ESSνSB: The ESS neutrino facility for CP violation discovery

Slides:



Advertisements
Similar presentations
EuroNu CERN February 5, 2008 Marco Zito Super-Beam work package Marco Zito Dapnia-Saclay On behalf of the SB w2 team EuroNu 5/2/2008 Thanks to M. Dracos.
Advertisements

ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
CERN First Considerations to implement nuSTORM on the CERN site “North Area Neutrino Hub” E.Wildner, CERN Wednesday, March 27, 2013Elena Wildner,
Accelerator based Neutrino program around the world 1. Europe: Neutrino platform at CERN ESS second maximum? 2. Japan: T2K and HyperK status 3. USA: LBNF.
Target station and optimization studies for ESS Super Beam E. Baussan, M. Dracos, N. Vassilopoulos IPHC/CNRS.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
Muon Collider 2011 Workshop Jun 27-July 1 in Telluride, CO Gollwitzer & Nagaitsev presented Attending: Ankenbrandt, Lebedev, Pasquinelli, Popovic, and.
Neutrino physics: experiments and infrastructure Anselmo Cervera Villanueva Université de Genève Orsay, 31/01/06.
INDIA-BASED NEUTRINO OBSERVATORY (INO) STATUS REPORT Naba K Mondal Tata Institute of Fundamental Research Mumbai, India NUFACT Scoping Study Meeting at.
Measuring δ CP at the second ν oscillation maximum Win2015 Conference in Heidelberg 12 June 2015 Tord Ekelof, Uppsala University 1 ESSνSB
Alain Blondel Neutrino Factory scenarios I will endeavour to address some principle design issues related to the physics use of high intensity muon beams.
J-PARC upgrade T. Nakadaira (KEK / J-PARC). Outline J-PARC overview & on-going program Motivation of future experiment in J-PARC Overview of future experiment.
A new design for the CERN to Fréjus neutrino beam Marco Zito (IRFU/CEA-Saclay) For the EUROnu WP2 team NUFACT11 Geneva August 2nd 2011.
Modifications on ESS for neutrino Super Beam
ESSnuSB Project for Leptonic CP Violation Discovery based on the European Spallation Source Linac NOW 2014, 10/9E. Wildner, CERN 2 Elena WILDNER CERN for.
ESS based neutrino Super Beam for CP Violation discovery Marcos DRACOS IPHC-IN2P3/CNRS Strasbourg 1 20 August 2013M. Dracos.
Dave McGinnis Chief Engineer – Accelerator Division
1 Status of Neutrino Beamline Construction K. Nishikawa IPNS, KEK 2006 . 12 . 4.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
A new underground laboratory at Frejus Jacques Bouchez CEA-SACLAY NNN05-Aussois April 7, 2005 Historical overview Latest developments Outlook.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
ESS based neutrino Super Beam for CP Violation discovery Marcos DRACOS IPHC-IN2P3/CNRS Strasbourg 1 10 September 2013M. Dracos.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
ESS Linac Modifications for ESSnuSB Dave McGinnis Chief Engineer / Accelerator Division August 27, 2014.
1 Status of the T2K long baseline neutrino oscillation experiment Atsuko K. Ichikawa (Kyoto univeristy) For the T2K Collaboration.
2 July 2002 S. Kahn BNL Homestake Long Baseline1 A Super-Neutrino Beam from BNL to Homestake Steve Kahn For the BNL-Homestake Collaboration Presented at.
A lepton CP violation experiment using a neutrino Super Beam from ESS and a megaton water Cherenkov detector Tord Ekelöf Swedish HEP Strategy.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
Jacques Bouchez Radioactive Beams for Nuclear and Neutrino Physics Les Arcs Mars 2003.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
ICARUS-LBNE project A. Guglielmi 1.LBNE-ICARUS Padova meeting 2.SPS-C C. Rubbia presentation.
ESSνSB – Far Detector and Underground Site nd ESSnuSB Meeting in Lund Tord Ekelöf Uppsala University Tord Ekelöf, Uppsala Univerisity.
Progress on Swedish sites Garpenberg Mine LAGUNA-LBNO Meeeting Paris Tord Ekelöf Uppsala University The Garpenberg Castle built 1801.
23/11/05BENE meeting at CERN1 (22-25 November 2005) L. Mosca (CEA-Saclay) The MEMPHYS project MEgaton Mass PHYSics in a Large International Underground.
EUROnu Super Beam Work package Marco Zito (IRFU/CEA-Saclay) For the WP2 team EURONu Review CERN April
Final Results from IDS-NF Study NUFACT14 Workshop, Glasgow on behalf of the IDS-NF Collaboration Paul Soler, 26 August 2014.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
Marcos DRACOS IPHC-IN2P3/CNRS Université de Strasbourg
UK Neutrino Factory Conceptual Design
A Muon-based Accelerator Staging Scenario (MASS)
n Physics at ESS and the upgrades needed for the ESSnuSB
Challenges and Progress on the SB Horn Design
IPHC-IN2P3/CNRS Strasbourg
ESSνSB 1477 Measuring leptonic CP violation at the second ν oscillation maximum ENUBET Meeting in Padova 23June 2016 Tord Ekelof, Uppsala University
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
A BASELINE BETA-BEAM Mats Lindroos AB Department, CERN
ESS Super Beam for neutrino CP violation discovery
Uppsala Commitment to ESS and FREIA Planning
The Accelerator Complex from the International Design Study
Marcos DRACOS IPHC-IN2P3/CNRS Université de Strasbourg
Studies on Energy Deposition and Radiation for the 4horn system
The ESS Neutrino Super Beam and associated large Cherenkov Detector Design Study Lund 2014 M. Dracos.
MOMENT Overview Jingyu Tang Institute of High Energy Physics, CAS
Outline: Why now ? What ? How ?
Physics with the ICARUS T1800 detector
M. Calviani, A. Ferrari (EN/STI), P. Sala (INFN)
Neutrino Oscillation Physics with a Neutrino Factory
Muon Acceleration using 8 GeV Proton Driver Linac
Superbeams with SPL at CERN
Collector and the SPL Super-Beam Project
Neutrino beams in China
High g Li/B b-Beam Enrique Fernández-Martínez, MPI für Physik Munich
A Superconducting Proton/Electron Linac
Naotoshi Okamura (YITP) NuFact05
XVth International Workshop on Neutrino Factories, Betabeams and Superbeams LAGUNA-LBNO Many thanks to D. Duchesneau, F. Di Lodovico, T. Patzak, A. Rubbia.
A High Intensity Neutrino Oscillation Facility in Europe
The European Consortium working on the ESSνSB project
Poster session: Wednesday 6 June
The status and performance of ESSnuSB
Presentation transcript:

ESSνSB: The ESS neutrino facility for CP violation discovery Nikos Vassilopoulos on behalf of the ESSνSB group NuFact, August 2016 M. Dracos IPHC-IN2P3/CNRS/UNISTRA

European Spallation Source under construction phase (~1.85 B€ facility) NuFact, August 2016 M. Dracos IPHC-IN2P3/CNRS/UNISTRA

M. Dracos IPHC-IN2P3/CNRS/UNISTRA ESS proton linac The ESS will be a copious source of spallation neutrons. 5 MW average beam power. 125 MW peak power. 14 Hz repetition rate (2.86 ms pulse duration, 1015 protons). Duty cycle 4%. 2.0 GeV protons (up to 3.5 GeV with linac upgrades). >2.7x1023 p.o.t/year. Linac ready by 2023 (full power and energy) NuFact, August 2016 M. Dracos IPHC-IN2P3/CNRS/UNISTRA

Having access to a powerful proton beam… What can we do with: 5 MW power 2 GeV energy 14 Hz repetition rate 1015 protons/pulse >2.7x1023 protons/year p π ν decay tunnel proton beam target hadrons hadronic collector (focusing) Detector physics ⨂B conventional neutrino (super) beam NuFact, August 2016 M. Dracos IPHC-IN2P3/CNRS/UNISTRA

