ELENA Integration F. Butin / ELENA collaboration.

Slides:



Advertisements
Similar presentations
Status of the Tagger Hall Background Simulation Simulation A. Somov, Jefferson Lab Hall-D Collaboration Meeting, University of Regina September
Advertisements

Mark Rayner, Analysis workshop 4 September ‘08: Use of TOFs for Beam measurement & RF phasing, slide 1 Use of TOFs for Beam measurement & RF phasing Analysis.
02/06/20141 WHAT ITEM IS COMPOSED OF ? INTEGRATION MODEL DETAIL MODEL SKELETON 3D ENVELOP PART 1 PART 2 PART XXX… EQUIPMENT ITEM INTEGRATION OFFICE RESPONSIBILITY.
Electron Cooling Expected Performance & Construction.
BINP for FAIR Yu.Shatunov Moscow May Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Linac 4 PSB BI LTB LT L4T m from PIMS to foil: m new line (to BHZ20) m present Linac2 line Active elements : 4+2bendings; quads,
Review of CIEMAT contributions to linear accelerators L. García-Tabarés, F. ToralCIEMAT, 7/9/2006.
MICE Integration Engineering Jason Tarrant - STFC l Contents »South Mezzanine change summary »Integration Envelope Model »A/C Move »Maus Geometry »AFC.
AD status in 2012, foreseen consolidations at AD ADUC 20/11/2012T. Eriksson CERN BE/OP.
ELENA LAYOUT MACHINE status. Stephane Maridor/ ELENA collaboration ELENA – LAYOUT machine WHO WE ARE ? HOW IT WORKS ? STATUS of ELENA LAYOUT MACHINE ACCESS.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
IEFC 22 March 2011T. Eriksson CERN BE/OP How to ensure a bright future of the AD.
ELENA Vacuum System R. Kersevan, TE-VSC-IVM R. Kersevan, “ELENA Vacuum System”, - ELENA Project Review, Oct14-15, 2013, CERN.
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
Preliminary calculations for the vacuum system of ELENA R. Kersevan TE/VSC-IVM – 21/6/2012 The vacuum sectors, the position of vacuum pumps, flanges, and.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
Status and Prospects for the AD and ELENA
AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.
ELENA Project GBAR Experimental area L ayout / time scales / questions F. Butin / ELENA collaboration.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
Status of the ELENA transfer lines with special consideration of vacuum, hand-over optics and beam time distribution after 2017 W. Bartmann, D. Barna,
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
ELENA Hardware Baseline Current Document Status T. Birtwistle EN-MEF-DC.
AD/ELENA (B193) Integration and constraints F. BUTIN / ELENA collaboration.
Vacuum chamber fabrication Dates refer to end of fabrication, then 8 weeks are to be added for NEG coating, bake-out, acceptance tests, etc. EN-MME LNR.
Lau Gatignon. The open session of this meeting was fully dedicated to the AD program with 6 presentations by AEGIS, ACE, GBAR, ASACUSA, ATRAP and ALPHA.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
PSB-PS TRANSFER AT 2 GEV - CONCEPTS AND OPTICS W. Bartmann, J. Abelleira et al. ABT LIU Review, 20-Nov-15.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
L. Sermeus TE-ABT-FPSELENA IIC meeting 3 th April Review of ELENA Injection kicker Luc Sermeus on behalf of WP 2.8 (with informations from EN-MME)
ELENA Layout Naming Convention F. Butin / ELENA collaboration.
Linac4 BCC 14/10/2010 Linac4 Measurement and Dump Lines BCC on the Linac4 Transfer Line Status.
XML Description of Beam Pipe Geometry  For XML description of Beam Pipe were used: Det/XmlDDDB/v6, Det/XmlEditor/v4, Det/DetDesk/v8, Vis/GaudiLab/head.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Steering committee ELENA Project Structure S. Maury, project leader C. Carli, deputy project leader Beam physics and Performance Committee (G. Tranquille,
LIU and TE/VSC activities LIU-SPS aC coating & flange impedance reduction Paul Cruikshank LIU & TE/VSC activities, 23/6/2016 Paul Cruikshank.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
The Evolving ILC Project
Oleksiy Dolinskyy December 1st, 2014
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
ELENA – Vacuum chambers and vacuum activities
ELENA installation and commissioning status
EXTENSION ELENA = BUILDING 193 Status of integration
Energy deposition studies on magnets. Aim. First applications
Installations up to Start of Commissioning
AD consolidation activities in LS2
Configuration Management and Layout Database ELENA Project
ELENA Beam Transfer Workpackage
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
The ELENA Safety Documentation «time to prepare the safety clearance»
Diffuser status October 2017
ELENA Technical Coordination
Yamamoto WG3: ML-SCRF Parallel Session,
Update on the PSB Transfer Lines
Impedance working group update
Status of the VEPP-2000 Collider Project at Novosibirsk
Advanced Research Electron Accelerator Laboratory
Experimental Areas – LS2 planning
Two-beam Test-stand Design and Construction Status
ThomX – Commissioning Meeting – 25/01/2018
JLEIC SRF update SRF team
ELENA beam commissioning
EA Renovation Project – Project Team 29 – 28 June 2019 NEWS
Presentation transcript:

ELENA Integration F. Butin / ELENA collaboration

Status of integration Position of the machine is defined Layout of the machine well defined Position of elements and envelopes known in general Layout naming convention approved (EDMS ) Layout drawings version 1 available on CDD A number of known issues:  BPM geometry not yet compatible with magnetic elements  Integration of some vacuum flanges problematic, bellows not yet implemented  A (small) number of geometric interferences F. Butin / ELENA collaboration

ELENA Machine Position The position of the machine is now defined in a released version 1, available on EDMS Next step is to go through a formal approval Then, new versions can only be requested via ECR procedure F. Butin / ELENA collaboration

General layout F. Butin / ELENA collaboration The general layout of the machine is defined in drawing ADLM___0070 released and available on EDMS The new iterations will be clearly identified by their release version number

Possible ways forward… In order to solve integration issues, we can:  Reconsider Quadrupoles envelope (340 mm)  Reconsider Scraper / RF / Schottki PU/ e - cooler envelopes  Reconsider necessity and position of bellows/flanges /valves  Re-design of BPM feedthroughs (on-going) to be compatible with quads and solenoids  Possibly integrate coorectors in dipoles… F. Butin / ELENA collaboration

RP studies Various simulations have been run so estimate the dose in normal operation and in accidental losses scenarios Some parameters must be refined in order to provide more realistic and reliable values A parameter list will be produced (action Pavel) and handed to RP in this objective F. Butin / ELENA collaboration

RP studies F. Butin / ELENA collaboration Courtesy R. Froeschl closed 3 2a 2b 1

RP studies Examples of Results of simulations Courtesy R. Froeschl F. Butin / ELENA collaboration

Integration of GBar EA F. Butin / ELENA collaboration

Integration of GBar EA F. Butin / ELENA collaboration

New annex building (393) Preparing the CfT of fabrication: docs are being approved on EDMS Integration meeting planned on 23rd Nov to better define distribution of services Access road redefined Work expected to start May-June 2013 F. Butin / ELENA collaboration

Circulation gangway Internal distribution F. Butin / ELENA collaboration

Magnetic horns test bench (10 x 7 m2) Offloading area (8x4.6 m2) Kickers 12.7 x 14.7 m2 Test bench 7 x 10 m2 Porte 6x 6 m2 Porte 2,5x 3m2 CV 6x1,5 m2 EL Workshop (5 x 10 m2) Si nk Gbar Storage (6 x 3 m2 ) BASE Storage (6 x 3 m2 ) ATRAP Storage (6 x 3 m2 ) ALPHA Storage (6 x 3 m2 ) ASACUSA Storage (6 x 3 m2 ) AEGIS Storage (6 x 3 m2 )

F. Butin / ELENA collaboration Kickers 12.7 x 14.7 m2 Test bench 7 x 10 m2 Porte 6x 6 m2 Porte 2,5x 3m2 CV 6x1,5 m2 EL m2 Storage (6 x 3 m2 ) Mezzanine Storage 10 x 12 Not in the budget…

Transfer lines integration F. Butin / ELENA collaboration Transfer lines towards existing experiments Design in progress (W. Bartman) Transfer line to Gbar is quite well advanced Integration of elements will follow O. Choisnet S. Maridor For drawings