ASSEMBLY OF THE IFMIF CRYOMODULE Janic Chambrillon On behalf of the SRF-Linac Team TTC Meetting - June 5th – 8th, Saclay.

Slides:



Advertisements
Similar presentations
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Advertisements

ATLAS-NSW CERN MMM workshop assembly of the module (quadruplet)
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
LCLS-II Cryomodules Production Plans at Fermilab
APPLICATION OF EDMS TO XFEL CRYOMODULE ASSSEMBLY AT CEA Christelle CLOUE - Catherine MADEC.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
Assembly Organisation and Duration. Work Site Organisation STORAGE SMA18 UNLOADING CLEAN ROOM CERN-SITE CLEANING MANUFACTURE DIRTY TRIAL ASSEMBLY ISO7.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
Manufacturing contracts for RFQ
ESS RFQ PROJECT RISKS Anne-Catherine CHAUVEAU 14 January 2016.
INTERFACES MANAGEMENT CRYOMODULES Vincent HENNION SYSTEM ENGINEERING ACTIVITIES.
ESS CRYOMODULE RISKS REGISTER ESS CRYOMODULE COMPONENTS AND CAVITY EXPERTISE Franck PEAUGER14th January 2016.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP SELECTION CRITERIA FOR THE DECISION ON THE MM CONSTRUCTION SCHEME of June 2013 Patrick PONSOT for the CEA-Saclay-Irfu.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH VACUUM SYSTEM FROM DESY AND CEA SOLUTIONS TTC topical.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
C.MADEC - TTC meeting E-XFEL cryomodule assembly : prototyping phase at Saclay.
SRF COLLABORATION MEETING MAY.2016 ESS MEDIUM BETA CAVITY MANUFACTURING CEA Saclay/ESS ECCTD WU Cavités | Enrico Cenni.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
Hao Guo LINAC Department Institute of Modern Physics.
ESS RFQ INTERFACES | Didier CHIRPAZ-CERBAT CEA-ESS INTERFACES.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
Vacuum experiences on XFEL Beam Position Quadrupole Units (BQU) preparation Marco Schalwat TTC Topical Workshop on SRF Cryomodule Clean Room Assembly CEA.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
1 & 2 JUNE 2015 – LLRF – BEAM DYNAMICS WORKSHOP URIOT Didier What is taken into account in simulations LLRF – Beam dynamics Workshop.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
K. TAVAKOLI Upgrade of the superconducting RF cavities at soleil K. Tavakoli SOLEIL Synchrotron, France.
Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
CONFIGURATION MANAGEMENT AND CONTROL PLAN ESS Quality Assurance and Control workshop (30June) V. HENNION.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
Field Emission Minimization for LCLS-II
Cryomodule test stand at ESS site
Status and plans for the 3.9 GHz section of XFEL
at STFC Daresbury laboratory
Medium beta cryomodule demonstrator M-ECCTD
DESY Experiences on Use of Gas overlay during Assemblies
Cleanroom Upgrade in SM18 Optical Inspection bench
Definition of work flow for string DESY Example on critical operation
6th srf collaboration lasa 13 June CAVITY interfaces - Vincent Hennion / PIERRE BOSLAND Bonjour, Franck Peauger, Je suis Ingénieur RF.
C50 Cavity pair Assembly Changes
XFEL Tuner system non-conformities Detected At saclay
UK RFD Pre-Series cryomodule
WP 3 coordination meeting Saclay May 2008
XFEL Cold mass & vacuum vessel non-conformities Detected At saclay
RAPPEL TITRE PRESENTATION
Teleconference ACS – FREIA 20th February 2018
IMP Cryomodule Assembly and Alignment
IHEP Cryomodule Status
INSTITUTE OF HIGH ENERGY PHYSICS
Cryomodule Assembly Plan
F. Peauger (mainly for CM components)
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL main evolutions between M-ECCTD and serie - Bonjour, Franck Peauger, Je.
Identification and marking of ESSI deliverables
Cryomodule Product Breakdown Structure and configuration traceability
XFEL cryomodule production and Reliability improvement
Quality assurance and Quality control organisation
Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL SAFETY AND RAMI INPUTS - Franck Peauger OLIVIER KUSTER (INSTALLATION AND.
Magnetic shielding and thermal shielding
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
10th srf collaboration LASA JUNE CAVITY interfaces - Vincent Hennion
Presentation transcript:

ASSEMBLY OF THE IFMIF CRYOMODULE Janic Chambrillon On behalf of the SRF-Linac Team TTC Meetting - June 5th – 8th, Saclay

CONTENT The IFMIF cavity string Test and trial on cavity string elements BPM’s buttons Trial assembly outside the cleanroom Trial assembly in cleanroom ISO5 Test on the needle bearings Cavity coupler assembly Cavity tuner Cryomodule assembly Conclusion | PAGE 2 TTC meeting - June 2016

Cavity string 3 assembling scenarios in cleanroom written: Cavity/coupler assembly (12 steps + Leak Test). Cavity/solenoid assembly. (6 steps+ LT) Cavity string assembly (7 steps + LT + references to the cavity/solenoid assembly). 1 scenario for the post-cleanroom assembly (21 majors steps). | PAGE 3 TTC meeting - June 2016 THE IFMIF CAVITY STRING Cavity Power coupler Support frame Cavity pumping line Cold-Warm transition Solenoid