ESSνSB ν energy distribution neutrinos anti-neutrinos almost pure νμ beam small νe contamination at 100 km from the target and per year (in absence of oscillations) NuFact, August 2016 M. Dracos IPHC-IN2P3/CNRS/UNISTRA

Neutrino Oscillations with "large" θ13 2nd oscillation maximum P(νμ→νe) 1st oscillation maximum θ13=8.8º ("large" θ13) θ13=1º ("small" θ13) dCP=-90 dCP=0 dCP=+90 L/E L/E solar atmospheric for "large" θ13 1st oscillation maximum is dominated by atmospheric term for small θ13 1st oscillation maximum is better atmospheric solar L/E L/E CP interference CP interference (arXiv:1110.4583) θ13=1º θ13=8.8º 1st oscillation max.: A=0.3sinδCP 2nd oscillation max.: A=0.75sinδCP more sensitivity at 2nd oscillation max. (see arXiv:1310.5992 and arXiv:0710.0554) NuFact, August 2016 M. Dracos IPHC-IN2P3/CNRS/UNISTRA

Can we go to the 2nd oscillation maximum using our proton beam? Yes, if we place our far detector at around 500 km from the neutrino source. MEMPHYS like Cherenkov detector (MEgaton Mass PHYSics studied by LAGUNA) (arXiv: hep-ex/0607026) Neutrino Oscillations (Super Beam, Beta Beam) Proton decay Astroparticles Understand the gravitational collapsing: galactic SN ν Supernovae "relics" Solar Neutrinos Atmospheric Neutrinos 500 kt fiducial volume (~20xSuperK) Readout: ~240k 8” PMTs 30% optical coverage NuFact, August 2016 M. Dracos IPHC-IN2P3/CNRS/UNISTRA

M. Dracos IPHC-IN2P3/CNRS/UNISTRA Neutrino spectra 540 km (2 GeV), 10 years below ντ production, almost only QE events neutrinos anti-neutrinos δCP=0 2 years 8 years NuFact, August 2016 M. Dracos IPHC-IN2P3/CNRS/UNISTRA

2nd Oscillation max. coverage well covered by the ESS neutrino spectrum 1st oscillation max. NuFact, August 2016 M. Dracos IPHC-IN2P3/CNRS/UNISTRA

ESS Linac modifications to produce a neutrino Super Beam European Spallation Source Linac NuFact, August 2016 M. Dracos IPHC-IN2P3/CNRS/UNISTRA

How to add a neutrino facility? The neutron program must not be affected and if possible synergetic modifications. Linac modifications: double the rate (14 Hz → 28 Hz), from 4% duty cycle to 8%. Accumulator (C~400 m) needed to compress to few μs the 2.86 ms proton pulses, affordable by the magnetic horn (350 kA, power consumption, Joule effect) H- source (instead of protons), space charge problems to be solved. ~300 MeV neutrinos. Target station (studied in EUROν). Underground detector (studied in LAGUNA). Short pulses (~μs) will also allow DAR experiments (as those proposed for SNS) using the neutron target. NuFact, August 2016 M. Dracos IPHC-IN2P3/CNRS/UNISTRA

M. Dracos IPHC-IN2P3/CNRS/UNISTRA Preparing the ESS linac for operation at 10 MW with a 8% duty cycle and 28 Hz pulsing For the medium-beta elliptical-cavity part ESS is planning to use tetrodes. Thales has developed a new screen grid with graded wire thickness making operation at 10 % duty cycle possible. For the warm low-energy part of the ESS linac and the medium energy Elliptical-cavities part, ESS is planning to use modulators of the modular klystron modulator type which can be run at 28 Hz at double power by adding a capacitor charger-unit at the input. The picture shows the cryostat and test bunker at the FREIA Lab in Uppsala where a first prototype of the ESS 352 MHz spoke accelerating cavity is currently under test at 14 Hz and later on will be tested at 28 Hz. FREIA Lab, Uppsala NuFact, August 2016 M. Dracos IPHC-IN2P3/CNRS/UNISTRA

