Management Items – (John) EC comments on TDR snapshot (Brian) Editing status reports (Editors) Other items, wrap-up 1 TEB webex meeting, 6 Aug 2012 Global.

Slides:



Advertisements
Similar presentations
1 Online Discharge Summary Tutorial Sign Discharge Summaries & Addendums On the Web Table of Contents Introduction Access Documents Needing Signature Edit.
Advertisements

July 2010 D2.1 Upgrading strategy Javier Soto Catalog Release 3. Communities.
Nick Walker Marc Ross Akira Yamamoto GDE PAC Prague TDR Plans and Scope.
Natural Resource Publications Management Publishing Reports in the Natural Resource Technical Report (NRTR), Natural Resource Report (NRR), and Natural.
IMS Systems Analysis and Design Communication and Documentation: Additional Notes on Written Reports.
CSE Information Systems 1 Communication and Documentation: Additional Notes on Written Reports.
CSE Information Systems 1 Communication and Documentation: Additional Notes on Written Reports.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.
Optimism R&D to be resumed! Three beam tests planned at Kek, –Hybrid target (KEKB Linac) –Liquid target (ATF Linac) –Boron-Nitride Window (KEKB) –(Starting.
© 2009 GroundWork Open Source, Inc. PROPRIETARY INFORMATION: Information contained herein is not for use or disclosure outside of GroundWork Open Source,
Proceedings and Report of the Expert Meeting: Arrangements Proceedings and Report of the Expert Meeting: Arrangements.
Chapter 1 Variables in the Web Design Environment.
Music Library Association SDC Open Meeting Feb. 18, 2005 AACR3: Summary of Part I Draft ( and a glimpse into Parts II and III) Kathy Glennan University.
J.C. Sheppard, SLAC Americas Region January 31, ILC Reference Design Report Status 2nd ILC Positron Source Collaboration Meeting IHEP, Beijing,
1 Developing a Departmental Style Guide by Jean Hollis Weber Presented by Elliot Jones.
John Carwardine 1 TDR Editorial WG Summary Global Design Effort John Carwardine.
Controls & LLRF ILC Controls Telecon September 20, 2006 John Carwardine 1.Reports from ESRF Meetings 2.Misc. Items 3.Participant “Radar” Items.
April 1, 2007 Global Design Effort 1 Materials for S4 meeting Discussion of risks in BDS WP April 1, 2007.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
ATF-II Review by GDE Marc Ross, (SLAC) For GDE Project Managers: Nick Walker and Akira Yamamoto 24 January, th ATF2 Collaboration Meeting.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
John Carwardine 22 June 2012 TEB webex meeting. Agenda Management items (John) –General updates, status of submissions –Principle Editor assignments for.
Chair’s report (John) Editor status reports (editors) Special section on XFEL (Nick) AOB (all) 1 TEB Meeting 15 June 2012 Global Design Effort John Carwardine.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
FACILITIES PLANNING ISE310L SESSION 17 Facilities, October 20, 2015 Geza P. Bottlik Page 1 OUTLINE Questions? Any supply chain or facilities stories or.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
On S1Global Writeup S1G Writeup Meeting Nobu Toge 1.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
Editing Status of Accelerator Systems R&D, CesrTA, ATF2 as of Sep.10 K. Yokoya.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
John Carwardine Editing updates, pdf build for top-level editing LCWS session on TDR 1 TEB Webex: 8 th October Global Design Effort John Carwardine.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
TDR end game. Timeline constraints We need to use the current momentum to conclude the TDR work Needed by all funding agencies to support funding requests.
TDR Technical Editorial Board Webex meeting, 16 th Dec 2011 Report from the Chair (John) Technical Editing reports (Benno, Maura) Review of TDR Outlines.
CCS Information and Support Center Introduction. What is the information center for? Not only does our web-based.
19Jul06 Vancouver GDE meeting 1 S2 Task Force Status (String test definition) Tom Himel.
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
FACILITIES PLANNING ISE310L SESSION 16 Chapter 14 – Garcia 4, March 9, 2016 Geza P. Bottlik Page 1 OUTLINE Questions? Quiz Stories or experiences? Go over.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
Baseline Technical Review – Central Region Accelerator Systems
ILC TDR Guidelines for Authors
Agenda items TEB activities at KILC TDR SVN repository roll-out
SCRF WebEx Monthly Meeting Agenda and Reports from PM
Waste Confidence/Continued Storage – Status Update
Preparation for DESY Meeting
ILC TDR SVN repository roll-out
Oct 22 Group Leaders Planning meeting
Mark Palmer for the CESRTA Collaboration
SCRF Monthly WebEx Meeting Sept. 22, 2010
GSICS Quarterly Special Issues and Editors
Online Performance Evaluation Tool
Yamamoto WG3: ML-SCRF Parallel Session,
Technical Design Report preparation
Accelerator Physics Technical System Group Review
Online Performance Evaluation Tool
Developer Community General entry point into Developer Network for all SAG products.
Barry Barish Paris ICHEP 24-July-10
Preparation for AWLC2017 Benno List, DESY TCMB Meeting
GRANT APPLICATION INSTRUCTIONS
Texts.
ILC - Global Design Effort
EC LMSC Policy and Procedures Update
WordPress Unit Web Coordinators
Presentation transcript:

Management Items – (John) EC comments on TDR snapshot (Brian) Editing status reports (Editors) Other items, wrap-up 1 TEB webex meeting, 6 Aug 2012 Global Design Effort John Carwardine LCWS starts 11 weeks from today

Status updates On Friday, Vic sent the ‘final’ version of TDR2/CFS chapter –Phil can start the editing again Eckhard has circulated for comments his proposed edits to SCRF R&D chapter (download from Forge links page) –I have rearranged text between sections when there where repetitions. I have also tried to streamline the text in some places, even omitted figures. Probably there is not enough of that yet, since the text is too long. I have also left a few coloured comments that have to be dealt with… Obviously the work is not finished yet. I will continue with the remaining sections and then start over again. –If you have comments, please send to Eckhard and Akira John Carwardine: TEB Webex meeting, 23 July

Questions of scope TDR1 / Beam Test facilities – now mixed content –Splits into two facets: Ring tests; Linac tests –NML section no longer refers to beam-tests –S1-Global is in SCRF chapter –Quantum Beam section -> Expand to cover STF2 Commissioning, Operations, Availability –Decision on how to handle this is with Marc Global Technical Systems –Control System Pulled from RDR –Instrumentation, magnets/ps, dumps,.. Probably not necessary (covered in AS chapters) John Carwardine: TEB Webex meeting, 23 July

Maura is making pdfs for all the chapters in TeX and for those in Word that have been through first round editing –Download from the usual Links page Please simply read through the text from the beginning if you have no specific sections in your queue for editing –Send general comments to We need to prioritise the figures that need fixing. Editors: please review the figures in the image browser directories and identify which will/won’t be in the chapter. A Tables browser is now online, linked from forge portal John Carwardine: TEB Webex meeting, 23 July

Schedule of Editorial topics 6 Aug: Feedback from EC on TDR snapshot (Brian) 13 Aug: –TDR2 CFS revisited (Phil) –Technical editing scope of work (Maura, Benno) 20 Aug: –TDR2 ML-Tech, ML-Flat, ML-Mountain (Akira) 27 Aug: In the queue –TDR1 Beam Test Facilities: FLASH, Quantum Beam, NML –TDR1 Accelerator R&D + CesrTA + ATF –TDR1 Post-TDR R&D, TDR2 Post-TDR Eng, TDR2 Upgrade –TDR1 and TDR2 Introductions and Summaries –Top-level look at TDR1 and TDR2 –TDR/DBD, TDR/Companion Document John Carwardine: TEB webex meeting, 23 July

EC Reviewers by chapter (13-July) John Carwardine Global Design Effort 6