FTK infrastructures and DCS 02/12/20101FTK Initial Design Review - A. Lanza  Crates  Single rack layout  Cabling  Rack placement  DSS  DCS.

Slides:



Advertisements
Similar presentations
CSC upgrade for LS1 USA-15 rack: layout, construction and installation 11 th February 2013.
Advertisements

Total HVAC Control from anywhere Easy control that can save a fortune
André Augustinus 16 June 2003 DCS Workshop Safety.
Power distribution box XD1 top DTTF_Crate XD2 middle DTTF_Crate XD3 bottom DTTF_Crate Connection to DTTF_Crate through cable USE H07 ZZ-F 3G1,5 RACK S1D01.
LECC V. Bobillier1 Overview of LHCb Electronics installation aspects V. Bobillier; L. Roy; J. Christiansen CERN - LHCb.
Presents The Silver Family An Integrated Approach to Processors, Data Communication and Head End Integration.
DCS aspects of TDAQ racks in USA15 and SDX1 Y. Ermoline et al. ATLAS Week, CERN, 15 February 2005.
Tullio Grassi ATLAS–CMS Power Working Group 31 March 2010 DC-DC converters and Power Supplies requirements for CMS HCAL Phase 1 Upgrade.
ITOP LV power supply and cable scheme G. Visser Indiana University 3/17/2015.
September 26, 2013 xTCA work group Evaluation results from AC/DC converters for xTCA Collaboration (CERN PH-ESE-BE) Vincent Bobillier, Matteo Di Cosmo,
June 2008 R&D Center / BCS HW Team Introduction to iPECS P5 Hardware.
DSS Advisory Board Christoph Schäfer Rack Safety System.
ZTF Interconnecting Scheme Stephen Kaye
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
1 Low Voltage Power Supplies for ALICE TB L.Jirden u Recall: u target devices & possible solutions u Outstanding actions.
Verigy V93000 Service Training
JPV, TB of Nov.15 th, ‘Rack Status‘ Jean-Pierre Vanuxem, PH-AIS.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
Electronic Systems Support LHC Crates 2005 Paul Harwood PH Electronic Systems Support Group (PH-ESS) Meeting Sept 1, 2004.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
15/12/10FV 1 Common DCS hardware. General ideas Centralized system: o Common computers. Detector dedicated computers (with detector participation) only.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
Electronic Systems Support CAN Branch PSU Designed: Bjorn Halgren PH-ESS Responsible:Paul Harwood.
Alex Madorsky University of Florida/Physics Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts Alex Madorsky.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
1/12/2010 R. CIARANFI 1 NEW NINO BOARD FOR RICH OLD AND NEW LOGISTIC NEW BOARD DESCRIPTION NEW MODULARITY 32 CH NEW FORM FACTOR FRONT END AREA AND DAQ.
CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
17/03/2003 Referee Meeting M. Beretta 1 MDT Barrel - Complete LV-HV rack 6U 1U 4U 2U 45U 19” Tangential Fan High Voltage Crate Low Voltage Crate Heat Exchanger.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
06/03/2002Ivan Hruska EP/ATE1 LV brick for TILECAL  Overview Design summary Results from 2nd radiation tests in PSI Villingen Bulk supply Plans for future.
Single Board Controller Comments Roger Smith Caltech
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
New digital readout of HFRAMDON neutron counters Proposal Version 2.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
System Demonstrator: status & planning The system demonstrator starts as “vertical slice”: The vertical slice will grow to include all FTK functions, but.
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
Status of integration in USA15. Status of rack layout 20/03/2015FTK Italia - A. Lanza2 Rack Y A2 equipped with turbine cooling system and nominal.
News on FTK rack infrastructure A. Lanza – INFN Pavia FTK Italy meeting –
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
FTK crates, power supplies and cooling issues 13/03/20131FTK-IAPP workshop - A. Lanza  Racks, crates and PS: requirements  Wiener crates  Rittal crates.
AMBFTK Report AMBFTK: problems to solve Power distribution: Crates – compatibility with CDF crates? Thermal dissipation: Cooling Signals I/O:
S A Griffiths CM42 June 2015 Electrical & Control.
Detector Control for the Insertable B-Layer Susanne Kersten Wuppertal University ATLAS Upgrade Workshop, February
Power consumption (Watts) LBB27 ROS18 TSC50 TIM8 1 SC crate416 Alignment20 TOTAL per rack906~1 kW X2J22X2J02 With a water flow of 10 l/min, it should.
Firmware development for the AM Board
Status of the CERN ATCA specification and tender
LKr status R. Fantechi.
Rack Design Proposal as of 01/03/2013
FTK infrastructure in USA15 Status and plans for 2015 A
General aspects: Optical links :
Institute of Nuclear Physics Polish Academy of Sciences
ABB i-bus® KNX The new Room Master RM/S 3.1 and RM/S 4.1
AM system Status & Racks/crates issues
Mini-drawers, FE-ASIC , Integrator
MicroTCA Common Platform For CMS Working Group
SCT/Pixel Draft Rack Layout rcj
Pierluigi Paolucci - I.N.F.N. Naples
Robert Gomez-Reino Garrido
Radiation- and Magnet field- Tolerant Power Supply System
Pierluigi Paolucci - I.N.F.N. Naples
ATLAS USA15 - Rack 52U with 9U crates, remote PS
Track Finder Crate, Backplane and Parts
TileCal ROD Commissioning Counting Room Installation
TPC Detector Control System
Front End Driver (FED) Crates and Racks +Tracker PSU racks
Total HVAC Control from anywhere Easy control that can save a fortune
PID meeting Mechanical implementation Electronics architecture
Presentation transcript:

