Silvia Costantini RPC General Meeting CMS week 15 June 2010.

Slides:



Advertisements
Similar presentations
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis Run Coordinator L. Benussi H. Shahzad N. Zaganidis.
Advertisements

Project Manager P. Paolucci M. Tytgat & G. Pugliese Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis.
RPC & LVL1 Mu Barrel Online Monitoring during LS1 M. Della Pietra.
March 02, 2009LHCb Muon Commissioning meeting 1 First week of chambers test Alessandro Cardini, Davide Pinci, Fernando Rodrigues, Maria Luisa Porto, Rafael.
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Defined plateau region Knee 95% WP=knee+150V RPC operation and Hardware Performance  Annual HV module recalibration – all CAEN A3512N HV module offsets.
RPC project status Pigi Paolucci. RPC project news P. Paolucci is the new project manager for 2011/2012 We are working on the 2011/2012 organization of.
Test Pulse Analysis Carl Goodrich 7/31/07. Test Pulse The Test Pulse was injected into channels 4 and 23 –We expect channels 3, 4, 5, and 22, 23, 24 to.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
Data Quality Monitoring of the CMS Tracker
Web Based Monitoring DT online shifter tutorial Jesús Puerta-Pelayo CIEMAT Muon_Barrel_Workshop_07/July/10.
1 Status Report RPC Diagnostic with DT Segment Extrapolation Camilo Carrillo CERN Departamento de Física UNIVERSIDAD DE LOS ANDES Bogotá, Colombia.
CAF shifts and procedures Marcello, Raffaello, Alberto, Pigi, Sungeun, David, Silvia, Anna & all the 2009 shifters.
Gnam Monitoring Overview M. Della Pietra, D. della Volpe (Napoli), A. Di Girolamo (Roma1), R. Ferrari, G. Gaudio, W. Vandelli (Pavia) D. Salvatore, P.
Cover for special hardcover edition of Phys. Lett. B featuring CMS+ATLAS Higgs results 31 July 2012G. Rakness (UCLA)1 The articles were submitted today.
RPC DQA but also Monitoring for the DCS group: status and prospective for Marcello Bindi RPC L1MU Barrel DQM - 08/05/2013.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
CMS pixel data quality monitoring Petra Merkel, Purdue University For the CMS Pixel DQM Group Vertex 2008, Sweden.
1 EMC Trigger Summery from RunII and discussion for RunIII H.Torii, Kyoto Univ. ERT Lvl-1 meeting.
RPC DQM status Cimmino, M. Maggi, P. Noli, D. Lomidze, P. Paolucci, G. Roselli, C. Carillo.
2009 RPC CAF experience We did a very good exercise at the end of 2009 – 2 shifters + 1 shift leader + Experts: Costantini/Ocampo/Carillo/Cimmino/Lomidze/Tupputi/Trentadue.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
Software for the CMS Cosmic Challenge Giacomo BRUNO UCL, Louvain-la-Neuve, Belgium On behalf of the CMS Collaboration CHEP06, Mumbay, India February 16,
DQM for the RPC subdetector M. Maggi and P. Paolucci.
In the (rare) normal operation mode main actions for editing the settings of the muon system and for checking the configuration and the noise level of.
Jan 7, 2002E. Gallas/Trigger Db1 Trigger Lists and L2 Releases Elizabeth Gallas, Jeremy Simmons (Fermilab - Computing Division) See my Trigger Working.
LHC CMS Detector Upgrade Project RCT/CTP7 Readout Isobel Ojalvo, U. Wisconsin Level-1 Trigger Meeting June 4, June 2015, Isobel Ojalvo Trigger Meeting:
DT calibration software: tentative release schedule S.Bolognesi & S.Maselli & G.Mila Alignement&Calibration Meeting, 25 January 2008, CERN.
Noise results from SR1 combined SCT barrel tests Summary of some initial results Alan Barr, UCL Pepe Bernabeu, Valencia.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
CT-PPS DB Info (Preliminary) DB design will be the same as currently used for CMS Pixels, HCAL, GEM, HGCAL databases DB is Oracle based A DB for a sub-detector.
LDR 531 Week 1 Summary To purchase this material click on below link 531/LDR-531-Week-1-Summary For more details
LDR 531 Week 2 Summary To purchase this material click on below link 531/LDR-531-Week-2-Summary LDR 531 Week 2 Summary.
LDR 531 Week 4 Summary To purchase this material click on below link 531/LDR-531-Week-4-Summary LDR 531 Week 4 Summary.
LDR 531 Week 5 Summary To purchase this material click on below link R-531/LDR-531-Week-5-Summary For more details
LDR 531 Week 6 Summary To purchase this material click on below link 531/LDR-531-Week-6-Summary For more details
P. Paolucci G. Pugliese M.Tytgat
HCAL Database Goals for 2009
CMS Luminosity Status Report
Calibration Status Energy Calibration Stabilities/instabilities
CLAS12 Commissioning with Cosmincs
Online Database Status
Level 1 (Calo) Databases
Muon DPG 2012 Camilo Carrillo (INFN Napoli) Tim Cox (UC Davis)
Experience between AMORE/Offline and sub-systems
Barrel RPC Conditions Database
CMS RPC Endcap RE1 Status Report
Maki KUROSAWA VTX Group 2014 Feb 20
The IFR Online Detector Control at the BaBar experiment at SLAC
Han Jifeng BESIII MUON GROUP IHEP, CAS
RPC Detector Control System
VELO Software Status Some highlights of recent work
CMS Pixel Data Quality Monitoring
RPC Detector Control System
UK CMS Oversight Committee Mtg
The IFR Online Detector Control at the BaBar experiment at SLAC
RPC Detector Control System
Status of RPC DQM for Global DAQ in CMSSW
RPC Detector Control System: towards the final system
RPC Detector Control System
DQM for the RPC subdetector
11th Pisa meeting on advanced detectors
Status ECAL Laser Monitoring
CMS Pixel Data Quality Monitoring
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

