Helical Undulator Programme J Rochford T Bradshaw On behalf of the HeLiCal collaboration.

Slides:



Advertisements
Similar presentations
I.R. Bailey, J.B. Dainton, L.J. Jenner, L.I. Malysheva (University of Liverpool / Cockcroft Institute)
Advertisements

A Study of Mechanical and Magnetic Issues for a Prototype Positron Source Target The positron source for the International Linear Collider (ILC) comprises.
I.R. Bailey, J.B. Dainton, L.J. Jenner, L.I. Malysheva (University of Liverpool / Cockcroft Institute)
Q1 for JLAB’s 12 Gev/c Super High Momentum Spectrometer S.R. Lassiter, P.B. Brindza, M. J. Fowler, S.R. Milward, P. Penfold, R. Locke Q1 SHMS HMS Q2 Q3.
Mike Jenkins and Ian Bailey. Positron Requirements of a New Collider CLIC SLCILC LHeC 6.0x10 12 e + /s 3.9x10 14 e + /s 4.0x10 16 e + /s 1.1x10 14 e +
Simulations with ‘Realistic’ Photon Spectra Mike Jenkins Lancaster University and The Cockcroft Institute.
STFC Technology Helical Undulator Status and 2009 Progress Dr Owen Taylor On behalf of the Helical collaboration Collaboration members ASTEC: J.A. Clarke,
STFC Technology undulator manufacture and measurement James Rochford On behalf of the Helical collaboration Nov 2008.
ILC prototype undulator project ILC positron source meeting 31 st Jan – 2 rd feb Beijing James Rochford For the HeLiCal Collaboration.
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
Undulator R & D Jim Clarke STFC Daresbury Laboratory, UK BAW-2 SLAC Jan 2011.
Status of the UK Superconducting Undulator Studies Jim Clarke ASTeC, STFC Daresbury Laboratory FLS 2012, March 2012.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
MUTAC Review, 9 April MuCOOL and MICE Coupling Magnet Status Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
Magnet quench during a training run Magnet electrical circuit schematic PROGRESS ON THE MODELING AND MODIFICATION OF THE MICE SUPERCONDUCTING SPECTROMETER.
31st May 2007LCWS1 Robust Spin Polarisation Status Helical Collaboration I.R. Bailey, P. Cooke, J.B. Dainton, L.J. Jenner, L.I. Malysheva (University of.
IR Magnets for SuperKEKB KEK, Norihito Ohuchi 1.IR Magnets (ES, QCS, QC1) 2.Interference between Magnet-Cryostats and Belle 3.Summary SuperB.WS05.Hawaii.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
1 Quench study Yury Ivanyushenkov, Elwyn Baynham, Tom Bradshaw, Amanda Brummitt, Steve Carr, Andrew Lintern, James Rochford STFC Technology RAL HeLiCal.
1 MICE Mtg Oct 2002 Elwyn Baynham RAL Focussing Absorber Magnet Elwyn Baynham ; Tom Bradshaw Iouri Ivaniouchenkov ; Jim Rochford Applied Science Division.
1 Update on Focus Coil Design and Configuration M. A. Green, G. Barr, W. Lau, R. S. Senanayake, and S. Q. Yang University of Oxford Department of Physics.
Accelerator Science and Technology Centre Abstract The baseline design of the positron source for the International Linear Collider (ILC)
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
1 The Genoa Tracker Solenoids and their Contribution toward a New Design Michael A. Green Lawrence Berkeley National Laboratory and Pasquale Fabbricatore.
Status of the HELICAL contribution to the polarised positron source for the International Linear Collider The positron source for the International Linear.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Status of Undulator-based Positron Source Baseline Design Leo Jenner, but based largely on a talk given by Jim Clarke to Positron DESY-Zeuthen,
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
Superconducting Large Bore Sextupole for ILC
BNG Industrial experience on Superconducting Undulators C. Boffo, T. Gehrard, B. Schraut, J. Steinmann, W. Walter, Babcock Noell GmbH T. Baumbach, S. Casalbuoni,
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Status of CEPC Detector magnet
STFC Technology undulator manufacture and measurement James Rochford On behalf of the Helical collaboration.
Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Dr Owen Taylor Institutes Science and Technology Facilities Council (STFC) UK –Daresbury.
12th April 2007Cockcroft Institute1 WP2.3 - Robust Spin Polarisation Status Helical Collaboration I.R. Bailey, P. Cooke, J.B. Dainton, L.J. Jenner, L.I.
EUROTeV WP4 Report Polarised Positron Source Jim Clarke, on behalf of the WP4 team DESY Zeuthen STFC (Daresbury and RAL) University of Durham University.
1 WANG,Li/SINAP WANG Li, WANG ShuHua, LIU YiYong, SUN Sen, HU Xiao, YIN LiXin Shanghai Institute of Applied Physics, CAS, Shanghai , China Shanghai.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Ian Bailey University of Liverpool / Cockcroft Institute UK Target Update EUROTeV: WP4 (polarised positron source) PTCD task I. Bailey, J. Dainton, L.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012.
Helical Undulator Status Jim Clarke ASTeC, STFC Daresbury Laboratory.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Task 6: Short Period Nb3Sn Superconducting Helical Undulator George Ellwood
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova The air core magnets.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
LC-ABD WP2.3 (robust spin polarisation) and WP5.1 (helical undulator) form the heLiCal collaboration. Ian Bailey on behalf of the Helical Collaboration.
LC-ABD: WP2.3 (robust spin polarisation) and WP5.1 (helical undulator). Helical Collaboration I.R. Bailey, P. Cooke, J.B. Dainton, L.J. Jenner, L.I. Malysheva.
FNAL Workshop, July 19, 2007 ILC Main Linac Superconducting Quadrupole V.Kashikhin 1 ILC Main Linac Superconducting Quadrupole (ILC HGQ1) V. Kashikhin.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Yingshun Zhu Design of Small Aperture Quadrupole Magnet for HEPS-TF
HTS and LTS Magnet Design and Prototyping for RAON
Photon Collimator and Conversion Target Status I. Bailey University of Liverpool / Cockcroft Institiute Cockcroft Institiute.
Status of the PANDA Solenoid Magnet Production in BINP
Depolarisation Effects at the ILC Damping Ring
A model superconducting helical undulators wound of wind and react MgB2 and Nb3Sn multifilamentary wires Center for Superconducting & Magnetic Materials.
Status of the CLIC DR wiggler design and production at BINP
Yury Ivanyushenkov for the UK heLiCal Collaboration
AEGIS Magnet System.
Task 6: Short period helical superconducting undulator
Task 6: Short Period Nb3Sn Superconducting Helical Undulator
Small Coolers for MICE MICE Collaboration Meeting RAL Michael A. Green
CLIC Undulator Option for Polarised Positrons
Yingshun Zhu Accelerator Center, Magnet Group
BESIII Collaboration Meeting, June 5~6, 2002, Zian Zhu
Helical Undulator Insertion Device The heLiCal collaboration
as a prototype for Super c-tau factory
Presentation transcript:

Helical Undulator Programme J Rochford T Bradshaw On behalf of the HeLiCal collaboration

Helical Collaboration RAL: E. Baynham, T. Bradshaw, J. Rochford (Y Ivanyushenkov – departed) Project Engineering - A Brummit, G Burton, C Dabinett S. Carr, A Lintern ASTEC: J.A. Clarke, O.B. Malyshev, D.J. Scott, B. Todd, N Ryder, (A Birch – departed) University of Liverpool : I.R. Bailey, J.B. Dainton, P. Cooke, T. Greenshaw, L. Malysheva DESY : D.P. Barber University of Durham : G.A. Moortgat-Pick

Collaboration Astec Impedance calculations Wakefield heating Vacuum considerations Specification (plus Liverpool and Durham RAL Cryogenics and Project Engineering Magnetic modelling Prototyping Mechanical design Manufacture Joint work Test programme Data analysis

Talk Requirements - specification Feasibility – what are we able to make ? Design drivers Modelling and Prototypes Module design Testing Assembly of 4m module

Requirements ILC requirement : To produce a circularly polarised positron beam High energy electron beam through helical undulator produces polarised photons. These hit a target which produces a polarised positron beam.

Requirements Electron energy: 150GeV First harmonic photon energy: 10MeV Shorter period – fewer magnets and shorter undulator – undulator could be m length Shorter period – manufacturing difficulties Need to maintain an adequate margin on the superconductor We needed to assess what could be achieved..

