CERN restrict meeting, November 26 th 2013 Luca Stanco for the NESSiE Collaboration (Neutrino Experiment with SpectrometerS in Europe) Currently the following.

Slides:



Advertisements
Similar presentations
Simona Bettoni and Remo Maccaferri, CERN Wiggler modeling Double-helix like option.
Advertisements

MINOS+ Starts April 2013 for three years April
CERN First Considerations to implement nuSTORM on the CERN site “North Area Neutrino Hub” E.Wildner, CERN Wednesday, March 27, 2013Elena Wildner,
Accelerator based Neutrino program around the world 1. Europe: Neutrino platform at CERN ESS second maximum? 2. Japan: T2K and HyperK status 3. USA: LBNF.
1 by Giovanni Marsella, Università del Salento and INFN (for the NESSiE collaboration) NeSSiE and the quest for sterile neutrinos Neutrino Oscillation.
MINERvA Overview MINERvA is studying neutrino interactions in unprecedented detail on a variety of different nuclei Low Energy (LE) Beam Goals: – Study.
Near Detector Working Group for ISS Neutrino Factory Scoping Study Meeting 24 January 2006 Paul Soler University of Glasgow/RAL.
ISS-4 22 August IRVINE Alain Blondel NEUtrino DETectors N-EU-DET 4-years working plan for Neutrino Detector R&D to take place in ~ objectives.
Alain Blondel CHIPP Neutrino meeting NEUCHATEL June 2004.
Neutrino physics: experiments and infrastructure Anselmo Cervera Villanueva Université de Genève Orsay, 31/01/06.
How to Build a Neutrino Oscillations Detector - Why MINOS is like it is! Alfons Weber March 2005.
An accelerator beam of muon neutrinos is manufactured at the Fermi Laboratory in Illinois, USA. The neutrino beam spectrum is sampled by two detectors:
Alain Blondel MICE: Constraints on the solenoids 2.Field Homogeneity: or ? this will be dictated by the detector requirements. TPG will be.
Detector  Basically the NOvA detector. Planes of plastic tubes filled with liquid scintillator. Fully active: Good for electron identification Total mass:
Status of the OPERA experiment Yoshiaki Nonoyama Nagoya Univ.
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
T2K experiment at J-PARC Epiphany 2010D. Kiełczewska1 For T2K Collaboration Danuta Kiełczewska Warsaw University & Sołtan Institute for Nuclear Studies.
CBM Superconducting Dipole Magnet
Fermilab Neutrino Beamline to DUSEL Mike Martens Fermilab PAC November 3, 2009.
Caren Hagner CSTS Saclay Present And Near Future of θ 13 & CPV in Neutrino Experiments Caren Hagner Universität Hamburg Neutrino Mixing and.
27 April ’12 MINER A meeting Alessandro Bravar Université de Genève UniGE Miner a Application Motivation UniGE neutrino group MINER UniGE NA61 / SHI.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
Long Baseline Experiments at Fermilab Maury Goodman.
Preliminary Results from the MINER A Experiment Deborah Harris Fermilab on behalf of the MINERvA Collaboration.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
Θ 13 and CP-Violation in the Lepton Sector SEESAW25 Institut Henri Poincaré, Paris Caren Hagner Universität Hamburg SEESAW25 Institut Henri Poincaré, Paris.
