CARE05, 25Nov2005V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.

Slides:



Advertisements
Similar presentations
EuroNu CERN February 5, 2008 Marco Zito Super-Beam work package Marco Zito Dapnia-Saclay On behalf of the SB w2 team EuroNu 5/2/2008 Thanks to M. Dracos.
Advertisements

Neutrinos in CHIPP Allan Clark Neuchâtel Meeting June 2004.
European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
Accelerator based Neutrino program around the world 1. Europe: Neutrino platform at CERN ESS second maximum? 2. Japan: T2K and HyperK status 3. USA: LBNF.
Neutrino Oscillation Physics at a Neutrino Factory Rob Edgecock RAL/CERN-AB.
Reunion GDRν, College de France,Paris,\20Oct05V. Palladino BENE and the ISS Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at.
14 mars 2007M. Dracos, Neutrino Design Study1 Neutrino Oscillation Facility Design Study in FP7.
ISS-4 22 August IRVINE Alain Blondel NEUtrino DETectors N-EU-DET 4-years working plan for Neutrino Detector R&D to take place in ~ objectives.
CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
Eurisol User Group, 14 Jan 2008V. Palladino ν beams: prospects today & synergies with Eurisol" Neutrino beams: prospects today & synergies with Eurisol.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
CARESG, 13 Sep 2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
Welcome to the First Meeting of the An International Scoping Study of a Neutrino Factory & Super-beam Facility.
Neutrino physics: experiments and infrastructure Anselmo Cervera Villanueva Université de Genève Orsay, 31/01/06.
Scoping study r-ECFA Alain Blondel Future Neutrino Oscillation Experiments: towards a world-wide design study An International Scoping Study of a Neutrino.
Alain Blondel Neutrino physics in Switzerland collaborate among ourselves and in Europe to ensure a rich programme collaborate in T2K leading role in GLACIER,
ICL, 7/1/2010,UKNF Collaboration MeetingV.Palladino Status and Plan for FP7-NEU Status and Plan for FP7-NEU2012 the Accelerator Neutrino Network.
Scoping study p-ECFA Alain Blondel ISS-detectors Introduction: working group plans, organization and aims of the meeting.
WP5: Detector Performance and Cost EuroNu Launch Meeting 5 February 2008 Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera Villanueva,
Introduction to EC Framework Programme 7 Rob Edgecock CCLRC Rutherford Appleton Laboratory Introduction to Framework Programmes “ “ FP7 Neutrino LOI Mapping.
Future Accelerators at the energy frontier Peter Hansen february 2010 University of Copenhagen.
ISS After One Year Peter Dornan Imperial College London.
21 August 2006P Dornan - After ISS1 Discussion  NuFact Talks Comments  Report 1 st Draft Oct – 60 Pages per WG Finalise before end of the year.
European design study on Neutrinofacilities - Euronu within FP7.
CARESGV. Palladino: Status Report from BENE Status Report from BENE V. Palladino, CARESG, College de France, Sep BENE established on.
Introduction to BENE08 fifth & last BENE workshop Tuesday Dec 2-3 CERN meeting focusing on the BENE Final Report to be published as a CERN Yellow.
Networking Activity on Beams for European Neutrino Experiments BENE-Next ….. MEGLIO? Motivation Work Packages Partners & resources First ideas for the.
Anselmo Cervera Villanueva IFIC (Universidad de Valencia & CSIC) EURODET meeting 7 December 2007 Neutrino Networking activities.
