International Workshop Jan 21– 24, 2012 Jacksonville, Fl USA INCOSE IW 2012 MBSE Workshop INCOSE MBSE Initiative Methods and Metrics Activity John C. Watson.

Slides:



Advertisements
Similar presentations
1.
Advertisements

A Combat Support Agency Defense Information Systems Agency Model Based Systems Engineering and Systems Modeling Language Chris Gedo Chief, Architecture.
Welcome ISO9001:2000 Foundation Workshop.
NDIA SE Division Meeting February 13, Developmental Test and Evaluation Committee Beth Wilson, Raytheon Steve Scukanec, Northrop Grumman Industry.
A Taxonomy of Evaluation Approaches in Software Engineering A. Chatzigeorgiou, T. Chaikalis, G. Paschalidou, N. Vesyropoulos, C. K. Georgiadis, E. Stiakakis.
A framework to assess project technical progress.
Creating Pathways for Education, Career and Life Success Webinar: Developing a Pathways Plan January 18, 2013 Facilitated by Jeff Fantine, Consultant.
KS3 Phase4 Client Server Monitoring System October 1, 2008 by Stephen, Seema, Kam, Shpetim.
The Major Steps of a Public Health Evaluation 1. Engage Stakeholders 2. Describe the program 3. Focus on the evaluation design 4. Gather credible evidence.
International Workshop Jan 21– 24, 2012 Jacksonville, Fl USA Model-based Systems Engineering (MBSE) Initiative Slides by Henson Graves Presented by Matthew.
1 Results-based Monitoring, Training Workshop, Windhoek, Results-based Monitoring Purpose and tasks Steps 1 to 5 of establishing a RbM.
INCOSE Systems of Systems Working Group Alan Harding BAE Systems Dr. Judith Dahmann MITRE Corporation SoS Working Group Co-chairs.
Enterprise Engineering Directorate (EE)
National ITS Architecture Deployment Support October 27, 2009 T3 Webinars are brought to you by the ITS Professional Capacity Building Program (ITS PCB)
Student Data Notebooks Data Driven Decisions in the Classroom.
International Workshop Jan 21– 24, 2012 Jacksonville, Fl USA INCOSE IW 2012 MBSE Requirement Flowdown Workshop - Outbrief - John C. Watson Principal Member.
International Workshop 28 Jan – 2 Feb 2011 Phoenix, AZ, USA INCOSE MBSE Initiative Methodology and Metrics Activity Overview, Update, & Breakout Agenda.
International Workshop 28 Jan – 2 Feb 2011 Phoenix, AZ, USA Modeling Standards Activity Team Model-based Systems Engineering (MBSE) Initiative Roger Burkhart.
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
INCOSE IW 2012 MBSE Workshop Systems Modeling
International Workshop 26 Jan – 29 Jan 2013 Jacksonville, FL, USA MBSE Workshop INCOSE IW 2013 MBSE Workshop January 26-27, 2013 Introduction MBSE Chairs.
1 Copyright © 2014 by Lockheed Martin Corporation SE Use Cases SysML Roadmap Activity John Watson Lockheed Martin 6/17/2014.
International Workshop Jan 21– 24, 2012 Jacksonville, Fl USA Model-based Systems Engineering (MBSE) Initiative Ontology Action Team INCOSE MBSE Workshop.
Copyright © 2011 by Lockheed Martin Corporation INCOSE – MBSE Model Management Workshop 01/29/2011 John C. Watson Principal Member of Engineering Staff.
INCOSE MBSE Biomedical Working Group/Drug Delivery Model Project Overview: – Involve BWG members in the use of MBSE and expand the application beyond defense.
International Workshop 28 Jan – 2 Feb 2011 Phoenix, AZ, USA INCOSE MBSE Initiative Methodology and Metrics Activity Breakout Session Outbrief 31 January.
Status of SysML v2 Planning & Requirements Berlin, Germany June 16, roadmap:sysml_assessment_and_roadmap_working_group.
Understanding the RUC Survey Instrument
PDSA - CONTINUOUS SCHOOL IMPROVEMENT PLANNING
Board Meeting and training
Elementary School Counseling Essentials
Quad Charts for: TIMLM WG.
Evaluation of Priority Gender Equality
INCOSE IS 2013 MBSE Track June 23-27, 2013
INCOSE Usability Working Group
INCOSE Usability Working Group
CS4311 Spring 2011 Process Improvement Dr
John C. Watson Principal Member of Engineering Staff
Identify the Risk of Not Doing BA
Decision Analysis Working Group
Strategic Planning for Learning Organizations
Level 1 Level 1 – Initial: The software process is characterized as ad hoc and occasionally even chaotic. Few processes are defined, and success depends.
INCOSE IW 2014 MBSE Workshop January 25-26, 2014
Deputy Director for Engineering, Tools & Environments
Rotorcraft Industry Seminar Rotorcraft Risks and Issues 7 September 2017 OFFICIAL SENSITIVE.
‘Rising Tide’ Strategies
RESEARCH TOOLS FOR UNDERSTANDING SPORTS CONSUMERS
Support for the AASHTO Committee on Planning (COP) and its Subcommittees in Responding to the AASHTO Strategic Plan Prepared for NCHRP 8-36, TASK 138.
The 9 steps to successful project implementation
ASSESS Initiative Update
Regulatory Responses (n=11) Company Responses (n=20)
Collaboration Adoption Framework
Communication Tools: Sample PowerPoint presentation
Assessment Workshop Title of the Project (date)
Strategic Planning Summary.
Collaboration Adoption Framework
Informed Consent (SBER)
Regulatory Responses (n=11) Company Responses (n=20)
Measuring What Matters
Portfolio, Programme and Project
Software Project Management
Quick orientation for MBSE Usability Group
INCOSE IW 2014 Town Hall January 27, 2014
Chapter 2 Process Models
Data collection and validation support for the management of the ESF
Elementary School Counseling Essentials
Communication Tools: Sample PowerPoint presentation
Time Scheduling and Project management
Task Force Household Budget Survey Innovative tools and sources
Status of SysML v2 Planning & Requirements
Presentation transcript:

International Workshop Jan 21– 24, 2012 Jacksonville, Fl USA INCOSE IW 2012 MBSE Workshop INCOSE MBSE Initiative Methods and Metrics Activity John C. Watson Principal Member of Engineering Staff Lockheed Martin, MS2 Moorestown

International Workshop Jan 21– 24, 2012 Jacksonville, Fl USA Methodologies Goal – Provide the INCOSE Community with a survey of available MBSE Methodologies Foundational work based on 2008 paper by Jeff Estefan –Survey of Model-Based Systems Engineering (MBSE) MethodologiesSurvey of Model-Based Systems Engineering (MBSE) Methodologies Additional methodologies have been added and updated

International Workshop Jan 21– 24, 2012 Jacksonville, Fl USA Definitions from Jeff Estefan Paper A process is a logical sequence of tasks performed to achieve a particular objective. A process defines the “WHAT” is to be done, without specifying the “HOW” each task is to be performed. A method consists of techniques for performing a task, the “HOW” of each task. The terms “method,” “technique,” practice,” and “procedure” can be used interchangeably in this context. A tool is an instrument that, when applied to a particular method, can enhance the efficiency of a task. Thus, methods help bridge the gap between process and tools. The purpose of the tool should be to facilitate the accomplishment of the “HOWs.” A methodology can be defined as a collection of related processes, methods, and tools.

International Workshop Jan 21– 24, 2012 Jacksonville, Fl USA List of MBSE Methodologies

International Workshop Jan 21– 24, 2012 Jacksonville, Fl USA

International Workshop Jan 21– 24, 2012 Jacksonville, Fl USA Metrics - ROI Lack of ROI Information –MBSE Barrier to Change –Understand Risk and Benefits of change –Understand Cost of change and ROI Metrics Information few and far between –Sensitive or Proprietary –Simply not collected or published –“Apples to Apples” comparison difficult to find

International Workshop Jan 21– 24, 2012 Jacksonville, Fl USA Metrics - ROI Goal – To provide a survey of industry papers/references that: –Justified a transition to MBSE –Highlight some lessons learned Survey to date includes; –15 references collected –Includes both Anecdotal and Quantitative Data –Some are Software focus

International Workshop Jan 21– 24, 2012 Jacksonville, Fl USA MBSE Metric Papers

International Workshop Jan 21– 24, 2012 Jacksonville, Fl USA MBE Metric Papers - Sample

International Workshop Jan 21– 24, 2012 Jacksonville, Fl USA Collecting Model Metrics To support Program and Engineering Management –To measure progress –To measure quality –To measure complexity –To measure Cost –To support day to day model maintenance Collect, Track and Trend

International Workshop Jan 21– 24, 2012 Jacksonville, Fl USA Collecting Model Metrics How does an System Architectural Model Contribute? –Contains the most current behavior, structure, requirements and parametric model elements –Provides objective evidence of Architecture and Design Artifacts Not just subjective data from human driven assessments –Provides an environment for “Continuous Assessment” Not just at the design maturity gates

International Workshop Jan 21– 24, 2012 Jacksonville, Fl USA Methods and Metrics - Going Forward Create a Metrics How To Guidance Section –Practical Systems and Software Measurement (PSM) Website –INCOSE Material Sys Eng Measurement Primer Metrics Guidebook SE Leading Indicators Guide Technical Measurement

International Workshop Jan 21– 24, 2012 Jacksonville, Fl USA Methods and Metrics - Going Forward Need your help –Know of any Methodologies that should be posted? –Know of any metrics references/papers/links worth sharing? If so, please contact me

International Workshop Jan 21– 24, 2012 Jacksonville, Fl USA Thank You