Medium baseline neutrino oscillation searches Andrew Bazarko, Princeton University Les Houches, 20 June 2001 LSND: MeVdecay at rest MeVdecay in flight.
Harvard Neutrino Group DoE Review August 21, 2006.
Accelerator-based Long-Baseline Neutrino Oscillation Experiments Kam-Biu Luk University of California, Berkeley and Lawrence Berkeley National Laboratory.
T2K Status Report. The Accelerator Complex a Beamline Performance 3 First T2K run completed January to June x protons accumulated.
BENE MECC detector Pasquale Migliozzi INFN – Napoli.
STATUS AND PLANS OF ICARUS-NESSIE (part 2 : plans) Carlo Rubbia GSSI, L’Aquila, Italy SPS-C meeting June 25 th, 2013.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
2008 European School of High-Energy Physics - Trest, Czech Republic - 19 August - 1st September Target Tracker Data Analysis In OPERA Experiment S. Dmitrievsky,
The Sterile Neutrino Issue with SPS beam at CERN IFAE April 5, 2013 Eduardo Medinaceli (INFN and Padova University) for the NESSiE collaboration.
CERN Neutrino platform 24 th July, 2014 S. Bertolucci CERN.
Tagger and Vacuum Chamber Design Jim Kellie Glasgow University.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
ICARUS-LBNE project A. Guglielmi 1.LBNE-ICARUS Padova meeting 2.SPS-C C. Rubbia presentation.
MINERνA Overview  MINERνA is studying neutrino interactions in unprecedented detail on a variety of different nuclei  Low Energy (LE) Beam Goals: t Study.
Measuring Nuclear Effects with MINERnA APS April Meeting 2011 G. Arturo Fiorentini Centro Brasileiro de Pesquisas Físicas On behalf of the MINERnA collaboration.
/18 N eutrino E xperiment with S pectrometer S i n E urope Search for sterile neutrinos at CERN G. Sirri INFN Bologna on behalf of the NESSiE Collaboration.
Marcos DRACOS IPHC-IN2P3/CNRS Université de Strasbourg
The CERN Near Detector(s) initiative
Roberto Calabrese Ferrara University and INFN
The MiniBooNE Little Muon Counter Detector
Some Design Considerations and R &D of CEPCB Dipole Magnet
Detector building Notes of our discussion
Neutrino Projects
NESSiE and Muon Detection in magnetized Detectors
Neutrino factory near detector simulation
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
Accelerator R&D for Future Neutrino Projects
Horn and Solenoid Options in Neutrino Factory
New idea for the target detector: SuperFGD
An Experimental EXERCISE
More results from the OPERA experiment
CERN Neutrino Project 26th November, 2013 M.Nessi.
News and brief overview of Beamline plans for the next few months
Status of the OPERA experiment
The COMET Experiment Ajit Kurup, Imperial College London, on behalf of the COMET Collaboration. ABSTRACT The COherent Muon to Electron Transition (COMET)
nuSTORM: Neutrinos from STORed Muons
Compact and Low Consumption Magnet Design The DESY Experience
Alain Blondel. EUCARD meeting NEU April 2010
Future physics at nuSTORM
CNGS Project Overview Konrad Elsener.
as a prototype for Super c-tau factory
Neutrino Physics with SHiP
Presentation transcript:

CERN restrict meeting, November 26 th 2013 Luca Stanco for the NESSiE Collaboration (Neutrino Experiment with SpectrometerS in Europe) Currently the following Institutions are members of NESSiE: -6 italian groups: Bari, Bologna,Frascati, Lecce, Padova, Roma1 -2 russian groups: SINP-MSU, Lebedev-LPI -1 Zagreb (Croatia) Around 65 physicists plus engineers and technicians Observers: -Strasbourg (France) -Hamburg (Germany) -Napoli (Itay) Collaboration All these groups have long experience in Neutrino Physics and Hardware (Chorus, Macro, Nomad, Opera, T2K …)

2 On the quest for the BLACK SWANs Taleb Nassim, “The Black Swan”, 2007 Ex-statistician, now a very rich person, by applying his theory of Risk Analysis to Financial World if you did not see ever any black swan, does it mean that they do not exist ?

3 In Neutrino Physics we may face a more complicate version: in case they exist, is there more than one species ? And our community own several opinions: -Only one type of Black Swan exists -Looking for more is equivalent to suspect that Flying Donkeys exist even if anybody never saw -How to look for them ? with this ?or like that ?

4 In any case, everybody knows that Risk-Analysis is a touchy and subtle operation. or Pay attention to avoid this situation Looking in the wrong direction Looking all in the same direction

Some facts: 1.Leptonic Flavor investigation should be a MUST for the HEP future 2.CPV is “in our hands” given the ”large” value of  13 3.It may be a long shot, and it might be difficult to have more than ONE Big Project 4.Contemporary R&D and even other Physics programs are mandatory 5.An SBL program may be a good possibility, with measurements of - e /  appearance/disappearance and neutrino cross-sections 6.Under Gran Sasso there are equipments 10 M€ valued to be perfectly usable, with a relative modest investment, for Spectrometers Spectrometers at a neutrino beam. Extended studies: -SPSC-P-343, arXiv: SPSC-P347, arXiv: ESPP, arXiv: LOI CENF: -L. Stanco et al., AHEP 2013 (2013) ID , arXiv: v2 Note: increasing consensus in the Community that Spectrometer(s) are needed either for SBL or LBL 5

Two Iron spectrometers (ICM), t, composed by: 48 yoke blocks,, 4.5 x 0.6 x 1 m, 25t 480 slabs, 2 – 3 t, 1.25m x 3.5–6 m m 2 of RPC «sandwich style» assembly to be made in situ, one piece per time 20,000+12,000 digital channels Two ACM preassembled and installed in one shot Precision Trackers preassembled and installed in one shot Near Nessie movable aside on air-pad MW, 10 kA, power (summed up for ACM and ICM) NESSiE Initial Design ICM ACM Optimized ! Reduced by about a factor of 2 !!! 6

7 Excerpt from ESPP CERN strategy, final document approved on May , Endorsed by CERN Council at the end of June.: High-priority large-scale scientific activities: (c-d-e-f) Following the outcome of the European Strategy Group, CERN committed us to start an R&D program for Neutrino Physics, in sinergy with LBL (USA or Japan), while waiting for a granted SBL beam Another fact:

8 WA104 (NESSiE) CENF/CERN SBL/FNAL NeDe/LBNE (from recent P5 DG presentation)

Which scenarios ? (1)Use OPERA Spectrometers to explore 1-2 orders of magnitude in   disappearance (Need CENF-like  beam, or new tunnels/caverns in NuMI) (1)Use NESSiE-original (ICM+ACM) plus a target (LAr or Scintillators) to also measure NC, and cross-sections (Need CENF-like  beam for Physics Enough FNAL Booster just for cross-sections) (1)Use large-ACM superconducting in LAr (5x3x2) to couple ACM and target. ICM also present, for Physics. How much R&D ? (Need Charged Beams,  beams for Physics as in (2)) (2)Use LAr tank of order 100 ton, with magnetized SC-ACM, and/or ACM-sa Prototype useful for one of the LNBE-Nears (Need Charged Beams, need CENF-like  beam and T600 for Physics) 9

SBL  disappearance search (*) - Focus the physics goal to gain an order of magnitude in  disappearance limit at eV scale for  m 2 - Set the issue of using only iron magnets, with a small scintillator target to measure NC - Define a way to extract oscillation by using a new variable (*) LS et al.: AHEP 2013 (2013) ID , arXiv: v2. 10 Scenario (1)

11 Non oscillation hypothesis is tested with a  2 test to a flat (= 1) distribution New variable: log 10 (1/E) Double ratio (F/N) data / (F/N) no-osci SPECTROMETERS ONLY…  beam anti-  beam 11

T2K, end 2012, ND, data vs Simulation, Part of Scenario (2)

13 Re-arrangement using OPERA Spectrs NESSiE Footprints NEAR SiteFAR Site Height (along y)5.47 m6.65 m Length (along z)10.06 m Transverse (along x)9.75 m13.5 m

14 Conductor: Al Coil Cross Section 72x72 mm 2 Hole (cooling) = 30 mm  Ø B=0.12T NESSiE ACM NEAR SiteFAR Site Nb of coils3951 Conductor Length/coil14,8 m22,3 m Power230 kW450 kW Compare e.g. with ISS-Detectors, 14

15 Sensitivities for the present NESSiE configuration (full simulation, with neutrino beam) Charge ID Momentum measured by range (ICM) up to 3.5 GeV, then ACM and ICM provide ≈30% Momentum Best, ever, sensitivity for  detection with similar apparata over large area (and few MCHF cost) (goal ≥ 250 MeV)

16 However recent developments on SuperConducting cables or even the use of SC coils à la ATLAS allow us to think to a different approach in magnetization. R&D on magnetization of LAr tank: Pros: - best detector for both muons and electrons - similar Near and Far detector sites for the LBNE project - couple ACM with target Cons: - structural forces (depending of the magnetic field) - insulation structures - cost ? - long way ?

