Progress on resistor failure diagnosis Ben J ( + Matt, Zander)

Slides:



Advertisements
Similar presentations
Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
Advertisements

Building a Weather Station for a Near-Space Payload AEM 1905: Spaceflight with Ballooning University of Minnesota.
CHAPTER 45 Engine Lubrication.
Electronic Troubleshooting
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
Palestine TV Test Jason Link University of Hawaii ANITA Collaboration Meeting at UCI 4/7/05 – 4/9/05.
Focus Coil Update Roy Preece / Tom Bradshaw / Mike Courthold STFC – RAL VC 17 th Jan 2013.
Conduction, Convection, & Radiation
Building a Pressure/Temperature Weather Station (Sensor Pack) AEM 1905, Fall 2008.
KLINGE’S NMR 262 Two Independent Systems Integrated into one Unit This Requires Special Features:  Total Redundancy of Refrigeration Components  Total.
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
Russ Rucinski, Fermilab, March 29, Commissioning is underway! –2 Cassettes installed on 3/18. –Sensors and control heater mounted. –Multi-layer.
CPR2 Optical Cables Joey Huston Michigan State University …taking optical signals from edge of CPR/crack detectors to PMT boxes mounted on back of wedges.
Surface Mount Device Soldering Materials by Linz Craig.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
1 66 blocks are prevalent in the telecommunications industry Today they are used primarily for phone applications only 66 blocks are prevalent in the telecommunications.
1 New dividers for LAV photomultipliers G.Corradi,D.Tagnani,C.Paglia, M. Raggi LAV working group CERN 3/2/2010.
Stephen Pemberton TE-MPE-EE 1 DQLPUR Prototype Testing Initial Results: Thermal Tests Voltage Drop Off Tests.
Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler.
CVD PCB, first steps. 15 mm 25 mm Chip area. No ground plane underneath the chip. Bulk isolated => only one ground line Power lines Connector: 11,1mm*2,1mm:
Modelling of TPM noise problems Greg, following discussions and measurements with David and Senerath.
Status of TRD Chamber and Readout Electronics Integration Ken Oyama and Christian Lippmann for the TRD Collaboration Sep. 26, 2005 TRD status meeting in.
© International Rectifier DirectFET  MOSFETs Double Current Density In High Current DC-DC Converters With Double Sided Cooling.
Assembling the CheapBot Line Follower In 8 easy steps.
Faculty of Physics, University of Belgrade General meeting 19 th of August, ToF-LR HV Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
Introduction to Soldering
Soldering Dennis Yuan Fall What is it for? Making good conductive contact between a component and the PCB Through-hole parts Surface mount parts.
ECE4006 – Final Presentation Group 6, Spring 2003 Gigabit Ethernet Vikas Parekh.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
11/22/2004EE 42 fall 2004 lecture 351 Lecture #35: data transfer Last lecture: –Communications synchronous / asynchronous –Buses This lecture –Transmission.
Design Studies 20 ‘Show Off’ Project How to make a computer monitor In Google Sketchup By: Liam Jack.
Thermal Measurement Choices for Correctors C. Drennan, February 23, 2009.
24/05/2010Rui De Oliveira1 Resistive protections for Bulk Micromegas Rui de oliveira, Joerg Wotschack Venetios Polychronakos.
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
LHCb HCAL PMT problems initial report 1 Yu. Guz. LHCb HCAL & ECAL 2 Yu. Guz PMTs of type HAMAMATSU R are used in both HCAL and ECAL. The detector.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
Yu. Guz 08/02/20121 HCAL 2011/2012 shutdown activities.
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box & Capacitor Status Chiho Wang Duke University.
An introduction to PIC’s for KS3 and KS4. Mr Rooks Hetton School.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
Reading a Utility Meter Mr. Zelinger Arrowhead High School.
Methane Update and Run Plan Ben Jones. Configuration 8 inch PMT with TPB plate - 8” from alpha source - Now includes magnetic shield - 2 inch PMT without.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Installing Branch Circuits Unit #32. What are Wiring Boxes? hold cable or conduit and protect connections attached to building contain all electrical.
Unit 11 - Electric Circuits Physics Book Chapters 19 and 20 Conceptual Physics Book Chapters 33, 34, 35.
GROUND SERVICING OF VARIOUS SUB SYSTEMS
Installing Branch Circuits
Procedure for MCM rework on tray MID 070
Introduction to Soldering (PCB Bread boards)
Digital Multimeter.
Tower 8 – X6 anomaly MRB Meeting – 24 August 2005.
Summary of Fuse Testing for Barrel Module Fuse Boxes
ELECTRONIC CIRCUIT DESIGN & MANUFACTURE
Conduction, Convection, & Radiation
Chapter 31 Battery Systems.
University of Wisconsin-Madison / SSEC
ENE/EIE 325 Electromagnetic Fields and Waves
Series and Parallel Circuits
CHAPTER 45 Engine Lubrication.
EXPERIMENT 1.
SERIES AND PARALLEL CIRCUITS
Warm Up Determine the net force felt by the +2mC sphere.
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
Series and Parallel circuits
Soldering: Methods, Tips, and Applications
REVIEW of Static electricity
MEG II実験 液体キセノン検出器の建設状況
Fin & Countertop Sample Kit Instructions
Presentation transcript:

