Power consumption (Watts) LBB27 ROS18 TSC50 TIM8 1 SC crate416 Alignment20 TOTAL per rack906~1 kW X2J22X2J02 With a water flow of 10 l/min, it should.

Slides:



Advertisements
Similar presentations
SCT Power Supply Installation Schedule Jan Bohm, Prague AS, 4 th November 2005 The SCT Power Supply System will be installed in 22 LV&HV racks situated.
Advertisements

André Augustinus 16 June 2003 DCS Workshop Safety.
Using Copper Water Loop Heat Pipes to Efficiently Cool CPUs and GPUs Stephen Fried President Passive Thermal Technology, Inc.
Components of HVAC System
Power Supply System John Joseph LBNL Spectrometer Solenoid Test Plan Review Feb 17 th 2012.
Filling, purging and air removal
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.
Keep Control: PULPO 2 ESO‘s new housekeeping unit Christoph Geimer, Claudio Cumani, Nicolas Haddad, Javier Reyes, Javier Valenzuela, Bernhard Lopez PULPO.
Installation. Indoor Unit Installation Typical Installation.
High Density Cooling Air conditioning for high density applications
Mounting Direction Water Cooler Best solution OK Risk of air bubbles in the system Heatsink Water channels Inlet Outlet.
Learning, our way Examples of bad installation. CONTENT Installation related examples Installation related examples Application related examples Application.
RO400FC Forced convection hot air reflow oven. In a flexible production, what do you need for soldering of  Complex PCB’s  Soldering of fine pitch on.
Installation. Indoor Unit Installation Typical Installation.
Engineer Training Machine New Features TJ8300 / TJ8500 Machine New Features.
1 Active Floor. 2 General information 3 Active floor layout Main points: EC fan Blades Grilles.
Building a PC. Motherboard Selection Ensure the selected motherboard is appropriate for the processor model and frequency you are planning to use AMD.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
1 HBD Air Cooling System TK Hemmick for the HBD group 8/25/06.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Submerged PC Cooling By: Patrick Hague Geoffrey Clark Christopher Fitzgerald Group 11.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Alex Madorsky University of Florida/Physics Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts Alex Madorsky.
1 Daniel Dobos University Dortmund Pixel Testbeam July 2003 Daniel Dobos University Dortmund – E4 ATLAS-/Si-Meeting Pixel Testbeam July.
CPPM Pixel Evaporative Cooling Plant Description & Operation with C 3 F 8 or C 4 F 10 G. Hallewell, CPPM, Feb 07, 2005.
High Gain Mystery of WS(1-5) Solved (Hopefully…) C.Woody HBD Meeting April 13, 2010.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
ATCA cooling tests Claudio Bortolin (PH-ADO) Damian Dyngosz (PH-DT) George Glonti (PH-UAT) Julian Maxim Mendez (PH-ESE) Lukasz Zwalinski (PH-DT) xTCA IG.
ATF hardware status - Orbit Stabilization T.Naito(KEK) ATF2 Project meeting Laboratoire de l'Accélérateur Linéaire (LAL) 1.Orbit oscillation.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
06/03/2002Ivan Hruska EP/ATE1 LV brick for TILECAL  Overview Design summary Results from 2nd radiation tests in PSI Villingen Bulk supply Plans for future.
Installation of the T600 at Fermilab CSN2, September 22,
ATCA COOLING PROJECT INTERSHIP FINAL PRESENTATION Piotr Koziol.
Muon barrel cooling G. Aielli and J. Godlewski LS1 TC planning.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
Problem Solving using Error Code Saijo Denki Inverter R-410A
Ventilation & Airflow NetShelter CX 18U,24U,38U Ambient office air is drawn in to the soundproofed air-intake chambers on either side of the NetShelter.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
© 2012 MITSUBISHI HEAVY INDUSTRIES – MAHAJAK AIR CONDITIONERS CO., LTD. All Rights Reserved. Bad case of Installation RAC-B-A07.
News on FTK rack infrastructure A. Lanza – INFN Pavia FTK Italy meeting –
ATLAS ATCA cooling evaluation project Claudio Bortolin (EP-ADO-PO) Michal Kalinowski (EP-ADO-PO) Lukasz Zwalinski (EP-DT-FS) ATLAS cooling team – 2016.
FTK infrastructures and DCS 02/12/20101FTK Initial Design Review - A. Lanza  Crates  Single rack layout  Cabling  Rack placement  DSS  DCS.
HNC/D Engineering Science
Unit 2: Chapter 2 Cooling.
Rack Design Proposal as of 01/03/2013
Service channels between Tracker and PP1
DCS: Temperature Probes
DCS: Temperature Probes
Steam Generation In any industrial process, large quantities of steam are consumed. If natural gas is used to heat the boiler water it is often advisable.
TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME.
352MHz Klystron Control for the 3MeV Linac test stand
DT Infrastructure: LV, HV, Gas
Racks Coordination 16 September 2011 E. Negodin
Lesson 24 NATURAL CIRCULATION
AC Repair & Furnace Repair - Tips To Consider
Insertable B Layer Cooling System
Recirculating CO2 System
Track Finder Crate, Backplane and Parts
Series 5300 Lithium Cell Formation System
Error codes for split systems
AUTOMATIC AIR-CONDITIONING SYSTEM OPERATION
Needed for Team A on -End
Presentation transcript:

Power consumption (Watts) LBB27 ROS18 TSC50 TIM8 1 SC crate416 Alignment20 TOTAL per rack906~1 kW X2J22X2J02 With a water flow of 10 l/min, it should imply a difference in temperature of the water in and out of 1.27ºC (if the system is 100% efficient). 2 Cooling tests SC rack.CMS Week. February 2007.

