E & I 8 th Summit Shree Power Bwr 22-Jan  25 MVA TR-1 testing carried out. TR-1 Power-Transformer-Testing-12jan15.pdf.

Slides:



Advertisements
Similar presentations
Daikin Altherma™ Troubling Shooting
Advertisements

38GXC(Q)/40GXC(Q) Service Training Sizes 18 and 24K.
Power Supply System John Joseph LBNL Spectrometer Solenoid Test Plan Review Feb 17 th 2012.
Oxygen Concentrators.
Graphic Symbol Location 1. DIN Terminal X52 The machine is powered by electricity using copper cable with 5 wires (3 phase wires + neutral wire +
Electrical Notes.
GO ORDNANCE !!! ORDNANCECORPS 1 Troubleshoot the DC Electrical Control System on the EPP III.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
Unit Transformer Unit transformer are step up transformer which is connected to generating house & step up voltage from 15kV voltage to 132 voltage level.
COMPARISON OF 3PHASE AND SINGLE PHASE POWER PLANTS REMOTE SENSING IN BTS STATION.
Chapter 8 Output Modules.
© ABB Group August 13, 2015 | Slide 1 Power Generation Service Life Cycle Management for Power Plants Daniel Looser, Power Gen Europe in Amsterdam, June.
Electrical Electricity Fuses Relays Solenoids Electrical Testing
Freedom Combi Inverter
1 CREZ COMMUNICATIONS Presented by American Electric Power Telecommunications Engineering Matt WilliamsDon Demand Columbus, OHTulsa, OK.
Amplifier Circuit This amplifier circuit DC analysis.
Oconee RPS/ESPS Digital Upgrade Presented by: Michael Bailey June 3,
Diode voltage multiplier circuit (Specifically diode voltage doubler circuit). By:Engr.Irshad Rahim Memon.
Milki Wakweya Jennifer Long Fairman Campbell Pranav Boda Advisor: Dr. Ajjarapu.
TEV DUMP SWITCH FAILURES OF 2/10/09 Dan Wolff/EE Support.
Grundfos FLOW THINKING Air conditioning the Grundfos Way.
11 September 2015Electricity Merit Badge Class Jamboree1 Electricity Merit Badge Class 3 – Electric Power We Use Alternating Current (AC) Safety.
MCS’S MAGNUM DIAGNOSTICS PACKAGE Visit us at
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
Electrical Systems.
NSTX Centerstack Upgrade: initial discussions of the Machine Protection System (MPS) Robert Woolley 4 November 2009.
EU 1000i and EU 2000i SECTION: Tools and Equipment ISSUED: REVISED: ##-####
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
Melo EDP PT Session 2 – Block III – Question 9.1 Barcelona May EDP Distribuição Energia ASD Immunization to Voltage Dips Case Study in Cement.
CONTROL BOX RMG
Twenty Questions Electricity 2. Twenty Questions
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
Second part is the oscillator itself. Hardware circuit that converts a DC signal to an AC signal. Frequency of the oscillator.
NERC Lessons Learned Summary LLs Published in September 2015.
A Presentation On 132 KV GSS BEHROR
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Department of Electrical Engineering
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
Submitted To:- Submitted By:- Mr.
18240 Element two - Components INPUTS OUTPUTS PURPOSE TYPICAL USE.
RHIC SYSTEMS Power Supplies, Superconducting Magnets, Quench Protection, etc. 7/11/06.
19.2 Domestic electricity Paying for electrical energy  Most of the electrical appliances in your home use mains electricity.  Mains electricity: alternating.
Reverse Parking Sensor Circuit.
Presentation Topic: Circuit Breakers Represented to: Dr. M. Riaz Khan Represented by: M. Mujahid.
7/15/2002PP.AFD.09 1 of 43 Yaskawa Electric America Variable Frequency Drives In HVAC Applications.
TECHNICAL PAPER ON SIMULTANEOUS AC-DC POWER TRANSMISSION
Best practice small scale commercial refrigeration, optimisation strategies and simple maintenance Michael Bellstedt, Minus40 Pty Ltd.
Proportional and Servo Valves
By : VAIBHAV KUMAR IV YEAR, VII SEM ELECTRICAL ENGINEERING.
S A Griffiths CM42 June 2015 Electrical & Control.
Seminar on Practical Training By: Er. Kapil Kantia Electrical Engineering BIO-MASS ENERGY DIVISION.
Electrical Configuration and System Protection
VMCL ELECTRONIC DIVISION.
APPLICATIONS Designed and manufactured to meet the needs for constant pressure required by modern plumbing systems, such as : Domestic applications and.
ELECTRICAL SAFETY a culture, a habit not just a set of rules, regulations to be followed. Presented by: S.K.Patra, Jr. Manager (Electrical)
Electrical & Control.
NERC Published Lessons Learned Summary
ABB i-bus® EIB Electronic Switch Actuator, 4-fold
What is meant by ‘Preventive Monitoring’?
PLC BASED AUTOMATION OF FUEL OIL PUMP HOUSE DRIVES IN TPS-2
LEVEL CONTROL USING ULTRASONIC
Hazardous Areas & Hazards of Electricity
Electric Currents from Magnetism
CONTROL BOX RMG
Module 1 – Power Supply AMC APS-PBC-60
KELMAN CIRCUIT BREAKER ANALYZER
Confidential Oilfree Scroll Compressor   Simplex/Multiplex SRL kW   Troubleshooting Hitachi Industrial Equipment Systems Co., Ltd. Air Compressor.
Presentation transcript:

E & I 8 th Summit Shree Power Bwr 22-Jan-2015

 25 MVA TR-1 testing carried out. TR-1 Power-Transformer-Testing-12jan15.pdf

 Rewiring of booster fan VFD. TTPL 260KW VFD PANEL-Model.pdf12.pdf

 Damage ESP coil replace with new coil instead of replacement of whole assembly,Saving of Rs1500 per coil  Aux reduction to 900 units.  DG set and lights provided for tower erection work in Bwr Khaas.  Review APC and APFC scheme of GPP-1  Under frequency setting of cement plant drives revised.

 Safety mat at ACC mcc,SMP mcc & ht vfd room.  Isulation coating at LAVT,NGR & PCC area.  Fire alarm sytem in ACC,RO-2 & SMP mcc  Damaged ESP rapper coil replacement.  RLA of old equipments such as Transformer,CB,CT & PT  TR KV breaker pole overhauling.

Shree Power RAS 22-Jan-2015

 Best practices implemented.  Technical issues.  Future plans.

 In gland seal valve set point was given through pneumatic PID controller for its operation.  Its failure will result in tripping of TG.  Now a bypass arrangement is made in which input signal is given through I/P converter and whose output is given to gland seal control valve.  Set point is given through PID which is programmed in DCS  Benefits:- Tripping can be avoided. Maintenance & spare cost of Controller is reduced

 Fuji make CO analyzer is installed in Boiler-2.  In CO analyzer the value is oscillating form negative to positive and at last it is showing max value  The Analyzer also showing Error no-3 which means circuit is faulty.  Action taken :- Detector voltage set as per given voltage.  Counter set  Sensor signal voltage set to1.8V.

 Cooling coil replace with new one in Package AC-1  Its wiring modification done as per requirement  Protection circuit is now in line.

 Check Charging and discharging cycle of Battery bank and replace faulty batteries.

 Work permit and work clearance system implementation through ERP.

 Life of FGD plant PH sensor.

 Replace all JORC make ADV with Solenoid valve.  AC450 DCS upgradation.  GPP-1 UPS battery bank replacement.

THANKS