ATLAS ATCA cooling evaluation project Claudio Bortolin (EP-ADO-PO) Michal Kalinowski (EP-ADO-PO) Lukasz Zwalinski (EP-DT-FS) ATLAS cooling team – 2016.

Slides:



Advertisements
Similar presentations
Matt Warner Future Facilities Proactive Airflow Management in Data Centre Operation - using CFD simulation to improve resilience, energy efficiency and.
Advertisements

André Augustinus 16 June 2003 DCS Workshop Safety.
Key HVAC Design Concepts. Agenda Discuss relevance of thermal enclosure system to HVAC system. Present the three major steps to design an HVAC system.
Wine Cellar Split System Basics. Definitions Split System – A cooling unit that “splits” the cooling coil and the condenser apart into two remote pieces.
The 5-slot 4U DC chassis is one of a line of products that Asis has developed over the years with it’s vas experience in the ATCA field. Asis AdvancedTCA.
The 5-slot 5U AC Chassis,fully field deployable chassis with AC power supply for full redundancy. AsisAdvancedTCA Class Asis AdvancedTCA Class.
Air Flow Bench Presented By: Saket Karajgikar & Nikhil Lakhkar Advisor: Prof. Dereje Agonafer.
Asis AdvancedTCA Class Fan Tray Fan tray is a component responsible of supplying sufficient shelf cooling According to the Parameters send from the shelf.
Asis AdvancedTCA Class. What is PICMG? PICMG - The PCI Industrial Computers Manufacturer's Group Is a consortium of over 450 industrial computer product.
September 26, 2013 xTCA work group Evaluation results from AC/DC converters for xTCA Collaboration (CERN PH-ESE-BE) Vincent Bobillier, Matteo Di Cosmo,
STEAM HEATING.
AIR QUANTITY REQUIRED TO TRANSFER HEAT IN A FORCED AIR SYSTEM In all four mechanical systems considered, the transfer of heat, either by taking it out.
1 The Support Structural System for Sicbar and EC Detector of SciBooNE FermiLab/PPD/MD May 08, 2006 Edward Chi.
Sensor-Based Fast Thermal Evaluation Model For Energy Efficient High-Performance Datacenters Q. Tang, T. Mukherjee, Sandeep K. S. Gupta Department of Computer.
1 Active Floor. 2 General information 3 Active floor layout Main points: EC fan Blades Grilles.
NRC Rack in USA15 Discussion on Monday with Martin J. and Agostino L. In short: our proposals do not work Current ATCA shelves incompatible with LHC racks.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
The EWZ building Presentation of the building Presentation of the building The design issue The design issue The building concept The building concept.
GSM sites Cooling systems description Standard Air Conditioner SystemEmergency Cooling SystemEnergy Saving Cooling System Air Conditioner Cooling system.
A water-cooling solution for PC-racks of the LHC experiments  The cooling concept  Rack Model  Cooling Test  Rack Performance  Failure Tests  Future.
Electronics Enclosures
Dealing with Hotspots in Datacenters Caused by High-Density Computing Peter Hannaford Director of Business Development EMEA.
M. Joos, PH/ESE1 ATCA for ATLAS - status Activities of the working group PH/ESE xTCA evaluation project Next steps.
High Gain Mystery of WS(1-5) Solved (Hopefully…) C.Woody HBD Meeting April 13, 2010.
The 2-slot 2U DC chassis is one of a line of products that Asis has developed over the years with it’s vast experience in the ATCA field. Asis AdvancedTCA.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
