN2P3-IPN Orsay)
Future R&D: beta-beam Mats Lindroos Mats Lindroos.
Accelerator R&D for Future Neutrino Projects
Proton Source and LEBT Luigi Celona & Lorenzo Neri
STUDIES TOWARDS TARGET-HORN INTEGRATION Institute of Applied Mechanics
Beam Dump outline work plan (UK perspective)
HIE-LINAC status report
Overview of mechanical design & construction
Status of ARIES-CS Power Core Engineering
PANDA Collaboration Meeting
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, EURISOL DS PROJECT Task#2: MULTI-MW TARGET DESIGN Y. Kadi On behalf of Task#2 European Organization for Nuclear Research, CERN CH-1211 Geneva 23, SWITZERLAND

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, Done In progress Planned In progress Task#2 – Multi-MW Liquid Hg Target Reporting: 3 conf. proceedings 12 tech. notes

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, Radial Direction [mm] CFD Model 25[mm] Beam CFD Model 15[mm] Beam Different Beam with Various intensity

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, Comparison of Von-Mises stress Corresponding to temp distribution Von-Mises stress(25mm)Von-Mises stress(15mm)

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, Thickness optimisation for a 25mm beam 3.5mm 0.8mm 1.3mm

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, Pulse Beam pulse duration of 1ms and 50 Hz repetition rate (pulse distance = 20ms) and a density power of 4 MW on the target are presented. Monitor Probes Convergence of monitor probes to equilibrium point

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, Pulse Beam

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, Von-Mises stress of pulse beam at s

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, Task#2 – 3D CFD & Structural Analysis

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, Conclusion The final optimisation has yielded a satisfactory solution to the all necessary objectives. Definite advantages from inserting blades and spacers within target hull from the point of view of lower stresses and temperature. A mesh refinement control helped choosing an adequate mesh for the computation. The result of pulse beam was quite satisfactory, however it is recommended that, study on shock waves and stress propagation as effect of the pulses. Finally, the major goal, which consists in the prediction of erosive effects of gravity in liquid metal flow, has to be followed. This goal can be achieved by simulating 3D model. Task#2 – 3D CFD & Structural Analysis

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, Done In progress Planned In progress Task#2 – Multi-MW Liquid Hg Target Reporting: 3 conf. proceedings 12 tech. notes

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, Task#2 – Liquid Hg Loop

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, Liquid Hg Loop – Transverse Film

Target window – Liquid metal container Vanes to turn flow 180 o LM Inlet LM Outlet Optional Vanes to turn flow 30 o protons LM Heat shield isolating cold inlet LM from hot exit LM Inner guide tube

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, Final assembly: guide tube attached to inlet interface Bend back instrumentation cables lying in the channels and lead out of tube Insert guide tube, fully instrumented with cabling in channels into inlet interface Weld guide tube to back Weld guide tube to its outer shell Weld on outer hull

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, Design status The design of the target is now finalised. Last remaining open manufacturing difficulties have been cleared Manufacturing drawings are being prepared for mid-June. Design review projected end of June. Internal PSI workshop and manufacturers will then be consulted and request for quotes sent out in July.

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, TASK #2 – Multi-MW Target

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, Summary and Outlook The reference design of the 4 MW Hg spallation target and its ancillary equipment has advanced very significantly over the last year, but still the design reference parameters need to be tuned, particularly in the case of the secondary fission target surrounding the neutron converter. The needs to freeze the design reference parameters (in particular the overall dimensions of the liquid Hg loop, hot cell, vacuum system, etc…) becomes urgent in particular for Task #5 to progress on the work related to the shielding and safety calculations. It is strongly recommended to undertake a detailed study of the Hg “transverse film” which would allow a much more compact geometry of the fission target. The design of the fission target has been improved with the requirement to efficiently extract and ionize the fission fragments and to minimize the amount of fissionable material in the target assembly for a given beam intensity. Some ideas for ion sources operating with high gas load are under investigation. Vacuum and Remote Handling System are being conceptually investigated => MAFF concept

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, Material Irradiation Proton Beam Fission Target Tube Hg Proton to Neutron converter Neutron source Task#2 – Integration of MAFF concept

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, Production of fission fragment beams > evacuated, through-going beam tube SR-6: Zirkaloy beam tube: - no embrittlement by neutrons - high melting temp.: 1850 o C > MAFF principle:

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, Source exchange unit Source trolley Source (1g U in C)

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, Fission Target Tube Hg Proton to Neutron converter Hg inlet Hg outlet Task#2 – 3D Cut View

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, Fission target Beam outlet Cryo Panel Beam optics Beam Tube Double wall tube Task#2 – 3D view of the fission target

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12,

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, Beam tube Safety Net/Mesh Container support Re ou Ta BeO insulator Double wall tube Target material (Graphite / Uranium) Target container (Re) To retain the target in case of failure To cool down theconcrete as well as evacuate the heat generation on the target Task#2 – 3D view of the fission target Target: (100 cm3) 250g Graphite with up to 10g 235 U Operational temperature: up to 2400°C Materials: Re, Ta, W, BeO Local moderator

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, Target: 25g Graphit with up to 1,2g 235 U Operational temperature: up to 2400°C Materials: Re, Mo, W, BeO Calculated emittance at 30keV:  =12  mm mrad First prototype Materials: Fe, Ta, W, BeO measured emittance at 30keV:  =25  mm mrad Fissions/s of 1.2g U: 1, /s Uranium consumpt. in 52 days: 17%

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12,

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12,

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12,

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12,

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12,

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12,

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12,

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12,

EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12,