M. Dracos IPHC-IN2P3/CNRS/UNISTRA Mitigation of high power effects (4-Target/Horn system for EUROnu Super Beam) Packed bed canister in symmetrical transverse flow configuration (titanium alloy spheres) 4-target/horn system to mitigate the high proton beam power (4 MW) and rate (50 Hz) target inside the horn Helium Flow proton beam switchyard NuFact, August 2016 M. Dracos IPHC-IN2P3/CNRS/UNISTRA

General Layout of the target station (copied from EUROnu DS) Horn Support Module Shield Blocks Split Proton Beam Neutrino Beam Direction Collimators Horns and Targets Decay Volume (He, 4x4x25 m3) Beam Dump 8 m concrete NuFact, August 2016 M. Dracos IPHC-IN2P3/CNRS/UNISTRA

M. Dracos IPHC-IN2P3/CNRS/UNISTRA Energy Deposition from secondary particles, 3 horns, ESSνSB -1.6 MW/EUROnu -1.3 MW target Ti=65%dTi , RTi=1.5 cm FLUKA 2014, flair 21/12.4 kW, t=10 mm 6.3/3.4 kW, t=10 mm 2.8/1.6 kW 2.4/1.7 kW 3.5/2.4 kW 2.1/1.2 kW 13.6/9.4 kW Large increase of power deposition on target compared to SPL Ptg = 212/104 kW Ph = 52/32 kW radial profile of power density kW/cm3 (N. Vassilopoulos) Horn max large increase of power (~x2) deposited on target @ ESS NuFact, August 2016 M. Dracos IPHC-IN2P3/CNRS/UNISTRA

M. Dracos IPHC-IN2P3/CNRS/UNISTRA Which baseline? CPV (Nucl. Phys. B 885 (2014) 127) Garpenberg Zinkgruvan ~60% δCP coverage at 5 σ C.L. >75% δCP coverage at 3 σ C.L. systematic errors: 5%/10% (signal/backg.) Garpenberg mine (1230 m) NuFact, August 2016 M. Dracos IPHC-IN2P3/CNRS/UNISTRA

Systematic errors and exposure for ESSnuSB systematic errors see 1209.5973 [hep-ph] (lower limit "default" case, upper limit "optimistic" case) P5 requirement: 75% at 3 σ Neutrino Factory reach 10 years 20 years High potentiality (courtesy P. Coloma) NuFact, August 2016 M. Dracos IPHC-IN2P3/CNRS/UNISTRA

Muons at the level of the beam dump 2.7x1023 p.o.t/year muons at the level of the beam dump (per proton) y (cm) x (cm) 4.2x1020 μ/year (16.3x1020 for 4 m2) 4.1x1020 μ/year 10-3 x (cm) input beam for future 6D m cooling experiments (for muon collider), good to measure neutrino x-sections (νμ, νe) around 200-300 MeV using a near detector, low energy nuSTORM, Neutrino Factory, Muon Collider. muons/proton <Eμ>~0.46 GeV <Lμ>~2.9 km NuFact, August 2016 M. Dracos IPHC-IN2P3/CNRS/UNISTRA

ESS neutrino and muons facility ESS neutrino and muon facility 2.7x1023 p.o.t/year Neutrons to ESS ESS proton driver Protons dump nm or nm Long Baseline Detector ESSnuSB p decay Test Facility nm + ne m+ or m- Short Baseline Detector Accumulator Decay channel or ring nuSTORM Short Baseline Detector ne + nm Front end Muons of average energy ca 0.5 GeV at the level of the beam dump (per proton) Storage ring RLA acceleration Long Baseline Detector Neutrino Factory Cooling 1919 RCS acceleration Collider ring Muon Collider → ← μ+ μ- NuFact, August 2016 M. Dracos IPHC-IN2P3/CNRS/UNISTRA

M. Dracos IPHC-IN2P3/CNRS/UNISTRA Muons at ESS Carlo Rubbia Seminar at Uppsala (PIC: Parametric Resonance Cooling of muons) NuFact, August 2016 M. Dracos IPHC-IN2P3/CNRS/UNISTRA