We can…. 2 GLOBAL REFERENCES Rev: 00 References :
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
ATCA cooling tests Claudio Bortolin (PH-ADO) Damian Dyngosz (PH-DT) George Glonti (PH-UAT) Julian Maxim Mendez (PH-ESE) Lukasz Zwalinski (PH-DT) xTCA IG.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
ATCA COOLING PROJECT INTERSHIP FINAL PRESENTATION Piotr Koziol.
Muon barrel cooling G. Aielli and J. Godlewski LS1 TC planning.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
Technical Analysis. 1500U Floor area 1500 cm P drawer style Floor area 2064 cm 2 LET’S FOCUS ON IT!
Ventilation & Airflow NetShelter CX 18U,24U,38U Ambient office air is drawn in to the soundproofed air-intake chambers on either side of the NetShelter.
Status of integration in USA15. Status of rack layout 20/03/2015FTK Italia - A. Lanza2 Rack Y A2 equipped with turbine cooling system and nominal.
FLATPACK Rev.5 September 2002 Updated versions may be available.
DSLAM Configuration in a Cabinet Heat and Noise testing December 2008.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Prevention and Control of Influenza A (H1N1) in the Workplace Engr. Nelia G. Granadillos Chief, Environment Control Division Occupational Safety and Health.
FTK crates, power supplies and cooling issues 13/03/20131FTK-IAPP workshop - A. Lanza  Racks, crates and PS: requirements  Wiener crates  Rittal crates.
EMERGING TECHNOLOGIES AVAILABLE TO REDUCE COMPRESSED AIR DEMAND Double Acting Air Cylinder Double Acting Air Cylinder Air Operated Diaphragm Pumps Air.
Power consumption (Watts) LBB27 ROS18 TSC50 TIM8 1 SC crate416 Alignment20 TOTAL per rack906~1 kW X2J22X2J02 With a water flow of 10 l/min, it should.
FTK infrastructures and DCS 02/12/20101FTK Initial Design Review - A. Lanza  Crates  Single rack layout  Cabling  Rack placement  DSS  DCS.
CANOVATE MOBILE (CONTAINER) DATA CENTER SOLUTIONS
Elliott Microturbines Absorption Chiller Integrated System Development
Status of the CERN ATCA specification and tender
T-simulation OUTLINE Inputs to the T-simulation: chips, boards, crate mechanics and fan T-simulation performed into two steps: On large scale: simple AM.
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Rack Design Proposal as of 01/03/2013
FTK infrastructure in USA15 Status and plans for 2015 A
Markus Joos CERN EP/ESE EP/ESE ATLAS CMS M. Joos, CERN
Proposal of a specification for ATCA shelves for experiments at CERN (for phase 1) Vincent Bobillier, Stefan Haas, Markus Joos, Julian Mendez, Sylvain.
RF operation of REX-ISOLDE
CEDAR Detector Ventilation System Review
COOLING & VENTILATION INFRASTRUCTURE
Motivation Performance of power plants using ACC may largely be affected by wind conditions Up to 10% reduction in net plant power output for 10 m/s wind[1]
Robert Gomez-Reino Garrido
ADAGIO.
ATLAS USA15 - Rack 52U with 9U crates, remote PS
Track Finder Crate, Backplane and Parts
ATA Melbourne Branch presentation April 2008 Jim Lambert
Thermal behavior of the LHCb PS VFE Board
Smokes extraction principle
Minimizing Heating & Cooling Costs
TEC assembly and commissioning at Lyon
Series 5300 Lithium Cell Formation System
Exhaust gas intake to cabin air.
Liebert DSE High efficiency thermal management
Door Heat Exchanger: Specification
Presentation transcript:

ATLAS ATCA cooling evaluation project Claudio Bortolin (EP-ADO-PO) Michal Kalinowski (EP-ADO-PO) Lukasz Zwalinski (EP-DT-FS) ATLAS cooling team – 2016

Project motivations Vertical and horizontal air flow cooling tests on a standard LHC rack 52U  Cooling capabilities of the LHC rack need to be checked changing from VME Crates to ATCA shelves.  Identify potential in-rack bottlenecks and airflow resistance sources. Propose possible alternatives/solutions to remove them and test any adaptations. Crosscheck running complementary simulations to confirm solution improvement and/or to identify issues.  To compare different configurations (horizontal and vertical airflow), checking the possible failure modes and the relevant impact on the thermal performance. 2  Mechanical improvements on the rack to optimize the cooling performance (i.e.: removal of turbine chassis, fans trays, water flow in the cooling door, etc.)  To evaluate thermal and safety aspects of the environment for the future installations in the ATLAS counting rooms (i.e.: noise, air conditioning, etc.)

Rack 52U 14 U 15 U Vertical cooling configuration 3 30 x Temperature sensors (accuracy 0.1C) 8 x Velocity sensors (accuracy 0.05 m/s) The sensors layout was changed according to the kind of tests we were carrying out. Plexiglas panel Heat exchange area Air/water heat exchangers (1U), providing up to 3.8 kW of thermal capacity each Back view of the heat exchanger Exchanged surface reduced (approx. 2/3) Plexiglas panel installed to improve the leak tightness Heat exchangers T sensors Flow stopper

Inside the shelve Zone 1 Zone 2 Zone 3 Zone 4 Inlet 1Inlet 2 Rear Front Comtel load blades: maximum power 350W Front Rear ASIS load blades: maximum power 600W 14 x Comtel blades: 6* Embedded Temperature sensors (green) + 6 air T sensors (blue) 14 x ASIS blades: 6 air Temperature sensors (inlet and outlet) 3x 1x 3 x 3 fans on the top (air pull), 1 x 6 fans on the bottom (air push). 96 W x fan.

Failure mode: full power only in one crate Mixed water data taken while ATCA 1 was fully powered Flow: 0.8 m 3 /h T inlet 15.5C, T outlet 20.9C Q= mC p (T out - T in ) = 0.22 × 4.18 × ( )= = 5.01 kW 5 Fan system off Max target T

Air Temperatures Air temperatures comparison shows that the simulation reproduced lower T, the difference was about 5C. Simulations carried out by ASIS with the same configuration The plot shows the average temperatures measured on the air deflector, before and after HX1 with only ATCA 1 full power ASIS run new simulations using our measurements as input data. It was identify a general lack of performance of the 25% (i.e.: leaks). Further simulations identify another issue.

Flow distribution issue RTM zones ASIS comments: 1)In order to improve the flow instability on the RTM side try to remove the bottom fan tray and rely only on the pull flow. 2)Introducing gaps between heat exchangers and try to improve the whole heat exchangers surface.

New layout (October 2015) In the RTM volume the flow circulation was not effective and the suggestions of ASIS were: 1)To remove the chassis bottom fans 2)To Introduce some gaps before and after each heat exchanger TURBINE ATCA2 GAP Heat Exchanger 2 GAP ATCA1 GAP Heat Exchanger 1 GAP Heat Exchanger 3 Air Deflector

ATCA 1 All ON and ATCA 2 ONLY FANS Zone4 Removing bottom fans improved significantly the performance: flow distribution more homogeneous.

ATCA2 14x343[W] – Comtel Load Boards (Top) ATCA1 14x322[W] – Asis Load Boards (Bottom) With Bottom Fans Without Bottom Fans Max power limited by the a smaller power supply of the top shelf

With Bottom Fans Without Bottom Fans ATCA2 14x343[W] – Comtel Load Boards (Top) ATCA1 14x322[W] – Asis Load Boards (Bottom) 4th heat exchangers added between ATCA 1 and 2 The average T decreased of 3-4 degrees

With Bottom Fans Without Bottom Fans ATCA2 14x343[W] – Comtel Load Boards (Top) ATCA1 14x322[W] – Asis Load Boards (Bottom) Air T increased without bottom fans: more effective heating removal

High power test ATCA2 13x350 [W] slot 9 at 336[W] – Comtel Load Boards (Top) ATCA1 14x400[W] – Asis Load Boards (Bottom) 4th heat exchanger between ATCA 1 and 2 Lower power due to an hardware issue Averege maximal temperature on load blades [ °C] Top shelf Botto m shelf 49.4

