EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.

Slides:



Advertisements
Similar presentations
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Advertisements

Enrique Calvo Alamillo Madrid 1 March Index: 1.Proposal for a DHCAL m3 module. 2.Numerical simulations for a m3 module. 3.Extrapolation of the m3.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
01/07/2008HCAL Main Meeting- Mechanical Integration1 ILD HCAL Mechanical Integration HCAL Main Meeting Kirsten Kschioneck, DESY.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
Marc Anduze – 09/09/2008 News on moulds and structures CALICE meeting - Manchester.
Mickael Frotin– 07/06/2009 Demonstrator - Assembly ECAL meeting - London.
Anduze – 03/09/ Alveolar Structure - Towards ordering of pieces.
Mickael Frotin– 15/01/2010 ECAL MACHANICAL R&D ECAL meeting - PARIS 1.
1 ILD/CMS Engineering Meeting M. Joré – ILD integration philosophy Integration philosophy of ILD Matthieu Joré – January 21st Integration of the subdetectors.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
Hcal Geometry and Assembly CLIC Meeting - LAPP December 2008, 15th.
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
AHCAL updates: SPIROC and DIF Mathias Reinecke, Felix Sefkow CALICE/EUDET electronics meeting London, January 10, 2008.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague CALICE ECal Status Report.
HCAL Mechanical Design Victor Guarino HEP-ANL. Work to date.. Have been thinking about how to construct individual modules and assemble them into a barrel.
Tungsten as HCal-material for a LC at multi-TeV energies CALICE AHCAL Meeting, DESY 17 July 2009 Christian Grefe for the Linear Collider Detector Group.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
AHCAL Mechanics status report Karsten Gadow CALICE Collaboration Meeting Argonne,
Septembre SLAC BeamCal W. Lohmann, DESY BeamCal: ensures hermeticity of the detector to smallest polar angles -important for searches Serves as.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
Status report AHCAL Mechanics Karsten Gadow CALICE Collaboration Meeting KEK, Studies of AHCAL absorber structure stability.
The HCAL barrel absorber structure
Pure Tungsten HCal: ‘staircase’ design Structural analyses and possible optimizations.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
IPN Lyon ILD integration April 2015 Jean-Christophe Ianigro & Imad Laktineh - IPN Lyon -
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
SiD Hcal structure & 1m² Micromegas chamber prototype CALICE 2009 – LYON – 2009, septembre 17 th.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
Hcal Geometry and Assembly Videoconference January 2008, 24th.
HCAL Modules -First Ideas Mathias ReineckeHCAL – MPI meetingJan Motivation 2.Mechanical Constraints 3.HCAL Base Unit (HBU) 4.Light Calibration.
Third LPSC – 02 Nov 2014 Denis Grondin, Julien Giraud Si/W ECAL Endcap structures and cooling LPSC - Grenoble –nov Design of the.
The ILD ECAL Jan th Paris Satoru Uozumi (Kyungpook Natl. Univ.) for the ILD ECAL group Contents :
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
Future test beam options Felix Sefkow CALICE AHCAL main meeting DESY, June 16, 2009.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Mickael Frotin– 19/10/2009 ECAL MACHANICAL R&D CALICE meeting - Genève 1.
Ideas for a Tungsten HCal Prototype CALICE Collaboration Meeting, Lyon September 18, 2009 Christian Grefe CERN, Bonn University.
Test Beam Request for the Semi-Digital Hadronic Calorimeter
FCAL R&D towards a prototype of very compact calorimeter
ILD Technical Coordination
Hcal Geometry and Assembly
HCAL preliminary analysis and results
Felix Sefkow DESY LDC at Vienna November 17, 2005
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Development of a low material endplate for LP1 and ILD
PANDA Yoke of the Magnet
Dead zone analysis of ECAL barrel modules under static and dynamic loads for ILD Thomas PIERRE-EMILE, Marc ANDUZE– LLR.
LumiCal mechanical design, integration with LDC and laser alignment
IHEP group Shashlyk activity towards TDR
SDHCAL Integration Moi j’aime bien SAFARI
Vertex Detector Mechanical R&D Design Questions and Issues
HCAL task status report
First of all we will remind some numbers:
The 11T cryo-assembly: summary of design and integration aspects
SIT AND FTD DESIGN FOR ILD
HCAL Modules -First Ideas
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Scintillator HCAL: LOI issues
Presentation transcript:

EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009

MC HCAL mechanics Felix Sefkow February 20, Status Barrel structure Prototypes Handling and Measuring

MC HCAL mechanics Felix Sefkow February 20, Barrel structure Reminder: started from TESLA structure 2 halves (rings), 8*2 sectors: 32 modules Advantages: –layer-wise electronics (DIF, power) at end face, accessible at short access –Maximum filling between inner and outer radius Drawbacks: –Less rigid –Some space required at barrel end face, but this can be made as compact as for the ECAL Pointing cracks: not a serious issue –There is material: rather a dead region than a crack, <<, ~ X 0, not critical for hadrons –Implemented in Mokka

MC HCAL mechanics Felix Sefkow February 20, FEM calculations Adapt ILD parameters Implement module details (plates, side panels) in full barrel structure Maximum deformations tolerable Understand how to support system Know forces between modules Max 0.1 mm Max 3 mm

MC HCAL mechanics Felix Sefkow February 20, Integration HCAL has to stand on tip, two rails at 4 and 8 o’clock Different scenarios for assembly and ECAL installation

MC HCAL mechanics Felix Sefkow February 20, Horizontal rototype Horizontal cross section: 4 plates, full size –Control of mechanical tolerances and fixation techniques over the full extension –Mechanical interplay with the active layer and insertion procedures –Heat dissipation and thermal properties, gradients –Electronic signal transport and integrity over the full length of read-out lines –Calorimeter signal uniformity over the full area Need 6 HBUs for 1 slab, 12 for a layer

MC HCAL mechanics Felix Sefkow February 20, Vertical prototypes Vertical cross sections, 36 cm deep –Mechanical stability, deformations under various orientations and stresses –Accumulation of tolerances in the stack structure –Connectivity with external electronics –Multi-layer signal processing and concentration –Integration of controls, supplies and services and cooling under tight spacial constraints With 12 HBUs more than sufficiently instrumented for e.m. showers –See minical

MC HCAL mechanics Felix Sefkow February 20, Scalable structure Towards a full HCAL prototype Adaptable to overall layout of test beam configuration –ECAL, B field Can still use existing movable table

MC HCAL mechanics Felix Sefkow February 20, Handling, measuremnts Tools in place for handling 750t objects First measurements done on table, next in hanging position Flatness tolerances of commercially available rolled material by far not sufficient –Back-up: machine; but expensive Plan to explore measuring and rectifying

MC HCAL mechanics Felix Sefkow February 20, Material properties Composition –Ni at lower limit Magetic tests –Using 4T magnet –Different suppliers –Before and after cutting, welding –OK so far, quantitative results not yet

MC HCAL mechanics Felix Sefkow February 20, Measure forces Small prototype with original size panels and screws –Will also test welded structure Force and deflection sensors, data logger Verify FEM model

MC HCAL mechanics Felix Sefkow February 20, Conclusion Following barrel design with end face electronics –In principle works for scintillator and gas We will have mechanical structures in place this summer –On EUDET schedule –Can receive first HBU with SPIROC2 (only) These are technical prototypes, following ILD design –SiD issues are very similar We are collecting a lot of experience –Handling, tooling, tolerances We are gathering realistic cost and production time data –Also relevant for “Videau” structure To be continued in consultation with MPI engineers