ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Early Coordination This required step.

Slides:



Advertisements
Similar presentations
Metro Muncipal Agreement Program
Advertisements

Local Agency Bridge (LABP) Program Overview Informational Presentation – January 7, 2011 Carol Olsen, ODOT LGS Bridge Program Manager Local.
Stormwater Management Initiative Update. ODOTs Goal Develop a streamlined stormwater runoff treatment program to: Develop a streamlined stormwater runoff.
ODOT’s Public Involvement Process PI and the Project Development Process Minimum PI Requirements.
Section 4(f) Section 6(f). Section 4(f) Process Overview 2 Project Initiation Package Field Review 4(f) Property Present Use Coordination NEPA Document.
Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
Major Incident Process
 WELCOME  Welcome to the home page for the Louisiana Mapping Project (LaMP). The LaMP effort is being undertaken by Department of Homeland Security’s.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Oregon’s Federal Aid Highway Programmatic.
Project Prospectus and Design Acceptance Package ( and a little more) Alan Lively Project Delivery Specialist January 30, 2009.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Contract Specifications Background on.
Oregon Jobs and Transportation Act Section 18 CETAS Director’s Meeting Action Items.
Adjusting EPLC to your Project Colleen Robinson & Teresa Kinley Friday, February 6, 2009.
BIOLOGICAL RESOURCES Ken Cannon ODOT Aquatic Biology and Fish Passage Program Coordinator.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 When a new project begins early coordination,
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Bank Stabilization Streambank or channel.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Welcome to Oregon’s Programmatic ESA.
Stormwater Management Initiative Update. ODOT’s Goal Develop a streamlined stormwater runoff treatment program to: Develop a streamlined stormwater runoff.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Completing the NEPA Process for CatEx Projects: Part 3 to CE Closeout.
Stormwater Management Initiative Update. ODOT’s Goal Develop a streamlined stormwater runoff treatment program to: Develop a streamlined stormwater runoff.
SAFETEA-LU Changes  Exemption of the Interstate System from Section 4(f) [Section 6007]  de minimis impacts to historic sites [Section 6009(a)]  de.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Energy, Environmental Impacts, and Sustainable Development Presented by Cat Shrier, Ph.D., P.G. Water Resources Planner (403)
Information Technology Project Management Buying Packaged Software: RFPs and Vendor Selection.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Roles & Responsibilities Project Biologist.
INTRODUCTION TO SECTION 4(f) Presented by Ian Chidister Environmental Program Manager FHWA – Wisconsin Division December 4, 2013.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Oregon’s Federal Highway Aid Programmatic.
At the last Steering Team meeting… Goals (Rule-level) EPS (Measurable and Reportable) Natural Resources Human/Cultural Environment Administrative Avoid,
Local Government Section Welcome Marty Andersen ODOT Local Government Section 355 Capitol Street NE, Rm. 326 Salem, Oregon Ph:
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Welcome to Oregon’s Programmatic ESA.
JTA Section 18 Steering Team Meeting Environmental Performance Standards.
1 C E T A S Purpose and Need Presentation Date Project Name Project location (city, county) ODOT Key Number:
1 C E T A S Triage Presentation, Date Project Name Project location (city, county) ODOT Key Number:
Number of Copies Agency Submissions & Comments. Coordination ESRs are reviewed by OES and coordinated with resource agencies as part of the NEPA review.
OREGON DEPARTMENT OF TRANSPORTATION Practical Design Decision Matrix.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Fish Habitat Restoration.
Wetlands and Waterways Permits Ken Franklin Statewide Permits Program Coordinator Geo-Environmental, ODOT.
Locally Administered Federal-Aid Project Initiation Workshop Prospectus Part 3 and NEPA Requirements Presenter: Howard Postovit; ODOT Region 5 Region Environmental.
Oregon Department of Transportation Stormwater Management Initiative: Meeting New Challenges Presented by: William Fletcher, ODOT February 5, 2008.
Environmental Assessment in British Columbia Forum of Federations Conference September 14, 2009.
Section 4(f)/6(f) Categorical Exclusion Training Class.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Pile Driving/Pile Removal.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Early Coordination This required step.
Locally Administered Federal-Aid Project Initiation Workshop Project Scoping John Condon & Mike Barry November 14,
Public Involvement How to Plan and Conduct Effectively Presented by the Ohio Department of Transportation’s Office of Environmental Services.
Oregon Department of Transportation Stormwater Management Initiative: Meeting New Challenges Presented by: William Fletcher and Jennifer Sellers January.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Clearing and Site Preparation and Site.
Responsibilities of Lead Agency Pages 7-8 of Training Guide 1. Preliminary review a) Determine if activity is a project as described by CEQA b) May require.
Wholesale Local Service - Planned Outages November 2014.
Restoration and Regulation Discussion
Programmatic Agreements
Fluvial Criteria in the FAHP
Teacher: Alison Roberts Northern Sydney Institute of TAFE
2016 FHWA National Hydraulic Engineers Conference
2015 FAHP Annual Meeting For Oregon’s Programmatic Endangered Species Act Consultation on the Federal-Aid Highway Program March 15, 2016.
Formal Meetings between FDA and Sponsors of PDUFA Products
Engineering Major Projects: Raleigh Office Minor Projects: Division Office -This is a NCDOT policy, not a FHWA policy; it’s meant to avoid conflicts of.
Sara Eddy Fisheries Protection Program Fisheries and Oceans Canada
Overview of the Commodity Quality Feedback Loop
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
Involuntary Resettlement 0P 4.12: Planning Instruments
SR 400 Express Lanes: Market Sounding
Project Development Quality Program QA/QC – What does ODOT need?
[Project Name] Project Gating Presentation
Consultation (C) After approval of the EIS, FONSI, or CE designation, the applicant shall consult with the Administration prior to requesting any major.
Environmental Commitments
Restoration and Regulation Discussion
Protecting What We Love Building What We Need – The “H” Factor
WGCV CARD4L Peer Review Medhavy Thankappan WGCV-45 July 15-19, 2019.
Presentation transcript:

