Mrs. Chathuri Senarath. Control technique that reports variances by comparing actual costs to pre-set standards so facilitating action through management.

Slides:



Advertisements
Similar presentations
Cost Accounting Horngreen, Datar, Foster Inventory Costing and Capacity Analysis Session 9.
Advertisements

Problem – 10 (Profit Variance)(Factors contributing to change in profit) During , average prices increased over these of the previous year: i.20%
Inventory Costing and Capacity Analysis
Standard Costing and Variance Analysis
7 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Flexible Budgets, Variances, and Management Control: I Chapter.
Copyright © 2007 Prentice-Hall. All rights reserved 1 Flexible Budgets and Standard Costs Chapter 23.
Contemporary Engineering Economics, 4 th edition, © 2007 Estimating Profit from Production Lecture No. 31 Chapter 8 Contemporary Engineering Economics.
 Standard cost is the pre determined cost which determines in advance what each product or service should cost under given circumstances.
Standard costing.
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University MANAGERIAL ACCOUNTING 10 TH EDITION.
Standard Costing and Variance Analysis
VARIANCE ANALYSIS 1 LECTURE 8.
Copyright © 2003 Pearson Education Canada Inc. Slide 7-76 Chapter 7 Flexible Budgets, Variances and Management Control: I.
Budgets and Variances continued: Production variances.
Standard Costs and Balanced Scorecard
The Master Budget and Flexible Budgeting
8 - 1 StandardStandard/Budget AdvantageAdvantage of Standard Costs StandardStandard Setting Direct Materials- Direct Labor Var Manufacturing Manufacturing.
Copyright © 2003 Pearson Education Canada Inc. Slide 7-97 Chapter 9 Income Effects of Alternative Inventory Costing Models.
Budgeting and Standard Cost Systems Chapter 13. Budgeting A budget is a financial and quantitative plan for the acquisition and use of resources Use for.
Absorption & Marginal Costing
Use with Management and Cost Accounting 8e by Colin Drury ISBN © 2012 Colin Drury Part Four: Information for planning, control and performance.
1 The budgeting process The traditional goals of the planning and control process are: - to identify the economic goals and how to achieve them - to measure.
Chapter 17 – Additional Topics in Variance Analysis
Chapter 10 The Use of Budgets for Cost Control and Performance Evaluation.
AFM Standard Costing & Variance Analysis Isuru Nadeesha Manawadu
Standard Costs Budget for a single unit
Standard Costing & Variance Analysis!
Chapter 23 Flexible Budgets and Standard Cost Systems
Cost Volume Profit Analysis (CVP)
Budgetary Planning and Control
: Mrs. Kamlesh.  Standard cost is: A predetermined cost. Used for cost-control. And the technique is known as standard costing.
Variances Short summary. Static Budgets A static budget ( master budget) is prepared for only one level of a given type of activity. All actual results.
Flexible Budgets and Standard Costs Chapter 23 HORNGREN ♦ HARRISON ♦ BAMBER ♦ BEST ♦ FRASER ♦ WILLETT.
Flexible Budgeting Chapter 07, 08
1 Brenda Mallouk Standard Costing I Management Accounting One.
COST MANAGEMENT Accounting & Control Hansen▪Mowen▪Guan COPYRIGHT © 2009 South-Western Publishing, a division of Cengage Learning. Cengage Learning and.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Estimating Profit from Production.
Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting:
Standard Costs and Operating Performance Measures.
12-1 Introduction to Product Costing Prepared by Douglas Cloud Pepperdine University Prepared by Douglas Cloud Pepperdine University 12.
Part 1 Study Unit 7 Review Jim Clemons, CMA.
F5 Performance Management. 2 Section D: Standard Costing And Variance Analysis Designed to give you knowledge and application of: D1. Budgeting and standard.
Chapter 23 Flexible Budgets and Standard Cost Systems.
Strategic Variance Analysis Ms. Chathuri Senarath University of Kelaniya.
F2:Management Accounting. Designed to give you knowledge and application of: Section E: Budgeting & standard costing E2. Functional budgets E4. Basic.
25-1 Both standards and budgets are predetermined costs, and both contribute to management planning and control. There is a difference:  A standard is.
Amity School of Business Variance Analysis Module VI.
Variance analysis 1 、 Basic variances 2 、 The reasons for variances 3 、 Operating statements 4 、 Investing variances 5 、 Materials mix and yield variances.
Cost accounting Overheads.
Prepared by Debby Bloom-Hill CMA, CFM
Cost Analysis for Management Decision Making
Cost Analysis for Management Decision Making
Implement expense-control strategies
Standard costing.
Operating Budgets: Manufacturing Budgets
Production Cost Variance Analysis
8 Chapter Variance analysis.
COST ANALYSIS FOR CONTROL
Cost Accounting and Reporting Systems
Chapter 8 Accounting for overhead
Absorption and marginal costing
MANAGEMENT AND COST ACCOUNTING
Marginal costing and short term decision making
Cost accounting Overheads.
Standard Cost Accounting Materials, Labor, and Factory Overhead
Standard Costing and Variance Analysis
Cost accounting Session 7.
The Master Budget and Flexible Budgeting
AMIS 3300 Chapter 9.
ENGINEERING ECONOMICS
Presentation transcript:

Mrs. Chathuri Senarath

Control technique that reports variances by comparing actual costs to pre-set standards so facilitating action through management by exception.

 The greatest benefit from its use can be gained if there is a degree of repetition in the production process.  It is therefore most suited to mass production and repetitive assembly work.

1. Developing standards 2. Compares standards with actual (variance) 3. Generate information (variance analysis) 4. Stimulate improved performance

 What is a standard ?  The difference between a standard and a budget ?  How to set the standards ? Manufacturing Vs Service  Standards, is it suitable for modern organizations ?

A predetermined unit cost  Pre-determine  Estimate  For future period  Per unit

Standard cost card Product: A CostRequirementRs Direct Materials XRs 2.00 per kg6 kgs12.00 YRs 3.00 per kg2kgs6.00 ZRs 4.00 per liter1 lit4.00 Others Direct labour Grade IRs 4.00 per hour3 hrs12.00 Grade IIRs 5.40 per hour5 hrs Variable production overheadsRs 1.00 per hour8 hrs8.00 Fixed production overheadsRs 3.00 per hour8 hrs24.00 Standard full cost of production95.00

A budget usually refers to a department's or a company's projected revenues, costs, or expenses.budgetrevenuesexpenses A standard usually refers to a projected amount per unit of product, per unit of input (such as direct materials, factory overhead), or per unit of output. For example, a manufacturer will have budgets for its manufacturing or factory overhead departments. Let's assume that the budgeted manufacturing overhead for the upcoming year is expected to be $1,000,000 in order to produce the expected 100,000 identical units of product. The standard cost of manufacturing overhead per unit of product is $10 ($1,000,000 divided by 100,000 units)manufacturing overhead

 Depends on the type of organization

 Normal items looked at are;  Material  Labour  O/H  Sales & we look at price/rate or volume/qty

 Past prices or rates (past trends)  Estimates received from material or labour suppliers  Level of quality planned (specifications: High or low quality material, high or low skilled workers).  Agreements or possible agreements with trade unions  National legislations (Ex: minimum wage rate acts, price controls)  Types of overheads and the current methods used.  Specific external factors [Competitors, Customers (level of demand, price elasticity), Suppliers]  General external factors [Political / Economical (inflation and interest rates) / Social and Legal / Technical]

 Past performance  Competitor performance  Planned Performance  Level of performance gives:  Ideal standard  Attainable standard  Current standard  Basic standard

Few issues  Difficult to establish a measurable cost unit  Every cost unit will be different / heterogeneous  High levels of human involvement

 McDonaldization  Diagnostic Reference Grouping Exceptional cases

Stable Vs Dynamic environment Cost control or Cost management Labour centric or Realistic Aggregate Vs Individualistic Standards and Behavioral implications

Standard items Actual items

Per Unit Materials 1· Labour 1· Variable 1· Fixed 1·6 hrs Total cost Selling price 40·00  Budget Production= 5000 units  Budget Sales = 5000 units Materials 10,300 kgs 38,720 Labour 11,420 hours 71,200 Overhead: Variable 29,650 Fixed 83,800 Sales revenue164,800  Actual production = 6000  Actual sales = 4300 Standard Info. Actual Info. Important points to remember : Are we looking at per unit or a total comparison… At what activity level… We can break it down to…

 Direct Material variance  Direct Labour variance  Variable O/H variance  Fixed O/H variance  Sales variance

