EPM: Managing Virtual Projects Summer 2004 Marcus Goncalves By MGCG, Inc. to PMI Maine Chapter.

Slides:



Advertisements
Similar presentations
Twelve Cs for Team Building
Advertisements

Chapter 8: Foundations of Group Behavior
 DB&A, Knowledge Management Within and Across Projects June 15, 2012 INNOVATION for a better world.
Lecture 2b: Software Project Management CSCI102 - Introduction to Information Technology B ITCS905 - Fundamentals of Information Technology.
Managing International Information Systems
McGraw-Hill/Irwin © 2005 The McGraw-Hill Companies, Inc. All rights reserved Chapter The Future of Training and Development.
Oversight CHAPTER SIXTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Oversight CHAPTER SIXTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Basic Challenges of Organizational Design
Agile Project Management By: Jim Highsmith Presented by: Brian Faulk.
Chapter 2 Manageable Trends. Six Trends  IT influences different industries, and the firms within them, in different ways  Telecommunications, computing,
1 There are a number of organization designs, including many combinations or hybrids of models. Seven designs are shown below: Process Centered Front End.
Best Practices: Aligning Process, Culture and Tools Michael Jordan Senior Project Manager - Microsoft Consulting Services
Certificate IV in Project Management Introduction to Project Management Course Number Qualification Code BSB41507.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Basic Challenges of Organizational Design 4-1.
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
1 Enterprise and Global Management of Information Technology.
Organizational Change Richard Moscatiello, MBA, PMPApril 16, 2010.
1 Project Management Introduction. 2 Chap 1 What is the impact? 1994: 16% of IT projects completed “On-Time” 2004 : 29% of IT projects “On- Time” 53%
Thoughts Before Requirements Gathering. Requirements Gathering Functional Requirements – Functional requirements explain what has to be done by identifying.
Project Management 6e..
Lecture 4 – XP and Agile 17/9/15. Plan-driven and agile development Plan-driven development A plan-driven approach to software engineering is based around.
Building Systems for Today’s Dynamic Networked Environments A Methodology for Building Sustainable Enterprises in Dynamic Environments through knowledge.
1 Chapter 9 Implementing Six Sigma. Top 8 Reasons for Six Sigma Project Failure 8. The training was not practical. 7. The project was too small for DMAIC.
Virtual Teams Defined ETM5361/MSIS5600 Managing Virtual Project Teams
Today’s managers & leaders are challenged unlike any of the past generations in their roles.
MANAGEMENT RICHARD L. DAFT.
MANAGEMENT RICHARD L. DAFT.
MANAGEMENT RICHARD L. DAFT.
Where We Are Now. Where We Are Now Project Oversight Project Oversight Oversight’s Purposes: A set of principles and processes to guide and improve.
MANAGEMENT RICHARD L. DAFT.
Unleash the potential of your organization through the power of collective intelligence and collaboration. Building Intelligent, Inspired, Empowered Organizations.
Empowernomics™ Business Transformation with Outstanding Economic Impact Building Intelligent, Inspired, Empower Organizastions e-Ecosystems, INC
Fundamentals of Information Systems, Sixth Edition
‘There is somebody wiser than any of us, and that is everybody.’
Chapter 1 The Systems Development Environment
SAMPLE Develop a Comprehensive Competency Framework
Identify the Risk of Not Doing BA
Presentation By: Rick Hutchins Date: Feb 3 and 4, 2011.
Information Technology Project Management – Fifth Edition
Chapter 2: The Project Management and Information Technology Context
Information Technology Project Management – Fifth Edition
Project Management 6e..
The Project in the Organizational Structure
Chapter 1 The Systems Development Environment
Overview – Guide to Developing Safety Improvement Plan
Human Resource Champions: The Next Agenda for Adding Value and Delivering Results Presented by Ivan Chang.
Critical Factors in Managing Technology
Managing Information Technology
Enabling Collaboration with IT
MEP CoordinationMEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why.
Overview – Guide to Developing Safety Improvement Plan
Development of the Team
Chapter Objectives To understand the operational environment in which you execute your project To understand the need and role of oversight in managing.
Where We Are Now. Where We Are Now Project Oversight Project Oversight Oversight’s Purposes: A set of principles and processes to guide and improve.
The Environment and Corporate Culture
PowerPoint Presentation by Charlie Cook
By Jeff Burklo, Director
PM in Your Pocket Lessons, practices, and tools for conquering project management! M. Nowosadzki PMP CSM – 2018 PM in Your Pocket - Marcelina Nowosadzki.
Using Virtual Teams for Project Management Success
Managing International Information Systems
What is a Project? Project Defined Major Characteristics of a Project
CHAPTER 11 Organizational Structure and Controls
Organizational Design and Structure
The Project in the Organizational Structure
Project Management 6e..
Chapter 2: The Project Management and Information Technology Context
SEIU Local 1000: Improving Results through Better Project Management
Project Management 6e..
Value Proposition Celemi Sales Endeavour™ enables sales professionals, and their organizations, to learn and apply a repeatable process for developing.
Presentation transcript:

ePM: Managing Virtual Projects Summer 2004 Marcus Goncalves By MGCG, Inc. to PMI Maine Chapter

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 2 Marcus Goncalves  MS in CIS, BS in Civil Engineering, BA in Psychology and BA in Business Administration  Adjunct Professor at Boston University on Knowledge, Project, and Operations Management  12+ years of global consulting in IS&T and PM  Founder of 6 companies, CEO, CKO, COO, CTO  Author of 28+ books  Member of PMI, OASIS/UN, UDDI, W3C standardization committees  Holder of 6 patents (pending) in virtual access technologies  Carnegie and Rockefeller Foundation - Who’s Who in the U.S. Executives and Computer Industry.