FTK infrastructures and DCS 02/12/20101FTK Initial Design Review - A. Lanza  Crates  Single rack layout  Cabling  Rack placement  DSS  DCS

Crates Requirements:  9U with VME64X backplane with 21 slots  power supply (PS) with (5kW)  rear card cage up to 28 cm deep for the AUX boards  For good cooling of AUX boards, the PS must be placed externally to the bin  max height 14U all included Commercial crates on the market:  Wiener is at present the only producer of VME64X 9U crates, available in two versions: 6021 and 6023 Constraints of Wiener crates:  3U PS(UEP6021) is only 3kW, 6U needed to extend to 6kW with  6023 is 12U high, while 6021 is 11U. In order to fit the ATLAS standard 52U rack with three crates, model 6021 is preferred 02/12/2010FTK Initial Design Review - A. Lanza2 Wiener VME64X-9U 6021

Crates – cont’d 02/12/2010FTK Initial Design Review - A. Lanza3 Customization of 5kW power supply unit:  Height must be contained within 3U  Rack-compatible and air-ventilated box  Connection with the Wiener bin done by means of PCB plug/receptacle backplane (study needed)  Connection of DB-Sub monitoring/control lines done by means of external cables Possible alternatives:  Reduce the crates per rack from 3 to 2, using the 6U PS available from Wiener catalog  Designing a 3U custom PS using commercial AC/DC modules  There is the possibility, with the new chip, that a 3kW PS will deliver enough power. To clarify in some months from now Wiener available for discussing a solution, other companies to be contacted Plug/receptacle power connection of the Wiener bin/power supply

Single rack layout 02/12/2010FTK Initial Design Review - A. Lanza4 Option 1 Rack layout with three crates. A 3U power supply and a 11U VME bin are assumed. A 12U VME bin can be used (Wiener 6023) but requires a 56U rack. Option 2 Rack layout with two crates. A 6U power supply, like the 6kW Wiener UEP6021, is assumed. The crate type 6023 can also be used with the standard 52U rack.