To validate and / or improve the clean room assembly procedure and the associated tools a test bench as realistic as possible was needed. A frame, a little bit bigger than one eight of the final support and equipped with linear guides and the positioning system, was manufactured. Because of the late delivery of the final elements, a dummy cavity, a dummy solenoid and a dummy coupler were manufactured. | PAGE 4 TTC meeting - June 2016 TEST AND TRIAL ON CAVITY STRING ELEMENTS Auxiliary linear guide assembled on the support frame with two carriages equipped with positioning adjustment elements

BPM’s buttons of solenoid packages Cleaning test done in cleanroom ISO class 5. Ultra sonic bath + Ultra Pure Water (UPW) rinsing. Blowing with N 2, and particle courting.  no particle emission after 1 min. Trial Assembly outside the cleanroom Test the assembly procedure of a solenoid and a cavity equipped with its coupler. Tests were carried out with mock-ups. Led to some improvements (new adjustment screws, C-templates, carriages without slack) | PAGE 5 TTC meeting - June 2016 TEST AND TRIAL ON CAVITY STRING ELEMENTS Positioning of the cavity with the C-template Alignment flanges Calibrated gauges are used to with the C-template when positioning Checking the cleanliness

Trial assembly in cleanroom ISO 5 Assembly of the button on the BPM. Test an assembly sequence and configuration. Despite there was no High Pressure Rinsing done, the monitoring showed good results. To be confirmed on a real solenoid after a HPR. Connection between the solenoid and the cavity (mock-ups). Training outside of the cleanroom was very beneficial.  Quicker positioning and assembly of the elements. The assembly test bench could be use to train the contractor in charge of the assembly. | PAGE 6 TTC meeting - June 2016 TEST AND TRIAL ON CAVITY STRING ELEMENTS Assembly sequence of the buttons Particle monitoring during assembly of the buttons Cavity and solenoid connected

CEA design new bearing without ferromagnetic materials | PAGE 7 TTC meeting - June 2016 TEST ON THE NEEDLE BEARINGS Bearing cage and needles magnetized Brass Ceramic Needle bearings and C-shape elements Similar to the one used on X-FEL cryomodule, they allow to manage the thermal contraction of the support frame with respect to the cavity string ( see TTC 2014: Original bearings are subject to magnetization

The cage of the bearing was glued with Stycast , followed by 3 thermal shocks in liquid N 2 (~77 k). No defect after the thermal shocks. The bearings were tested on the test bench and validated. | PAGE 8 TTC meeting - June 2016 TEST ON THE NEEDLE BEARING

Test on the assembly tooling Currently tested with the mock-ups. Test on going with threaded shafts replacing bolts. The scenario will be tested in cleanroom in the frame of SatHori (test stand for a cavity/coupler assembly). If validated, this tool could be used for the assembly of the cavity / coupler assemblies of the cavity string. | PAGE 9 TTC meeting - June 2016 CAVITY - COUPLER ASSEMBLY Level adjustment of the cavity on the tooling Coupler ready for the fine alignment with cavity Alignment flanges in correct position Assembly done

Assembly of the first tuner Checking of the motor stoke and command. Trial assembly on the cavity mock-up. | PAGE 10 TTC meeting - June 2016 CAVITY TUNER First cavity tuner assembled on the cavity mock-up

Assembly of the cryomodule at Rokkasho September 2015: project decision to assemble the cryomodule in Japan, on the QST site at Rokkasho. A clean room will built by QST. F4E will be in charge of the assembly (sub-contracted), CEA will provide technical assistance. Cavities, couplers and solenoids will be validated in Europe, packed in double-sealed bags in ISO 5 before shipment to Japan. Cryomodule components (vacuum vessel, thermal shield, support frame, magnetic shield, helium circuitry …) are being manufactured in Europe. | PAGE 11 TTC meeting - June 2016 WHAT’S NEXT?

| PAGE 12 TTC meeting - June 2016 CLEAN ROOM AT ROKKASHO

| PAGE 13 TTC meeting - June 2016 CLEAN ROOM AT ROKKASHO QST manages the installation of the clean room and associated ancillary equipment. F4E and CEA provide technical input for the definition of the clean room requirements, including ancillary requirements.

| PAGE 14 TTC meeting - June 2016 ASSEMBLY STORYBOARDS Based on the assembly tests performed at Saclay, CEA has written assembly storyboards. Will be included as annexes in the technical specifications for the assembly contract (F4E responsibilities).

Manufacturing the cryomodule components in Europe and assembling it in Japan is challenging. Importance of the quality control: No workshop available at Rokkasho during the assembly. Strong control during factory acceptance: every tapped hole shall be controlled on every component. Every possible assembly should be tried before shipping to Japan (ex: magnetic shield in the vacuum vessel). Magnetic hygiene: permeability control on every component close to the cavities. To prepare the clean room assembly, CEA performed assembly tests using mock-ups. These one could be used by the assembly contractor to train the operators. | PAGE 15 TTC meeting - June 2016 CONCLUSION

DRF Irfu Commissariat à l’énergie atomique et aux énergies alternatives Centre de Saclay | Gif-sur-Yvette Cedex T. +33 (0) xx xx | F. +33 (0) Etablissement public à caractère industriel et commercial | RCS Paris B Thank you for your attention