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 3 About MGCG  Who we are  Consulting Practice  Knowledge Management  Project Management  Risk Management  Change Management  PM, RM and CH Courses  Workshops & Seminars  Short Courses, 2-4 days  Online programs KM PM RM CM Plan Control Optimize

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 4 Agenda  Overview of e-Project Management  Differentiation of conventional PM from ePM  Highlights of criticality, challenges and complexities  Emerging tools  Critical Success Factors

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 5 The Age of ePM

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 6 Capability Maturity Model Integration (CMMI)

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 7 CMMI’s Impact on Projects

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 8 Successful ePM = Technical and Sociocultural Integration

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 9 An Overview of ePM  Methodology for managing projects from a distance, over the Internet and telecommunication medium  An evolutionary approach to Project Management  Used to address issues with conventional approach  NOT for everyone or everything!!

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 10 Why e-Project Management ?  Main Factors  Globalization & Rapid Development of Third World & Closed Economies  Downsizing/Rightsizing & Increasing Outsource trend  Telecommuting  Global Competition  Partnerships and Alliances  Ability to hire the best for only what you need  Businesses opportunities, etc.  Other Important Factors  Conservative E-Commerce Project facts: (Source  50% of new software projects are web-based  20% of them are critical  31% of IT budget spent of Web Projects  95% should be done “within a year”

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 11 Conventional PM  Made of “seven” phases..Requirements, Design, Operations  Build for known functionality..There is time for “ready”  Process focus is more on optimization than adaptation  Change is more of an exception than the norm  Predictable future (lifetime)  Matured technologies

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 12 Virtual Project Management  Web based PM  No time for “ready”..always on “fire..”  Projects are “research- like” but “mission-critical”  Not sure of life-time  Risk-driven  Breakthrough and evolving technologies  Need for integrating speed, change, radical innovation

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 13 What About Virtual Teams?  Virtual Team is not a new concept  DoD  NASA  Differ from traditional teams  Dispersed, not co-located  Characterized by multiple environments, culture, language, technology, politics, economy, etc.  Distributed, not centralized operations, organization and IS&T  Types of virtual teams  Local  International  Interactive  Collaborative  Driving forces behind the rise of virtual teams  Current trends

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 14 Typical ePM Environment

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 15 ePM & VT Framework

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 16 Current Applicability of ePM

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 17 Dimensions of a Virtual Team  Stability of membership - Stable, Fluid  Clarity of team boundaries - Unclear, Clear  Timeframe in which to operate - Immediate, Long-Term  Regularity of activity - Regular, Infrequent

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 18 ePM Tasks  Type or nature of task - Routine, Non-routine  Decision making authority - None, Full  Complexity  Organizational - Single, Multiple  Cultural - Single, Multiple  Temporal - Single Time Zone, Multiple

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 19 Two Virtual Team Examples Project or Product TeamAction Team Stability of Membership FluidStable/Fluid Team BoundariesClearUnclear TimeframeLonger-termImmediate RegularityFrequentInfrequent TaskNon-routine Decision AuthorityHighModerate ComplexityHighModerate

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 20 Four Levels of Collaboration Level 1 Cumulative Work : Uncoordinated Individual Efforts Level 3 Coordinated Work: Coordinated Individual Efforts Level 4 Collaborative Work: Concerted Team Effort Sprinters Relay Crew High Low Degree of CollaborativeEffort Huddle Level 2 Communication Work: Unstructured Information Sharing

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 21 Virtual Teams Management Systems Project Problem Task Collaborative decisions and actions Virtual Team Leader, Members Technology Structure Process Facilitation (Based on Kurstedt’s Management System Model) Ideas Information Performance Progress Idea organization, prioritization, consensus, contribution and progress

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 22 Emerging Technologies  Microsoft Project EPM  Primavera’s Web Portal  Extreme Programming - Kent Beck  Projectplace.com  The concept of “Intellectual Bandwidth” (the ability to bring IC to bear in addressing a problem). KM, RM and CM is key!

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 23 Microsoft Project EPM

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 24 Microsoft EPM Cont.

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 25 Projectplace.com

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 26 Projectplace.com Cont.

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 27 Project Initiation Phase  Starts with a project initiation workshop (Webex)  Deliverable is the project data sheet  Answers Why? What? Who? And When? questions  Key component is the project objective statement (POS)  Specifies scope, schedule and resources in 25 words or less

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 28 Ideal Virtual Team KM PM  Two to hundreds of people  Complex issues addressed  Everyone  Contributes equally  Perceives everything from multiple perspectives  Focuses attention on critical Issues  Takes ownership of the solution

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 29 Our Methodology  Have adaptive life cycle planning  Balance anticipation with adaptation  Encourage rework for change - not due to poor design/process  Focus on business exchanges first..  Implement features gradually..breadth first depth later..  Replace control with collaboration and empowerment  Team focus on skill and understanding rather than process  Be lightweight - Simple and clear in purpose and principles

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 30 Critical Success Factors  Highly skilled and focused teams  Project champion support  Risk-taking organizational environment  Cultural shift in Business and Systems Processes  Manager orientation - From “Best Practices” to “Next Big Thing”

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 31 Our Principle “ Simple, clear purpose and principles give rise to complex, intelligent behavior. Complex rules and regulations give rise to simple, dumb behavior.”

© MGCG, Inc. All rights reserved. Boston – Germany – Turkey – Brazil - Argentina 32