CERN/BE/CO – Claude Dehavay - Sept.2016 (with input from Z.Zaharieva and M.Vanden Eynden) 1.

Slides:



Advertisements
Similar presentations
Making the System Operational
Advertisements

Software Quality Assurance Plan
ITIL: Service Transition
Florida’s Water Management District Permitting Website – Phase II (Permitting Portal II)
Zornitsa Zaharieva BE-CO-DA, CERN 15 November 2013 Asset and Maintenance Management Workshop November 2013.
The TIMING System … …as used in the PS accelerators.
Adam Jansen Digital Archivist Washington State Archives ISB Presentation Status Report for Digital Archives.
Thomas Baron 4th June » 20 member states » 2300 staff people in 10 departments » >10000 users on site ˃608 universities and 113 nationalities »
Transaction Processing System  Business Transactions are certain events that occur routinely in a business firm.  A transaction is a set of activities.
JPV, TB of Nov.15 th, ‘Rack Status‘ Jean-Pierre Vanuxem, PH-AIS.
14 December 2006 CO3 Data Management section Controls group Accelerator & Beams department Limits of Responsibilities in our Domains of Activities Ronny.
Barriere O, Le Roux P
MICE Controls Progress 15 th March 2007 * Controls Infrastructure * Controls network * Target * Superconducting Solenoid * Magnet Power Supplies * Hydrogen.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Dec 8-10, 2004EPICS Collaboration Meeting – Tokai, Japan MicroIOC: A Simple Robust Platform for Integrating Devices Mark Pleško
15/12/10FV 1 Common DCS hardware. General ideas Centralized system: o Common computers. Detector dedicated computers (with detector participation) only.
California State University, Northridge Certification Process Team B Carlos Guzman John Kramer Stacey LaMotte University of Phoenix.
Corporate Technical Infrastructure Management From MP5 to a Corporate Technical Infrastructure Management System.
Nov, F. Di Maio, M.Vanden Eynden1 CO Proposal concerning AB Front-End Software Responsibilities First detailed proposal based on the global Front-end.
CERN Control Standards Front-End Computer Layer Stéphane Deghaye BE/CO/FE
Controls Renovations and End of Life (EoL) plan of major components of the controls infrastructure Eugenia Hatziangeli.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
Review of MPE activities during LS1 and outlook for LS2/LS3 View from BE/CO V.Baggiolini, M.Vanden Eynden On behalf of the BE/CO APS, DA, DO and FE Sections.
Maintenance Management Project EN Dept. Implementation Project Mario Batz EN-CV Maintenance Management Workshop 25 th November 2011 EDMS EDMS
LS1 Review P.Charrue. Audio/Video infrastructure LS1 saw the replacement of BI and RF analog to digital video transport Was organised in close collaboration.
Jan 23rd, 2008M.Vanden Eynden on behalf of the AB-CO Group1 AB-CO MTTR & Spare Part Policy for the LHC Injectors, Experimental Areas & other Facilities.
The ACCOR Project Status Report and Outlook for 2010 and beyond M.Vanden Eynden on behalf of the ACCOR Project Team 1M.Vanden Eynden (BE/CO) - IEFC Workshop,
2/2/12 2ACCOR PROJECT – BE-CO-TC – M.Vanden Eynden.
Review of the processes released in the framework of the MMP Goran Perinić.
Report on database work for INB in ALICE Latchezar Betev (ALICE) Information Session INB – June 8, 2006.
– Machine Controls Coordinators (MCC): team and role – Overview of renovations during LS1 – Proposal for after-LS1 Commissioning organization ACCOR PROJECT.
Proposal: Use of ECRs for “Controls” Changes and Renovations Rende Steerenberg, Samy Chemli, Marine Gourber-Pace, Klaus Hanke, Verena Kain, Bettina Mikulec,
Report on Controls, TCC meeting 23 th June 2005 – Cl.Dehavay & Co - AB/CO/HT 1 Claude DEHAVAY - CERN/AB/CO/HT Installation Readiness Report - Controls.
Marine Pace Technical Committee -12 Dec DRY RUNS COMMISSIONING & EARLY BEAM OPERATION STABLE OPERATION.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)
1 Software Testing and Quality Assurance Motivation and Review of Software Verification & Validation (2)
LS1 Review BE-CO-SRC Section Contributions from: A.Radeva, J.C Bau, J.Betz, S.Deghaye, A.Dworak, F.Hoguin, S.Jensen, I.Koszar, J.Lauener, F.Locci, W.Sliwinski,
ADO-PO / TC meeting 1st December 2016
V4.
ITIL: Service Transition
DESY / XFEL – Tunnel layout, transport and handling solutions
Right of Way Data Management System (RWDMS)
Accelerator Controls Renovation Project “ACCOR”
CONS and HL-LHC day Analysis of needs from BE-CO
Vacuum Controls Quality Management
Performance monitoring framework for the technical infrastructure
Duval County Public Schools Education Information Network Project
P. Charrue on behalf of AB/CO/IN
Injector De-cabling Project
ICT Update October 2016.
Siemens PLCs support at CERN
Georgia Gkioka TE-VSC-ICM National Technical University of Athens
Me, FESA classes, Testing
IEEE Std 1074: Standard for Software Lifecycle
Project planning Unit 3 Employability and Professional Development
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
News from QAC and Central Services
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
Software Developer for Vacuum Control System (BE3528)
GIS Portal Racks Project
“Would I have to do this all by myself …….?”
Insert Product Photograph Here
ABCD ICT Services and Projects a ABC
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Business Services Goals and Objectives for /20/2019.
The IT Services Helpdesk
AKSUM UNIVERSITY ICT Directorate Oct 10, 2018 Axum, Tigray, Ethiopia
Rack and Interconnect Design in E-plan
Implementing VCAT’s Digital Strategy
Presentation transcript:

CERN/BE/CO – Claude Dehavay - Sept.2016 (with input from Z.Zaharieva and M.Vanden Eynden) 1

BE-CO Asset management - Cl.Dehavay 1st BE Asset Management meeting – 13 Sept.2016  BE-CO : ◦ Asset Manager: Cl.Dehavay (was S.Catin until March 2016) ◦ Scope : Accelerator Computing Infrastructure ◦ Tangible Asset : 30 MCHF ◦ Main users: BE-CO-IN (15 Staff + FSU Team) ◦ BE AM Forum members: Cl. Dehavay, M. Vanden Eynden (alternate member)  Types of assets: Front-Ends, Back-Ends, Desktop computers ◦ Track by Part:  Cables  Mechanical parts ◦ Track by Asset  Electronic modules  Crates (VME, PICMG 1.3) => Funct.Positions (11714 records)  Near future: include Data center backends (servers, storage) & consoles 2 StatusRecordsComments Installé16774 Inventory planned during EYETS,.. En magasin6100 Inventory in Dec 2015: 5% of error En fabrication6563 Inventory is on going Accepté855 Inventory is on going En attente de reparation643 From ACCOR; Dismantled Hors service définitif502 Stocké24 Total31461

BE-CO Asset management - Cl.Dehavay 1st BE Asset Management meeting – 13 Sept.2016  Tools ◦ Accelerator Naming Convention – CO equipment codes ◦ EDMS: documents for production and HW installation (from LS1 onwards) ◦ LAYOUT: Assemblies ◦ InforEAM: Asset Maintenance Management ◦ EAM – BE/CO: Specific CO Portal designed by S. Catin ◦ In Progress:  Geolocalization with GIS Portal (+ direct access to operational documentation)  Automatic generation of operational Fieldbus networks from Layout DB (MIL-1553, WorldFIP, WR)  Expectations from the Forum ◦ Share experience (BE-CO started in 2010 – ACCOR Q&A plan) ◦ Focus on « real » use cases and identify shortcomings ◦ Avoid specific developments ◦ Foster efforts towards common and simple solutions for the users ◦ Share resources 3

BE-CO Asset management - Cl.Dehavay 1st BE Asset Management meeting – 13 Sept

BE-CO Asset management - Cl.Dehavay 1st BE Asset Management meeting – 13 Sept