9Ux280mm Single rack layout – cooling 02/12/2010FTK Initial Design Review - A. Lanza5 Cooled zone Cooling pipes and electrical services  Required cooled region depth = 680 mm  Heat exchangers and air deflector length = 725 mm OK  Turbine length = 725 mm including rotor, real length ~ 630 mm PROBABLY OK  Rack cooling panels depth = 525 mm NOT OK Design of AUX board should place the hottest chips within 100 mm from VME backplane Some cooling improvement could be necessary, as well as installing some T sensors inside and on the back of crates Extender 9Ux280mm

Cabling 02/12/2010FTK Initial Design Review - A. Lanza6 Fibers used as inputs and outputs of Data Formatters:  collected in bundles, probably 6 fibers per bundle or multiples of 6  Inputs routed from Pixels and SCT RODs, located in USA level 2, as well as outputs to ROSes. IF FTK racks will be located at the same level, routing very easy through the false floor channels Fibers between DFs and AMboards:  Probably connected in bundles  Adjacent racks for DFs and AMboards desirable DSS cables:  Embedded in rack installation DCS cables:  CANbus twisted cable connecting all crates to the DCS PC

Rack placement 02/12/2010FTK Initial Design Review - A. Lanza7 Map of USA15 level 1. Only four racks are empty. Space for new racks is quite reduced. Moreover, cabling from RODs is more complicated. Corridor and lift Stairs Empty racks Full FTK will need 13 crates for AMboards. If option 1 can be used, total racks are spare. In case option 2 has to be used, total racks must be spare. We also need one crate for ROS + ROBINs, it could be placed together with other ROSes.

Rack placement – Cont’d 02/12/2010FTK Initial Design Review - A. Lanza8 Pixel and SCT RODs and ROSes are all at this level. Placing FTK here will simplify cabling. Lift Available space Pixel RODs SCT RODs ROSes Stairs Map of USA15 level 2. Some space seems available for placing additional 6 or 8 racks.

DSS 02/12/2010FTK Initial Design Review - A. Lanza9 Alarms to implement on the DSS PLC in USA15 level 1 or level 2 (persistance and delay to fix):  Services (level 2 alarm) o Cooling AL_INF_CoolingUSA15_RackFailure – action: power cut all racks  Smoke (level 2 alarms) o Rack detection AL_Smoke_FTK_Yxxxxxx … # of used racks – action: power cut AL_Smoke_FTK_Yzzzzzz related rack o Environmental AL_INF_Smoke_USA15L2(1)RackRoomSideA – action: power cut AL_INF_Smoke_USA15L2(1)RackRoomSideC all racks  Specific (level 2 alarms) o Flooding AL_INF_USA15andUX15_Flooding – action: power cut all racks o Emergency Button AL_EmergencyATLASoff – action: power cut all racks

DCS 02/12/2010FTK Initial Design Review - A. Lanza10 Monitoring and control of racks:  ELMB embedded in rack turbine and serially connected via CANbus  Parameters monitored via the ATLAS central Common Infrastructure Control (CIC): USA15 Cooling TemperatureInlet and TemperatureOutlet – action: DSS Status of racks (on/off) – action: set alarm Status of turbines (consumption current) – action: set alarm  Parameters controlled via CIC: Status of racks (on/off) – action: switch on or off racks Monitoring of T inside racks and crates (if installed):  Thermistors to be installed inside racks and crates (embedded onboard?)  FTK ELMB needed (64 channels)  FTK DCS PC needed. To be installed in an already existing rack with horizontal cooling and under UPS power. It could also be used for FPGA initializations  Interface between CANbus and PC needed (Kvaser board or similar)

DCS – Cont’d 02/12/2010FTK Initial Design Review - A. Lanza11 Monitoring of crates:  Using the CAN controller embedded in the crate fan unit  Monitored parameters: Voltages, currents, fan speeds  Monitored alarms: overheat, overload, overvoltage, undervoltage, fan failure  Control parameters: Crate on/off

Summary 02/12/2010FTK Initial Design Review - A. Lanza12 Open issues: 1.Reduction of crate power supplies to 3U (if possible) Milestone: end June Placement of PS on rack under the bin Milestone: end June Electrical connections between PS and bin Milestone: end September Decision between option 1 and option 2 for the rack layout Milestone: end 2011? 5.Decision on rack number: 6 or 8 Milestone: follows item 5 6.Enlargement of cooling region inside racks Milestone: project - end September 2011, implementation – after rack installation 7.Decision on rack positions Milestone: asap 8.Decision on placement of the ROS crate Milestone: asap 9.Decision on placement of DCS PC Milestone: asap