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Early Coordination This required step occurs during project development, shortly after project kick-off or at least by the Design Acceptance Package (DAP) stage of project development. The purpose of early coordination is to present basic project information to the Service so that they can provide feedback and guidance in advance of project notification, particularly for actions that require review/approval or will need special information (e.g., a Fish Passage Plan, NMFS Hydro staff review, or will likely need some kind of off-setting measures). (Page 10)

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 When a new project begins early coordination, the project proponent (REU or local agency) will alert project stakeholders via regarding: Project Name Key # Location General concept of project with anticipated activities that may affect species (Turning lane with new ISA for example) Estimated Project Notification (Fall 2014) Early Coordination (Page 10)

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Prior to Project Notification, the project proponent must document early coordination discussions – Memo –Initiation Form

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Early Coordination Lowers risk – Project delays, last minute back and forth with the agencies. FHWA will not accept a FAHP notification unless it’s clear the adequate pre-consultation has been done. Some types of off-setting or mitigation can take time to locate. When project notifications are submitted to NMFS, the review and draft approval should be completed quickly if the early coordination occurs. Prior to FHWA submittal, send the draft notification form to the NMFS Liaison for a review.

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Fluvial Determine approximate ACW. Identify as early as possible whether or not there are site conditions that allow flexibility in the criteria. Identify potential site constraints Identify off-setting opportunities if needed. If a multi-span is likely, identify critical in-stream areas to avoid. Work Bridges & Detours

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Pile Driving Coordinate early with the liaison if you will have impact pile driving. The typical IWW window set by ODFW does not work if there are adult ESA-listed species migrating through the action area. NMFS will look to have a different pile driving work window or windows. Early development allows these periods to be put into the contract specs. This occurs on the Sandy River, Willamette River, Oregon Coastal streams, and a few others.

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Stormwater Identify trigger(s) Estimate CIA if possible. Site Constraints Proprietary systems WDE TAPE program Existing systems Capacity Standards

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Fish Passage NMFS will need to review all fish passage related projects. This review can take time and there are data needs depending on the type of project. This can be done when ODFW is doing their review.

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Floodplain Restoration These projects are not very common, but do occur as mitigation. These projects have to go through NMFS fluvial geomorphologist (Janine Castro). Early coordination is essential to prevent any last minute issues. Depending on the restoration type, different types of data may be requested.