5 November 2002J.Pater - Systemtest Report1 Endcap Systemtest Current Grounding/Shielding status Recent Upgrades to sector Measurements with 6 Modules.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

UKDC2 Stavelet with Tandem Converters Peter W Phillips.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Layer 0 Grounding Requirement in terms of noise performance Grounding/Shielding studies with L0 prototype Summary Kazu Hanagaki / Fermilab.
AMS-02 tracker mechanics status of construction, assembly, integration Production: - Ladder integration - Installation on planes Inner tracker assembly:
Opto Harness FDR 19/10/01 T. Weidberg1 Opto Harness FDR Scope and aims of review, system overview Available documentation Status of Project & Schedule.
November Vertex 2002 Kazu Hanagaki1 Layer 0 in D0 Silicon Tracker for run2b Kazu Hanagaki / Fermilab for D0 run2b Silicon Tracker group Motivation.
1 Calice Analysis Meeting 13/02/07David Ward Just a collection of thoughts to guide us in planning electron analysis In order to end up with a coherent.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Chain of Modules using 1cm wide Cu Tape between hybrids SP- SP+ M0 M1 M2 M3 Initial test used External shunt control (subsequently reverted) Photo shows.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Physical Approach to the ASM-VFM residual investigation National Space Institute, DTU 3. December 2014.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
PROFIBUS wiring/installation can be done with:
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Modelling of TPM noise problems Greg, following discussions and measurements with David and Senerath.
Dogleg Thermal Tests : Configuration 7 6 AiN plate side Jan SM+LB 8 Dogleg side Heater (0.4W) flow 2 Temperature sensors located.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
2-d Insulation Analysis of Clamp / Vacuum Vessel Insulation crushing
Stavelet Update Peter W Phillips 29/07/2011. Serial Powering with a Stavelet Module: Recent Results Whilst single SP modules in the “chain of hybrid”
Jochen Ebert, Uni Karlsruhe1 Powering via cooling pipes very first results.
Todd Moore for the DES CollaborationNov 28, Noise test hardware & software setup. Earth grounding scheme utilized for noise tests. Block diagram.
Installation and operation of the LHCb Silicon Tracker detector Daniel Esperante (Universidade de Santiago de Compostela) on behalf of the Silicon Tracker.
Low mass carbon based support structures for the HL-LHC ATLAS pixel forward disks R. Bates* a, C. Buttar a, I. Bonad a, F. McEwan a, L. Cunningham a, S.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
And now for something completely different First results from the DC-DC Stavelet Peter & Ashley with Giulio & John.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
07 - Winter 2005 ECE ECE 766 Computer Interfacing and Protocols 1 Grounding Grounds: –Common reference for the circuit –Safety What is the potential problem.
ROV Cameras. Extending Your Camera We want your ROV to be able to see the sea! (And the pool)
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Service Connectivity from Module to PP1b Eric Anderssen LBNL Pixel Services Meeting, CERN.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Summary of Winding Pack Thermal Results K. Freudenberg
Grounding Studies Metal box sensor SVX4/hybrid Analog cable GND(20W)
Adders in drawer Test of TileCal Level 1 Interface drawer patch panel trigger cable ca 70 m receiver pre-processor TileCal patch panel RP patch panel TileCal.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
SPD CFSS screening/Harness RB24-RB26 /ALICE Week A. Pepato – INFN PD 1 CFSS and ES electrical screening for SPD Harness RB24-RB26 Electrical.
AMS-02 tracker mechanics status of construction, assembly, integration Ladder assembly Ladder installation on planes Integration details, cooling loop,
1 Outer Barrel, Phase 2 Mech Review 26 Aug 2013, indico: Antti Onnela, CERN Tracker Phase 2 Mechanics Review, 26 August 2013 Status of the Outer.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
D. Greenfield CLRC1 End-cap Engineering Status Report Debbie Greenfield, RAL UK-V 30 October 2002.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Preparation for production phase Web – New web with HV pigtail qualified (?) – Installed on 2 views in Technical run Very little effect on noise; detector.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
BASIC INSTRUMENTS - oscilloscopes
D. Greenfield CLRC1 End-cap Mechanics FDR Baseline Design Overview Debbie Greenfield, RAL 1 November 2001.
Endcap assembly update C Buttar, R French UK-V Cluster RAL 8 th Sept 2004.
TECHNICAL PAPER ON SIMULTANEOUS AC-DC POWER TRANSMISSION
Noise results from SR1 combined SCT barrel tests Summary of some initial results Alan Barr, UCL Pepe Bernabeu, Valencia.
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
Mikolaj Cwiok, 10 June 2009 RPC Operation Day Towards LB configuration through TS: Improvements to CCU ring stability Mikolaj Cwiok – University of Warsaw.
Ftksim at high luminosity Monthly meeting September 22, 2008 Anton Kapliy.
EC: 7 DISK concept Preliminary considerations
Berkeley status Aug 10th, 2012.
TOTEM Electronics Status
MODULE QUALIFICATION STATUS AT LIVERPOOL
End-cap Mechanics FDR Overview of the Project
Discussion items SVD mechanics session.
Meeting on Services and Power Supplies
Mini-drawers, FE-ASIC , Integrator
Services Layout – Update
WP02 PRR: Master Oscillator and RF Reference Distribution
GlueX Electronics Review Jefferson Lab July 23-24, 2003
ATL-IC-ES new version available - approval starts
Presentation transcript:

5 November 2002J.Pater - Systemtest Report1 Endcap Systemtest Current Grounding/Shielding status Recent Upgrades to sector Measurements with 6 Modules –Basic performance –First tries at noise injection Plans

5 November 2002J.Pater - Systemtest Report2 Three Grounding Schemes All 3 schemes have: –continuous shielding VME crate to Cu sector enclosure, –(~) all power lines AC connected to shield at PPF1, –system of interconnected foil rings on disk face. Differences: –“Shunt Shields In” Built-in shunt shields on module + isolation layer on cooling block all modules’ DGNDs connected to shield at PPF0 –“Shunt Shields (~) Shorted” Shunt shields still there but electrically bypassed DGNDs not connected at PP0 –“Doubleshort” Shunt shields ‘shorted’ DGNDs connected together at PPF0 All 3 schemes perform equally well with no noise injected

5 November 2002J.Pater - Systemtest Report3 Measurements with 3 Modules

5 November 2002J.Pater - Systemtest Report4 Injection onto Tapes “Shunt shields in” (black) vs. “Shunt shields shorted” (red) “DoubleShort” scheme (Note different vertical scale)

5 November 2002J.Pater - Systemtest Report5 Injection onto Pipes “Shunt shields in” (black) vs. “Shunt shields shorted” (red) “DoubleShort” scheme (Note different vertical scale)

5 November 2002J.Pater - Systemtest Report6 Ground Scheme Comparison with 3 outer modules: Summary A hybrid G&S scheme seems to work to best against injected noise: –Short around shunt shields i.e. DC-connect all GNDs together at cooling circuit –Also connect all DGNDs together at PPF0 –NB this is based on one measurement; needs verification.

5 November 2002J.Pater - Systemtest Report7 July/Aug: Upgrades to System Now can simultaneously read out 6 modules of different types –Many problems with connectorised power tapes and Molex patch panels Shielding improvements: –Added missing filtering caps at PPF1 (V dd -shield, V cc -shield) –Improved screening of 50  tapes –Added Cu sheet PPF1-thermal enclosure; used to improve interconnection of cable shielding

5 November 2002J.Pater - Systemtest Report8 6 Modules on Sector Position O11 not working Back of disk: one module in position M10

5 November 2002J.Pater - Systemtest Report9 6-Module Run, no noise injection Blue = in test box at institute Yellow = alone on sector Purple = 6-module run

5 November 2002J.Pater - Systemtest Report10 6 Modules, noise injection onto cooling pipes (shunt shields in) Little or no pickup on inner and middle modules More pickup on outer modules than before Not understood, but… … electrical connection of cooling pipes to outside world is not well simulated in systemtest – needs improvement

5 November 2002J.Pater - Systemtest Report11 6 Modules, noise injection onto power tapes (shunt shields in) Injected similar signal as in 3-module case –no pickup seen (!) Injected MORE –very little pickup seen (see plot to right  ) Recall grounding/shielding improvements: –more filtering at PPF1 –better shielding and connections between PPF1 and sector box Recent work suggests that the solidity of the electrical connection between PPF1 and the thermal enclosure is crucial.

5 November 2002J.Pater - Systemtest Report12 Near-future Plans Upgrades: as soon as is practical: –Make cooling pipes’ exit from thermal enclosure more realistic –Install new on-disk tapes, PPF0s (provided initial tests show satisfactory performance) Repeat injection with all 3 G&S schemes –To verify previous observations with outer modules –To see what happens with middles and inners If “doubleshort” scheme still best: –Remove shunt shields from modules to verify that it is not needed. –Address what to do electrically at cooling block. Check: is pickup ~simply function of proximity to tape? –Test other outer positions, upper and lower –Vary distance silicon-to-tape. Need add-on for cooling block.