ESSνSB at the European level A H2020 Design Study has been submitted in 2014: Decision: Overall score 13.5/15 (5/5 for Excellence): not enough to be funded (only 15 MEUR for this call) nevertheless, the evaluators recognised that ESSνSB answers one of the priorities defined in the European Strategy for Particle Physics. New application will be prepared for an ongoing EU H2020 call (deadline beginning 2017) COST application for networking has been succeeded: CA15139 EuroNuNet : Combining forces for a novel European facility for neutrino-antineutrino symmetry violation discovery (http://www.cost.eu/COST_Actions/ca/CA15139) Major goals of EuroNuNet: to aggregate the community of neutrino physics in Europe to study the ESSνSB concept in a spirit of inclusiveness, to impact the priority list of High Energy Physics policy makers and of funding agencies to this new approach to the experimental discovery of leptonic CP violation. 11 participating countries (network still growing). NuFact, August 2016 M. Dracos IPHC-IN2P3/CNRS/UNISTRA

ESS under construction September 2014 Linac tunnel completed NuFact, August 2016 M. Dracos IPHC-IN2P3/CNRS/UNISTRA

ESS Construction site (February 2016) ν p n H- NuFact, August 2016 M. Dracos IPHC-IN2P3/CNRS/UNISTRA

Possible Schedule for ESSνSB COST CA15139: 2016-2019 (just networking) EU H2020 Design Study: 2018-2021 Decision for ESSνSB: 2022 End of Linac construction: 2023 Construction of ESSνSB: 2023-2030 Data taking: 2030-2040. Rich muon program. A Design Study is needed. NuFact, August 2016 M. Dracos IPHC-IN2P3/CNRS/UNISTRA

M. Dracos IPHC-IN2P3/CNRS/UNISTRA Conclusion Significantly better CPV sensitivity at the 2nd oscillation maximum. The European Spallation Source Linac will be ready in less than 10 years (5 MW, 2 GeV proton beam by 2023). Neutrino Super Beam based on ESS linac is very promising. ESS will have enough protons to go to the 2nd oscillation maximum and increase its CPV sensitivity. CPV: 5 σ could be reached over 60% of δCP range (ESSνSB) with large potentiality. Large associated detectors have a rich astroparticle physics program. Rich muon program. A Design Study is needed. COST network project CA15139 supports this project. NuFact, August 2016 M. Dracos IPHC-IN2P3/CNRS/UNISTRA

M. Dracos IPHC-IN2P3/CNRS/UNISTRA Backup NuFact, August 2016 M. Dracos IPHC-IN2P3/CNRS/UNISTRA

M. Dracos IPHC-IN2P3/CNRS/UNISTRA Systematic errors Phys. Rev. D 87 (2013) 3, 033004 [arXiv:1209.5973 [hep-ph]] NuFact, August 2016 M. Dracos IPHC-IN2P3/CNRS/UNISTRA

Effect of the unknown MH on CPV performance "default" case for systematics (P. Coloma) small effect practically no need to re-optimize when MH will be known NuFact, August 2016 M. Dracos IPHC-IN2P3/CNRS/UNISTRA

δCP accuracy performance (USA snowmass process, P. Coloma) "default" column for systematic errors see (7.5%/15% for ESSnuSB): Phys. Rev. D 87 (2013) 3, 033004 [arXiv:1209.5973 [hep-ph]] arXiv:1310.4340 [hep-ex] Neutrino "snowmass" group conclusions NuFact, August 2016 M. Dracos IPHC-IN2P3/CNRS/UNISTRA

M. Dracos IPHC-IN2P3/CNRS/UNISTRA δCP coverage CPV (2 GeV protons) "nominal" x2 after 10 years with 2 times more statistics systematic errors (nominal values): 5%/10% for signal/background more than 50% δCP coverage using reasonable assumptions on systematic errors NuFact, August 2016 M. Dracos IPHC-IN2P3/CNRS/UNISTRA