Progress on resistor failure diagnosis Ben J ( + Matt, Zander)

Effect of Orientation / dark box tests In our “dark cardboard box”, we ran spare PMT all weekend exploring different orientations of PMT We had already reported some possible small gain shifts with the box upright We saw one possible large gain shift over the weekend with box on its side The frequency of the shifts is not the same as the failure mode we saw in situ, and base impedance appears to be unaffected We checked the effect of stray light in the annex (lights on / off) and know this has no effect But, we are doubting the stability of this setup for performing long term tests, and consider these results to be inconclusive at present.

“left” “right” “HV” Strain relief points and failed resistors highlighted During installation we noticed stray conductance between “right” and ground which could be removed by scraping base with stylus. Physical location of failures hints at this as being relevant to failures.

Paula added strain relief to 3 blank bases for us, prepared and cleaned as with MicroBooNE bases Also added extra strain relief at “HV”, not in uB bases With a voltmeter, we measured resistance between strain relief and each component mounting pad for each resistor on the top face Conductive pathways with O(100 MOhm) are found to resistors near the support pins. Paths to more distant resistors show no conductance To cross check whether this is nominal stray conductance of the base material, checked between pairs of adjacent pads elsehwere on base, no other stray conductances seen Where there is conductance, not always possible to obtain a stable measurement - we record here the lowest measured value. Stray Conductance Tests

Measured conductances

Failed resistors highlighted

Stray conductance found on 1/3 bases Stray conductance found on 2/3 bases Stray conductance found on 3/3 bases From “left” reliefFrom “right” reliefFrom “HV” relief

Effect of Temperature If this effect is related to our failures, it is important to understand temperature dependence Matt prepared a PCB using solder flux to artificially create a conductive path between to PCB pads We monitored the resistance as it was lowered into a bath of LN2 Reliably the resistance rises from initial ~180MOhm to off scale (>500 MOhm) during dunk test, and returns to original value in the warm If these conductive paths are important for the failure mode, we will be safer at LAr temperature than room temp Flux path added Ω

Effect of Temperature on Real Bases Flux paths are intermittent on the real bases The act of soldering a cable onto the base(rosin cored solder) appeared to remove the conductivity on the first 3 bases We had Paula prepare a forth base after cables were attached for measuring paths One path was found, but required moving one of the attached cables. Attaching using organic cored solder, the flux path survived Same behavior observed, 100MOhm resistance increased to 1GOhm (but not open) on cooling to LN2 temperature

Linking flux paths to failures Physical layout of flux and resistors is suggestive We tried to simulate a failure in two ways: – 1. Add flux to a working PMT base over loops and resistors. PMT has been operated stably overnight and shows no sign of failure. First run was about 14 hours with flux added, no problems We then deliberately damaged the cable sheath near the loops and the shield with steadily increasing malevolence, and still see no problems. We accidentally exposed the PMT to a large light leak, and saw no problems – 2. Hold HV across a conductive flux path for some time and check for variations over time. Limited resolution for our ammeter made it impossible to see small changes, but no long- lived changes or large breakdowns were observed. As yet we have not demonstrated a link between stray flux conductance and resistor failure.