WP5: Detector Performance and Cost EuroNu Meeting CERN, 26 March 2009 Paul Soler Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera.
Road Map of Future Neutrino Physics A personal view Ken Peach Round Table discussion at the 6 th NuFACT Workshop Osaka, Japan 26 th July – 1 st August.
An International Scoping Study of a Neutrino Factory & Super-beam Facility.
Concluding remarks R. Aleksan CERN, November 25, 2005 CARE is almost 2 year old What comes next ?
MICE collaboration meeting Alain Blondel october MICE collaboration meeting 13 at RAL News The international context Goals of the meeting.
Alain Blondel. AIDA-Neutrino meeting AIDA Neutrino detector studies 1. News from the neutrino scene 2. Beam requirements for AIDA 3. Discuss.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
A new underground laboratory at Frejus Jacques Bouchez CEA-SACLAY NNN05-Aussois April 7, 2005 Historical overview Latest developments Outlook.
The ISS Peter Dornan Imperial College London. 16 March 2006P Dornan - MUTAC `atmospheric’`solar’ `cross/reactor’ Oscillation defined by 3 mixing.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
27 Apr 2006P J Dornan - ISS3 - RAL Next Meeting 4 th ISS Plenary –Irvine Aug21, 22 (NUFACT06 Aug 24 – 30) Workshops –Physics Group, June, Valencia –Machine.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
1 Neutrino detector test beam requirements 0. Disclaimer 1. News from the neutrino scene 2. Beam requirements for AIDA and others.
NuFact06, 28 Aug 2006V. Palladino European Regional Outlook V. Palladino NuFact06 UC Irvine, Tue Aug 29, 2006 European Regional Outlook.
CERN, 27/11/2009,86th Plenary ECFAV.Palladino Status and Plan for FP7-NEU Status and Plan for FP7-NEU2012 the Accelerator Neutrino Network in the.
BENE MECC detector Pasquale Migliozzi INFN – Napoli.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
Jacques Bouchez Radioactive Beams for Nuclear and Neutrino Physics Les Arcs Mars 2003.
Ionization Cooling for Muon Accelerators Prepared by Robert Ryne Presented by Jean-Pierre Delahaye MICE Optics Review Jan, 2016 RAL.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
EUROnu Review: 14 th April 2011 EUROnu Introduction and Objectives Neutrino oscillations: much interest since 1 st paper in extension required to.
CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
23/11/05BENE meeting at CERN1 (22-25 November 2005) L. Mosca (CEA-Saclay) The MEMPHYS project MEgaton Mass PHYSics in a Large International Underground.
Final Discussion THE EUROPEAN STRATEGY FOR FUTURE NEUTRINO PHYSICS
Accelerator R&D for Future Neutrino Projects
for the EURISOL Steering Committee
CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino
Alain Blondel 11 October 2010 GDR NEU2012 summary
The Way Forward ISS to IDS
Outline: Why now ? What ? How ?
Milestones & Deliverables BENE III period Jan 06 - Jun07
as of today 123 registered participants
ECFA recommendations (September 2001:)
XVth International Workshop on Neutrino Factories, Betabeams and Superbeams LAGUNA-LBNO Many thanks to D. Duchesneau, F. Di Lodovico, T. Patzak, A. Rubbia.
A High Intensity Neutrino Oscillation Facility in Europe
A High Intensity Neutrino Oscillation Facility in Europe
Fermilab Proton Beams: Program Perspectives Greg Bock Fermilab Science and Engineering at Henderson-DUSEL Capstone Workshop Stony Brook May 5,
Presentation transcript:

CARE05, 25Nov2005V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road map for accelerator based neutrino programs in Europe A complex multi-parameter problem International Scoping Study of a future Neutrino Factory and Superbeam facility (ISS) FP7 Design Study of next European Accelerator Neutrino Facility “Euro ν” DS in world wide collaboration W orld DS

CARE05, 25Nov2005V. Palladino Report on BENE Activities Accelerator R&D CARE Multipurpose (e,p, ) ???? CARE SRF CARE PHIN CARE HIPPI CARE NED EUROTEV DS: ILC+CLIC ????? EURISOL DS: Neutrino  -beam ???? DS Fact Scoping study ? DS Fact? EUROLEAP e in plasma? Major Strategic decisions

CARE05, 25Nov2005V. Palladino Report on BENE Activities P ee =1- …..Pe=Pe= P  =1- ….. P  =1- ….. P  = P  e = ……. P  e = Pe=Pe= P  = ….. The matrix of neutrino transition probability

CARE05, 25Nov2005V. Palladino Report on BENE Activities P ee =1- ….. P e  = - 4 Re J e  12 sin 2   - 4 Re J e  13 sin 2    - 4 Re J e  23 sin 2    ± 8J sin   sin   sin   P  =1- ….. P  =1- ….. P  = - 4 Re J  12 sin 2   - 4 Re J  13 sin 2    - 4 Re J  23 sin 2    ± 8J sin   sin   sin   P  e = ……. P  e = - 4 … - 4 …  - 4 …  - (± 8J…. P e  = - 4 Re J e  12 sin 2   - 4 Re J e  13 sin 2    - 4 Re J e  23 sin 2    ± 8J sin   sin   sin   P  = ….. T & CP violating term e -iδ universal The matrix of neutrino transition probability Solar (SuperK,SNO) LBL Reactors (Kamland) Atmo K2K, NuMI, CNGS ….. experiments ahead of us, for decades …….. ν e ↔ ν μ crucial atmo

CARE05, 25Nov2005V. Palladino Report on BENE Activities Two years of BENE in a nutshell 2004 BENE established on the EU scene MMW workshop May 2004: the MMW frontier Villars SPSC meeting Sep 04, where we cashed renewed attention to a Eu ν program (R&D) emergence of a ν “construction window” !!!!!!!!!!! Betabeam DS approved ! 2005 BENE consolidated on the EU & international scene –NNN05 in April and NuFact05 in June physics case further established in the two workshops R&D advancing : HARP+MUSCAT data out, MERIT+MICE approved, making the ν case in the strategic discussion ahead CARE-Report BENE.doc CARE-Report BENE.doc ISS launched, aiming resolutely to DS Proposal

CARE05, 25Nov2005V. Palladino Report on BENE Activities proud to have gotten this far Matching our two crucial 2005 milestones Physics case developped as far as possible today in the most international context possible becoming a polished BENE Interim Report Design Study road traced by ISS in spite of outstanding difficulties smaller size of our community & its core of active people CERN contribution being resurrected only now (very slowly) richness of options that makes consensus more laborious NB legitimate different scientific interests do exist collapse of FP6 calls and more

CARE05, 25Nov2005V. Palladino Report on BENE Activities

CARE05, 25Nov2005V. Palladino Report on BENE Activities

CARE05, 25Nov2005V. Palladino Report on BENE Activities After a few nice forward jumps 1 step back and ½ step forward approval of BENE NA within I3 (CARE) MMW Workshop Villars & beyond FP6 Design Study? I3ν? Mar 05 Niet! 1 year ISS FP7&WDS Design Study Nov 04 Niet! Jun 05-Aug 06 Mar 07? Mar 05

CARE05, 25Nov2005V. Palladino Report on BENE Activities Two main physics strategies use of the high neutrino rate (>10 20 /year) and energy (10-50 GeV) of Neutrino Factory + LMD (“Hyper-MINOS”) detector of large but not huge mass ( Kt), necessarily magnetic (a dense magnetized Iron detector, or, possibly, Li-Argon), a few 1000 Km away. use of the lower neutrino rate ( /year) and energy (sub-GeV) of Betabeam + Megaton (“Hyper-Kamioka”) low density detector of very large mass (0.5-1 Mt) and volume (0.5-1 Mm 3 ) non magnetic (a Water Cerenkov detector, or possibly, again Li-Argon), a few 100 Km away.  ν e + ν    νe  νe

CARE05, 25Nov2005V. Palladino Report on BENE Activities BetaRing Muon Complex G.Sasso LMD 0.1 Mton Frejus 1 Mton Water C Garoby Haseroth Lindroos EU Neutrino Complex Proton complex

