Scheduling CTC-470.
CSSE Sep.2008 Constructing and Analyzing the Project Network Diagram Chapter 6.
Developing a Project Plan
CSSE 372 Week 6 Day 2 Constructing and Analyzing the Project Network Diagram  PERT Chart PERT was invented for the Nautilus submarine project. Ok, maybe.
PREPARED BY : NOR AZAH BINTI AZIZ KOLEJ MATRIKULASI TEKNIKAL KEDAH PROJECT NETWORK DIAGRAM.
Management & Development of Complex Projects Course Code - 706
5/4/20151 NETWORK SCHEDULING TECHNIQUES. 5/4/20152 Network Diagrams  PMI defines the scheduling process as: “the identification of the project objectives.
Microsoft Project.
Dr. Neal CIS 480 MS Project Concepts Dr. Greg Neal CIS 480 Systems Analysis and Design.
Scheduling. Putting the activities in chronological order –Chicken or the egg Allows the PM to determine the time required to complete a project.
Project Scheduling: Networks, Duration Estimation, and Critical Path
Project Management (2) Chapter 16, Part 2. EJR 2006 Review of Project Management, Part 1 What is a project? Examples of projects Project performance expectations.
Scheduling CTC-415. Activity Network Development Network Models Activity on Node Precedence Diagram Method Activity on Arrow Network Characteristics Discrete.
ERT461 BIOSYSTEMS ENGINEERING DESIGN 1 ERT424 BIOPROCESS PLANT DESIGN 1.
The Critical Path – Precedence diagram method Luise Lorenz Christina Mohr.
Time Planning and Con trol Precedence Diagram.  Precedence Diagramming  An important extension to the original activity-on-node concept appeared around.
Network Scheduling : Precedence Diagram Method
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT NETWORK AND BLOCK DIAGRAMS.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
1 Microsoft Project 2010 Demo Part 1. 2 Project: Initial Screen To start click Project/Project Information. Add start date.
PMP, CAPM, PgMP, PMI-SP, PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services.
Scheduling CTC-415. Short Interval Scheduling Plan & manage day to day activities Focus on individual activities Goal Oriented to get activity done Two.
Project Management Chapter 16. MGMT 326 Foundations of Operations Introduction Strategy Managing Projects Quality Assurance Facilities Products & Processes.
Project Management Part 5 Project Scheduling. Topic Outline: Project Scheduling Identifying relationships among activities Project network diagrams Identifying.
Reference: Figure 6.2. PMBOK® Guide, 5 h Ed Reference: Figure 6.2. PMBOK® Guide, 5 h Ed.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
KULIAH 10 Magister Sistem Informasi Universitas Komputer Indonesia.
BU630-4 Project and Operations Management
Project Management MGT 30725
Time Planning and Control Time-Scaled Network
Project Management -- Developing the Project Plan
Project Management: PERT/CPM
Project Scheduling KULIAH 10 Magister Sistem Informasi
The Project Schedule and Budget
& Urban Planning Civil Engineering Department
Project Scheduling KULIAH 10 Magister Manajemen
Project scheduling Precedence diagram method Project Management
The Project Schedule and Budget
Project scheduling Precedence diagram method & Resource scheduling
Project scheduling Precedence diagram method Project Management
Project Scheduling Chapter 14.
Based on the PMBOK® Guide 3rd Edition
A tutorial on MS Project
Introduction to Networking Technique
CHAPTER 6 PROJECT TIME MANAGEMENT
Developing a Project Plan
PROJECT TIME MANAGEMENT
Project Scheduling: networks, duration estimation, and critical path
Time Planning and Control Precedence Diagram
Time Planning and Control Time-Scaled Network
Project Time Management
PERT - The Program Evaluation and Review Technique
1 Total Slack A 3d Task Early Start Late Start Early Finish
Project Scheduling: Lagging, Crashing and Activity Networks
Project Time Management
Microsoft Project 2007 Demo Part 1
LECTURE 2.
Lecture 5: Project Time Planning (Precedence Diagramming Technique)
Lecture 7 PROJECT SCHEDULING Ferdinand Fassa.
Project Time Management
Project Time Management
Exercise – A small building.
Project Time Management
Project Time Management
Time Planning and Control Precedence Diagram
CHAPTER 6 PROJECT TIME MANAGEMENT
Project Scheduling KULIAH 10 Magister Sistem Informasi
Presentation transcript:

Project Management Magister Desain Universitas Komputer Indonesia

PRECEDENCE DIAGRAM METHOD The Precedence Diagram Method is a tool for scheduling activities in a project plan. It is a method of constructing a project schedule network diagram that uses boxes, referred to as nodes, to represent activities and connects them with arrows that show the dependencies.schedulingproject plan Critical Tasks, noncritical tasks, and slack time Shows the relationship of the tasks to each other Allows for what-if, worst-case, best-case and most likely scenario Key elements include determining predecessors and defining attributes such as early start date late start date early finish date late finish date Duration WBS reference

PRECEDENCE DIAGRAM METHOD Extension of AON Network Allows concurrent activities to overlap Schedule logic is easier and quicker to develop Easier to modify Better represents work flow in continuous operations

Types of Task Relationship FS – Finish to Start Start Finish SS – Start to Start FF – Finish to Finish Start Finish Start Finish SF – Start to Finish Start Finish

Leads & Lags Activity Lead – Lag Lag = time that a following activity is delayed from the start of the previous activity Lead = time that an activity precedes the start or finish of the next activity

Leads & Lags Lead and Lag are used to Modify Relationships Lead and Lag Can be used with any Relationship Type (FS, FF, SS) Normal Finish - Start Finish – Start Modified by a Lead Finish – Start Modified by a Lag

EXAMPLE for EMR Project NoActivitiesDurationPredecessor 1Electronic Medical Reference Project 2 Architectural Decision5 days 3 Specification 4 Internal Specification12 days2 5 External Specification7 days2 6 Feature Specification10 days2 7 Design Phase 8 Voice Recognition10 days4SS+7 and 5 9 Case4 days4 and 5FS+1 10 Screen2 days4,5 11 Database25 days6 12 Microphone-soundcard5 days6 and 11FF-4 13 Digital Devices7 days6 14 Computer I/O5 days6 15 Review Design5 days8,9,10,11,12,13,14