Total Direct Material Variances Usage VariancePrice Variance

Std material x Actual no of -Actual Cost per unit units produced cost incurred

Std material Cost Per Kg Actual Material cost per Kg Actual material purchased or used* Std material x Actual units – Actual Raw Std raw material usage per units produced material used cost per Kg Material Usage variance

 Material price variance 4 – 38720/10300 X = 2480Fav  Material usage variance 1.5X6000 – x 4 = 5200Adv

Total Direct Labour Variances Efficiency VarianceRate VarianceIdle time Variance

Std labour x Actual No units - Actual labour Cost per unit produced cost incurred

Std labour – Actual labour Actual hours worked rate Per hour rate per hour Labour efficiency Variance Std labour x Actual units – Actual hours Std labour hrs per unit produced actively worked rate per hr. Labour : Idle time Variance Idle hrs X Std labour rate per hour

 Labour rate variance /11420 X = 14100Adv  Labour efficiency variance 1.6 X 6000 – 9150 X 5 = 2250Fav  Idle time variance 2270 X 5 = Adv

Total Variable O/H cost Variances Efficiency Variance Expenditure Variance

Std variable O/H x Actual units - Actual variable O/H Cost per unit produced cost incurred

Std variable O/H - Actual variable O/H Actual active expenditure per expenditure per hrs worked hr active hrs * Variable O/H efficiency Variances Std hrs per x no of units - Actual active Std variable O/H Unit produced hrs per hour

 Variable O/H expenditure variance /9150 X 9150 = 6775 Adv  Variable O/H efficiency variance 1.6 X 6000 – 9150 X 2.5 = 1125Fav

Fixed Overhead

 Fixed O/H is different to other items ?  If the Fixed O/H is calculated in per unit terms…  We already have the name …

Fixed O/H x Actual activity - Actual fixed O/H Absorption level cost incurred rate per unit

Total Fixed O/H cost Variances Volume Variance Expenditure Variance

Bug. Fixed O/H cost - Actual fixed O/H cost Bud units – Actual units fixed O/H absorption rate per unit Fixed O/H volume variance

 Fixed O/H expenditure variance 12X = 23,800 Adv  Fixed O/H volume variance 5000 – 6000 X 12 = 12,000Fav

Sales Variances Volume VariancePrice Variance

Std selling price - Actual price Actual no of units sold per unit per unit (Budgeted sales units - Actual sales units) Std profit per unit (Budgeted sales units – Actual sales units) Std contribution per unit Sales Volume variance (Budgeted sales units - Actual sales units) Std revenue per unit

 Sales price variance ( /4300) 4300 = 7200 Adv  Sales volume variance * (5000 – 4300) X 10 = 7,000 Adv * (5000 – 4300) X 22 = 15,400 Adv * (5000 – 4300) X 40 = 28,000 Adv

Operating Statement Budgeted profit xxxx Sales volume variance xxx/(xxx) Standard profit xxxx Sales price variance xxx/(xxx) Cost Variances Adverse Favorable Material - price usage Labour - rate efficiency idle Variable O/H - expenditure efficiency Fixed O/H - expenditure volume xxx/(xxx) Actual profit xxxx

 Profit statement (Absorption costing)  Profit statement (Marginal costing)  Contribution statement  Cost statement

Profit statement (Absorption costing) Budgeted profit xxxx Sales volume variance xxx/(xxx) Sales price variance xxx/(xxx) Cost Variances Adverse Favorable Material - price usage Labour - rate efficiency idle Variable O/H - expenditure efficiency Fixed O/H - expenditure volume xxx/(xxx) Actual profit xxxx

Sales 200,000 Less Cost of sales Op. Stock - Production 150,000 -Cl. Stock - (150,000) Gross profit 50,000 Adj. Under or Over Absorbed Less- Non production cost Net profit 50,000

Sales 164,800 Less Cost of sales Op. Stock Production 223,370 -Cl. Stock (1700X30) (172,370) Gross profit (7,570) Adj. Under or Over Absorbed Less- Non production cost Net profit (7,570)

c. Operating Statement Budgeted profit 50,000 Sales volume variance (7000) Standard profit 43,000 Sales price variance (7200) Cost Variances Adverse Favorable Material - price 2480 usage 5200 Labour - rate efficiency 2250 idle Variable O/H - expenditure 6775 efficiency 1125 Fixed O/H - expenditure volume (43370) Actual profit (7570)