Silvia Costantini RPC General Meeting CMS week 15 June 2010

 Noise tool used by CAF shifter since November 2009  Running smoothly  Producing: 1. Lists/numbers/plots of masked strips/to mask/to unmask 2. Low rate and dead channels 3. Summary files 4. Database files Info linked to the RPC commissioning page (good run list) 15 June 2010Silvia Costantini - RPC General Meeting - CMS Week 2

 New version producing also list of dead channels 15 June 2010Silvia Costantini - RPC General Meeting - CMS Week 3

 Connected and non-masked channels  Zero counts : 1178 strips : 1121 Total number of strips: Average: (1.05 ± 0.03) · dead strips 15 June 2010Silvia Costantini - RPC General Meeting - CMS Week 4

These numbers include strips in chambers with very low rate, like : 3 chambers W-1/RB1out/4B RE+1/2/11 RE+1/3/ : 10 chambers W-1/RB1out/4B W-1/RB1out/4F W-1/RB2out/3B W-2/RB3/8B W-2/RB4/10-B W+2/RB2out/1F RE-3/3/30 RE-3/3/32 RE+1/2/11 RE+1/3/14 15 June 2010Silvia Costantini - RPC General Meeting - CMS Week 5

 Threshold for noisy strips increased from 3 kHz/strip (~10 Hz/cm2) to 300 kHz/strip 15 June 2010Silvia Costantini - RPC General Meeting - CMS Week 6 Threshold3 kHz30 kHz300 kHz Masked581 Noisy (F/W data) Barrel2004/ /850539/257 Noisy (F/W data) E+137/13396/9259/56 Noisy (F/W data) E-41/4022/214/0 To Mask To Unmask Dead Strips1178 Low rate rolls333 Noise/roll Barrel *same 1.77 Noise/roll Endcap + *same 1.37 Noise/roll Endcap - *same 1.45 Average noise/roll, Hz/cm2, WIN data Same noise rate in WIN data because same masking configuration

15 June 2010Silvia Costantini - RPC General Meeting - CMS Week 7

15 June 2010Silvia Costantini - RPC General Meeting - CMS Week 8

 By changing the noise threshold by a factor 100, the average noise per roll (in WIN data) increases by a factor 10, from ~ Hz/cm2 to 1-2 Hz/cm2  Acceptable from the point of view of the noise, IF ok for the trigger 15 June 2010Silvia Costantini - RPC General Meeting - CMS Week 9

15 June Silvia Costantini - RPC General Meeting - CMS Week

 A description of the tool can be found in the “Online” part of: CMS IN , "Noise Monitoring Tools with RPC Online and Offline Data”, es=IN2010_002.pdf][IN2010_002.pdf es=IN2010_002.pdf][IN2010_002.pdf and in RPC DPG of March 4 th :  Instructions for CAF shifters: 15 June 2010Silvia Costantini - RPC General Meeting - CMS Week 11

 Full counts > 0  Win counts =0  connected 15 June 2010Silvia Costantini - RPC General Meeting - CMS Week 12

 By clicking, details on: run To UnMask 1073 To Mask 49 Summary Database run To UnMask 1484 To Mask 32 Summary Database run To UnMask 1552 To Mask 14 Summary Database 70 run131188/ToUnmask_run_131188_RB0_far__2010_3_17__2_5.txt 138 run131188/ToUnmask_run_131188_RB0_near__2010_3_17__2_5.txt 62 run131188/ToUnmask_run_131188_RB-1_far__2010_3_17__2_5.txt …… Summary per tower - Input file /data/LBMonitorHistos/Histos_run_131350_RB0_far__2010_3_18__12_42_32.root Total number of masked strips: 255 Total number of masked strips to unmask: 161 Total number of strips to mask: 1 Average rate per roll in WIN data: Hz Total number of noisy strips in FULL data: 92 Total number of noisy strips in WIN data: 6 Noisy for more than 15' min in WIN data: 1 ….. 15 June 2010Silvia Costantini - RPC General Meeting - CMS Week 13

 Root files with Noise plots  Text files with summary info: rate, masked strips, strips to mask or unmask, etc. Text files linked on: June 2010Silvia Costantini - RPC General Meeting - CMS Week 14

Noise results at the roll level into OMDS DB : run# = time = Roll N_masked_strips N_ToUnmask N_ToMask Rate_Hz Rate_Hz_cm2 W0_RB1out_4B W0_RB2out_4B W0_RB1in_4B W0_RB1out_4F W0_RB2out_4F W0_RB1in_4F W0_RB2in_4C W0_RB2in_4F etc. etc. 15 June 2010Silvia Costantini - RPC General Meeting - CMS Week 15