Cooling tests SC rack.CMS Week. February At B904, one rack was filled with: - 2 LBB crates, - 2 SC crates, - 12 final ROS boards, - 2 TIM final boards, - 12 Dummy TSC boards with the same power consumption that the finals and similar heat distribution. 2/3 Heat Exchangers, water cooling, turbine, air deflector, etc. similar to the final system. 12 PT-100 sensors for temperature reading. 3 Water in Water out Room Tª Air on top of LBB crate ROS up.Top SC. ROS down.Top SC. TSC up.Top SC. TSC down.Top SC. TSC up.Bottom SC. TSC down.Bottom SC. ROS up. Bottom SC. ROS down. Bottom SC.

It turned out that first days we had been running with a water flow of 2.5 l/min. Effectively we could run to a stable temperature with one SC crate on, but not with two. A filter in the pipe of the water in was almost totally obstructed. It was repaired, and from that point we had a flux of 10 l/min. Water out Tª – Water in Tª = 1,2ºC => we were dissipating 847 watts. Cooling tests SC rack.CMS Week. February We must ensure that in the final system the water flow is at least 10 l/min 52ºC Two SC poweredOne SC powered 40.5ºC 3ºC 520 W 4ºC 690 W

Cooling tests SC rack.CMS Week. February BEFOREAFTER Water out temperature (as well as the rest of the temperatures in the rack) follows much less room temperature. Isolate the rack as much as possible. Insure air tightness. -Heat exchangers (part out of the air circuit). -Separation between crates, air deflector and HE mainly in the bottom part. -Rack sides, the air was escaping.

Cooling tests SC rack.CMS Week. February Difficult access to the HE in the racks YB+2 and YB+1, where RPC cables are already installed. HE top HE bottom

∆Temp TSC Top SC9°C ∆Temp TSC Bottom SC8°C ∆Temp ROS Top SC3°C ∆Temp ROS Bottom SC2.6°C Cooling tests SC rack.CMS Week. February Sensor on equalizer at ROS ~ 30ºC Sensor on device under mezzanine. ~ 21.5ºC Sensor on ROS PCB (air temperature) 3 HE

Cooling tests SC rack.CMS Week. February Maximum temperature on TSC basically does not change. Air is cooled down by ~ 2ºC.

It seems the air is escaping through the back part of the board since its impedance is lower. Forcing the air to go through the front part helps on dissipating, by means of increasing slightly the temperature of the lower part of the TSC. Cooling tests SC rack.CMS Week. February Effect of blocking the air in the back part of the TSC on the Top SC crate. - Upper sensor decreases by 4ºC (42.7ºC to 39ºC) - Lower sensor increases by 1.5ºC (37ºC to 38.5ºC) Equilibrate air impedance in the TSC. 2 HE

Cooling tests SC rack.CMS Week. February Low Power consumption but high air impedance. ROS And TSC Alignm. sensor 6U boards Front view Lateral view Alignm. ROS And TSC 6U boards Covers

Cooling tests SC rack.CMS Week. February Insert Align. crate Insert Align. Modules On the right Move modules to the left. On top of 6U boards. <0.5 ºC ~1 ºC If possible, remove covers and move Alignment modules to the left most part of the crate, on top of the 6U part.

Need of a DSS interlock fast enough that turns off the power supplies when the temperature increases to high levels. -What action is taken in the DSS system when the temperature exceeds a value? How fast is that action? -Is monitorization of the air flow included? -If air flow fails, what type of alarm is generated? -What is the action taken by that alarm? It turns down the Power supplies? Which granularity? Cooling tests SC rack.CMS Week. February This is with 6 TSC and 12 ROS.

Cooling tests SC rack.CMS Week. February Turn on 12 TSCs Turn on 12 ROS Two sensors were located in the bottom of the upper LBB crate. One in the front part of the crate and another one in the rear part. The temperature of the air that comes out from the warmest part of the TSC is 32ºC, however, the air that reaches the bottom part of the upper LBB is maximum 22ºC. The temperature of the air of the lowest LBB crate is 19ºC.

Cooling tests SC rack.CMS Week. February  Make sure that the water flow is around 10 litres/minute.  Isolate rack and Heat Exchangers as much as possible with aluminium plates and tape to improve air tightness.  Three Heat exchangers instead of two does not seem to improve much maximum temperatures but could help to cool down the air.  The biggest impact is the air impedance:  Equilibrate as much as possible in the TSC. Compare air impedance of dummy TSC with the final ones.  Alignment crate increases air impedance.  It seems it could be possible to move modules to the left part.  Remove covers.  DSS interlock system to power off crates on temperatures or any rack alarm.