Magnet modelling Aim of the modelling was to assess parameters like Conductor aspect ratio Bore diameter Pitch Conductor working margin Would Iron help Mesh distribution in 3d iron model High density mesh-coil regions Air in bore Iron Conclusions of modelling If NbTi was used 3d iron model-to achieve the required field Iron former and poles were necessary Realistically a minimum11.5mm was achievable With a winding bore of ~6mm Operating at 80% short sample Peak field in an Air only model

R&D Prototypes Short prototypes manufactured to assess manufacturing methods

R&D Prototypes ParameterPrototype 1Prototype 2Prototype 3Prototype 4Prototype 5Prototype 5’ Prototype goal Winding technique verification Check effect of mechanical tolerances Prototype with reduced period Check effect of ironPrototype with the final period Quench study with improved impregnation Length 300 mm 500 mm Former material Aluminium Iron Winding period 14 mm 12 mm 11.5 mm Winding bore 6 mm 6.35 mm Magnet bore 4 mm 4.5 mm5.23 mm Superconducting wire Cu:SC 1.35:1 Cu:SC 1.35:1 Cu:SC 1.35:1 Cu:SC 1.35:1 Cu:SC 0.9:1 Cu:SC 0.9:1 Winding 8-wire ribbon, 8 layers 9-wire ribbon, 8 layers 7-wire ribbon, 8 layers

Specification Following a pretty extensive R&D programme and modelling study the following specification was developed : Electron Drive Beam Energy150 GeV Photon Energy (1st harmonic cutoff) MeV Photon Beam Power131 kW Undulator Period11.5 mm Undulator Strength0.92 Field on Axis0.86 T Beam Aperture5.85 mm Undulator Length147 m This specification defines the shortest period undulator we could reliably build as a prototype.

Design 4m module With the magnets defined, the design of a stand alone prototype section for the ILC was started. The goal was to have 2 x 2m undulator sections in each module Period 11.5mm Field 0.86 T Copper bore tube Simplified View of 4m Module

2m magnet sections Undulator Period11.5 mm Undulator Strength0.92 Field on Axis0.86 T Beam Aperture5.85 mm Undulator Length147 m Coil winding

2m magnet sections Following winding each coil is potted And end connections

Iron yoke R&D and modelling has shown that it is not possible to deliver a realistic operating margin without the addition of iron poles 40% of the field generated by the iron poles Similarly by including a return yoke adds ~ 10% to the margin

2m magnet testing Undulator in the test cryostat The 2m sections were tested in a large modified cryostat

Test Programme Field maps along the length of the undulator Mapping Br along the axis At 4 points around the azimuth; 0, 90, 180 & 270 degrees At magnet ends (200mm along Z) carried out more detailed maps at 45 O intervals around the azimuth All readings were repeated at least twice with different hall probes to check repeatability of the logging system Also carried out a Quench data study

Fourier Analysis Plot on a semi-logarithmic scale – sinewave is very pure Results are repeatable 7 th Februrary14 th Februrary Conclusion good undulator with a pitch of – mm !

Trajectories Corrected x and y data The particle trajectories were calculated from the measured fields in SPECTRA Corrections made for the Hall probe offsets Trajectories are well within expectations ! Colours refer to different probe orientations

Quench Data Quench Data for both Magnets Both magnets can deliver nominal field with a healthy margin!

4m Module 4 meter module assembly Magnet cold mass alignment radshieldTurret assembly

4m Module 4m module assembly All leak tests of vacuum and helium vessels were good However have problems with a current lead short Also had problems with the cryo cooler The 4m module was closed 2 weeks ago ! Sumitomo engineer has just visited on Tuesday Switched over the cold head Cooler is now running and the magnet is cooling

4m Module 4m module testing Currently we are well into the first cool down ! The 2nd stage of the cooler is at 6K The 1st stage of the cooler is at ~80K The magnets are at K Pressure in the helium vessel is ~1b Liquid He delivery on Friday ready to fill magnet Proposed tests once cold Initial tests check of logging-instrumentation Electrical checks on solenoid Functional test of cryocooler Magnet test Power magnet 1, check C-leads. Power magnet 2, check C-leads. Power both magnets Longer term stability Run both magnets 24 hrs – check stability Run both magnets several days, logging system

Current Status Magnet sections Both 2m sections have been manufactured and tested at 4K Both magnets exhibited some training but both have met the field requirement Vacuum Vessel and Helium Bath The 2m sections have been incorporated into the vacuum vessel. The vessel is complete and is now being tested. Currently the magnet is under vacuum and we have begun testing. Currently finalising the configuration of the instrumentation system. After some initial problems we are making good progress with the initial cool down

END