17 R&D planning: 1) Prototype ACM-warm (conditionally funded by INFN) 2) Tracking Detectors in Magnetic Field R&D 3) Evaluation ACM-cold 4) Collaboration with LAr activities/groups

18 CONCLUSION/VISION 1.Neutrino Physics is a MUST for Particle Physics (neutrino mass, Majorana/Fermi, astroparticle connection, window for BSM) 2.CERN/Europe should be a MAJOR actor (facilities, past experience, major partner in the Global picture) 3.Large and experienced community (knowledge, motivation, largeness) 4.A Global Coherent Strategy is MANDATORY (increasing bigness of the experiments) 5.Prioritization or Compromise ? (multi-year projects, limited resources)

Thank you ! 19

20 Backup slides

B ( Gauss ) LAr ACM (z = m) z (beam axis, m) 22 Gauss Fringe Magnetic Field upstream the ACM – No shielding 10

0.7 Gauss Fringe Magnetic Field upstream the ACM – With shielding B ( Gauss ) LAr ACM (z = m) z (beam axis, m) 11

Shielding 2 iron slabs (5 cm thick) 1 Vacoflux-50 slab (1 cm thick) Vacoflux = Colbalt-Iron Alloy with maximum saturation at 2.35 T y z 12

New configuration (to be optimized) Iron Core Magnet => 1 higher iron slab (50 cm thick) y 13 z y (m)

New configuration (to be optimized) Iron Core Magnet => 1 higher iron slab (50 cm thick) 14 LAr ACM (z = m) z (beam axis, m)

In the first design the power consuption was P NEAR = 600 kWP FAR = 1630 kW The design was optimized in order to reduce the power consuption but keeping the required muon charge ID Full cross section = 72 x 72 mm 2 Cooling hole  = 30 mm=> Conductor cross-sectionS = 4477 mm 2 Coil length L = 17.2 m Coil number N = 39  Al =  mm 2 / m I =8100 A=>B = 0.12 T P NEAR = N I 2  Al L /S = 270 kW ( P FAR = 760 kW ) Power/Spending review NESSiE – WA104 16

27 OPERA re-use (under pressure of SPSC and INFN) 2 Spectrometers “available”, with Detectors and Servicing Possibility to full re-use for Far AND Near ICM Need two new sets of Yokes (Top & Bottom) new Electronics for RPC Mechanical Tools PT detectors Scintillators Other: ACMs Under discussion in OPERA: possible start dismantling begin 2015

MONEY estimation and Opera endowment Iron magnets: in-kind value 5940 K€ (from OPERA MoU) Cost for transportation to CERN and refurbishing: 3000 K€ In-kind value of Precision Tracker: 1900 K€ possible refurbishing: 700 K€ In-kind value of Scintillators: 1900 K€ possible refurbishing: 300 K€ Cost ACM: 1000 (Near) (Far) TOTAL: = 6 M€ ACM-FAR might be staged at 2 nd phase (after LS2) ACM-NEAR, including R&D, designs, certifications 28 (dismantling in 2015)

Top view Side view

30 Booster Beam (at 700 m) (realistic simulation with fluxes, cross-sections, GEANI 2.6) FNAL options under investigation

Muon momentum distribution Positive polarity (compare all) 22/11/ The spectrum at FNAL is softer than CERN but the rate including the numi off- axis are comparable. In positive polarity the anti-nu from from defocused mesons are small The various component test different L/E

32 New Beam for LBNE (at 700 m) (fluxes comparison, to be evaluated for the LBL-Near Detector)