Horizontal cooling layout Cooling Door Air Inlet Air Outlet Air Inlet ASIS 16U with ASIS LB ASIS 16U with Comtel LB Water In/Out T W out T W in Air Outlet T air in T air out T door in T door out Air Vel in Air Vel out

With Bottom Fans Without Bottom Fans ATCA2 14x350[W] – Comtel Load Boards (Top) ATCA1 14x350[W] – Asis Load Boards (Bottom)

With Bottom Fans Without Bottom Fans ATCA2 14x350[W] – Comtel Load Boards (Top) ATCA1 14x350[W] – Asis Load Boards (Bottom)

Air Velocity - Horizontal Air velocity measurements

Temperature Inlet/Outlet Chassis Shelves Air Temperature inlet - Outlet

Water Temperature Inlet/Outlet Mixed water data taken while the shelves were fully powered Flow: 1.8 m 3 /h T inlet 16 C, T outlet 18.6 C Q= mC p (T out - T in ) = 0.5 × 4.18 × ( )= = 5.43 kW (50% of the total power)

Cooling Door Temperature Inlet/Outlet The air T outlet is about 2.5 degrees higher of the environmental temperature. Inlet air T Without BF With BF

Noisy measurements (HSE group): Horizontal shelves Dist. 80 cm Dist. 140 cm The level of noise increased of 3 db every time the number of equipment is doubled. For future installations in the room it will be required to take actions in order to reduce the level of noise (acoustic isolation panels, etc.) HSE expert report: For safety reasons the access to the counting room once equipped with many racks will be allowed only to people that followed the required safety training, wearing the ears protection equipment, and the daily exposition to the noisy must be limited. >85 db for 8 hours a day required safety personal protection and a yearly medical check for the operators

Horizontal or vertical cooling? HorizontalVertical Use of COTS xTCA shelvesCustom xTCA shelves mandatory (related NRE costs and potential higher lead-time) Sufficient cooling capacity available per rack (up to 15kW per cooling door with water inlet at 13C, now we have 16C!) Limited heat-exchanger efficiency (2/3 of surface capacity resulting in 2kW cooling power) Heat of 48V AC-DC removed by the rack rear cooling door48V AC-DC converter (horizontally cooled) must be placed outside of vertical airflow (below the deflector and its cooling must rely on the CR AC) Less damage risk in case of water leak from the heat exchangerRisk of water dripping on the ATCA electronics Independent shelf airflow (one shelf could be turned OFF while the other is loaded) Cross shelf airflow dependency (in case one shelf is stopped the other sees a high airflow resistance). Can lead to potential electronics overheating Racks to be modified and equipped with rear cooling doorsReuse of the rack (horizontal heat exchangers and deflectors may have to be repositioned) In-rack smoke detection must be adapted for rear-cooling doorsReuse of the existing rack infrastructure (smoke detection, monitoring and control) Front and back cabling must be managed appropriately in order not to obstruct the air inlet and outlet Free access to both sides of the shelf Some racks are currently equipped with a full height glass front door. It is not know yet if such doors can be used with horizontal airflow Racks can be closed with doors Higher level of noise (~85 m and 75 % fan speed)Also noisy…. Easier to install sound absorbing material

Summary New test setup in ATLAS SR1: We are going to build a new test bench for long term cooling tests on the surface. The goal is to have it ready from June Removing the shelves bottom fans we observed a more homogeneous flow distribution and the average temperature in the load boards decreased significantly. Horizontal cooling: 23 The 4 th Heat exchanger is required to keep the temperature below 50C, the best average boards T achieved was about 46C. Vertical Cooling Removing the shelves bottom fans we observed a more homogeneous flow distribution and the average temperature in the load boards decreased significantly. The best average boards T achieved was about 45C The environmental temperature could become an issue once equipping the room with many shelves. Shelves are very noisy (safety measures must be taken: sounds barriers etc.) Shelves are noisy (safety measures must be taken: sounds barriers etc.)