CARE05, 25Nov2005V. Palladino Report on BENE Activities Superbeam (high power conventional beams) is less performing, per se but does have technical synergy with the NuFact largely coincides with the front end of a Factory solving the technical challenges of a several MegaWatt proton driver and target & collection system, on the way to build a factory, yields a superbeam facility essentially for free (not its detector, however!) and does have scientific synergy with the Betabeam can use the same detector combination has some truely unique features: 1) oscillation signal is ν e →ν μ in the first, ν μ →ν e. in the second, one calibrates the signal (and background) of the other ! 2) T-reversal and CPT asymmetries can be measured likely to be integrated in both strategies   ν  ν

CARE05, 25Nov2005V. Palladino Report on BENE Activities Esample of comparison of physics reach: θ 13 and CP violating phase Figure 7 : 99%CL  sensitivity of the beta-beam, of the SPL-SuperBeam, and of their combination, see text. Dotted line is the combined Superbeam+beta- beam sensitivity computed for sign(  m 2 )=-1. Sensitivities are compared with a 50 GeV Neutrino Factory producing 2   decays/straight section/year, and two 40 kton detectors at 3000 and 7000 km Comparable merits : NuFact somewhat better and more versatile for ν oscillations Megaton offers sinergy with N decay and more NB conclusions highly preliminary based on still not well agreed yardsticks must now be re-scrutinized much more in depth (ISS) !!!

CARE05, 25Nov2005V. Palladino Report on BENE Activities Betabeam + MegatonNuFact + LMD are complementary !!!!!!!!!!! each has merits unaccesible to the other (matter effects, CP, T, CPT violation, p decay, astroph. & cosmology.. ) by means of truely international collaboration we could and should aim at having both facilities A general remark and we must push both very actively catch opportunities wherever they emerge seriously aim at building one in Europe in the “construction window” ! !

CARE05, 25Nov2005V. Palladino Report on BENE Activities Further caveat Intermediate solutions also emerging ! Higher energy and higher rate betabeams heading to detectors at intermediate distances thou technically more difficult ( beta acceleration in new higher energy SPS or LHC !) do deserve very careful attention

CARE05, 25Nov2005V. Palladino Report on BENE Activities 100 participants HyperK UNO Memphys

CARE05, 25Nov2005V. Palladino Report on BENE Activities All aspects of Megaton physics revised and updated state of the art material for full elaboration of BENE physics case

CARE05, 25Nov2005V. Palladino Report on BENE Activities Strong reinforcement of international cooperation achieved …………………………………………………………

CARE05, 25Nov2005V. Palladino Report on BENE Activities 200 participants All aspects of future ν physics revised and updated state of the art material for full elaboration of BENE physics case

CARE05, 25Nov2005V. Palladino Report on BENE Activities NuFact Scientific Program To be inserted

CARE05, 25Nov2005V. Palladino Report on BENE Activities Sunday June 26 9:00-13:00 1) Physics Studies : Status & priorities 1) Accelerator R&D : Status & priorities 2) Neutrino Detectors: Status & priorities WW R&D Session PANEL & OPEN DISCUSSION Launch International Scoping Study … to report at NuFact06

CARE05, 25Nov2005V. Palladino Report on BENE Activities A Summer School accompanied the workshop: 22 students, 12 lecturers

CARE05, 25Nov2005V. Palladino Report on BENE Activities The International Scoping Study (ISS) on Neutrino Factories and Superbeam s A joint venture, jointly set up by the coordinators of the US Neutrino Factory Collaboration the Japanese NuFact-J Work Group the Eu BENE Network and the host (RAL) UKNF Collaboration to lay the foundation of a full blown International Design Study that must advance to same level of progress as Betabeams S. Geer Y. Kuno V. Palladino K. Peach

CARE05, 25Nov2005V. Palladino Report on BENE Activities started in March-April by RAL All aspects included, except accelerator Betabeam studies

CARE05, 25Nov2005V. Palladino Report on BENE Activities International Scoping Study : agenda for one year Sep CERN a success !!! Late January KEK Mid April RAL Late AugustNuFact06 in Irvine hopefully, NuFact06 will launch International Design Study and FP7 Eu Design Study Matching funds + topical intermediate workshops Physics, London, Nov.

CARE05, 25Nov2005V. Palladino Report on BENE Activities Detectors (NEW!) Water Cherenkov (1000kton) Magnetized Iron Calorimeter (50kton) Low Z scintillator (100 kton) Liquid Argon TPC (100 kton) Hybrid Emulsion (4 kton) Near detectors (and instrumentation) Physics compare performance of various options on equal footing of parameters and conventions and agreed standards of resolutions, simulation etc. identify tools needed to do so (e.g. Globes upgraded?) propose « best values » of baselines, beam energies etc.. Accelerator: -- proton driver (energy, time structure and consequences) -- target and capture (chose target and capture system) -- phase rotation and cooling -- acceleration and storage evaluate economic interplays and risks include a measure of costing and safety assessment (A.Blondel) (Y. Nagashima) (M. Zisman) P. Dornan NB BetaBeam included The three sectors of SS (andDS)

CARE05, 25Nov2005V. Palladino Report on BENE Activities Int. Scoping Study(*) Design Study BENE : the longer term plan CDR … at the time of end of LHC payment first LHC results ILC decision be ready to catch any construction window Physics feasibility Feasibility & TPW HIPPI, HARP MERIT MICE PRISM, EMMA NB Betabeam CDR End 2009 ! Construction window

CARE05, 25Nov2005V. Palladino Report on BENE Activities The HARP experiment TPC Forward Spectrometer Total Acceptance Scan CERN PS energy range … RCS is an option

CARE05, 25Nov2005V. Palladino Report on BENE Activities (US, Japan, CERN&RAL) holds the key to any superbeam !!! tests the single shot behavior at MMW driver of target and collection (solenoid, horn?) should make that more known better supported and manned should evolve that into a MMW target and collector Test Area? The most crucial experiment for the future of the ν can we master the MMW? The MERIT ( nTof 11) experiment

CARE05, 25Nov2005V. Palladino Report on BENE Activities Liquid jet target in 15T mag. field

CARE05, 25Nov2005V. Palladino Report on BENE Activities MICE …. crucial demonstration esperiment for the feasibility of a Neutrino Factory muon ionisation cooling Phase I completely funded by now- Datataking starts April

CARE05, 25Nov2005V. Palladino Report on BENE Activities

CARE05, 25Nov2005V. Palladino Report on BENE Activities Emma

CARE05, 25Nov2005V. Palladino Report on BENE Activities One crucial task of BENE in the ISS year assemble a real EDS (Eu DesignStudy) collaboration !!!!! that will sign and provide the manpower & largest part of the funds, matching funds, for a FP7 bid able to have the blessing of ECFA and good odds of approval in Brussels. find the synthesis of so far not obviously converging interests CERN, INFN, CCLRC, IN2P3, CEA, PPARC, CSIC, Germany?, Belgium, NIKHEF, everybody CERN positive attitude towards the ISS and BENE’s initiative willingness to assemble a small ISS task force will no doubt greatly help a few fractions of FTE can make an impact

CARE05, 25Nov2005V. Palladino Report on BENE Activities Plans for the year ahead Interim BENE Scientific Report, based on NNN05,NuFact05, ISS Draft input to the strategic discussion in progress FPA, POFPA Akesson/Peach Strategy group (Orsay Jan 30) Conclude Scoping Study (NuFact06) define the content of WDS and FP7 DS Assemble FP7 Collaboration prepare FP7 proposal bridge over Aug 06 to FP7 funding (1Jan2008?)

CARE05, 25Nov2005V. Palladino Report on BENE Activities Milestones & Deliverables BENE III period Jan 06 - Jun07 BENESG 1/ month Jan Feb Mar Apr May Jun Jul Aug Sep Nov Dec Jan Feb Mar Apr May Jun

CARE05, 25Nov2005V. Palladino Report on BENE Activities THE END