For Private Circulation only 1 Recognition of Prior Learning ( )

Slides:



Advertisements
Similar presentations
Guidance Note on Joint Programming
Advertisements

CAEP–State Partnerships: New Agreements, New Opportunities 2013 AACTE Annual Meeting Orlando, Florida Mark Lacelle-Peterson, CAEP Senior Vice President.
Contents Introduction General Description of Tender Process Threshold Requirements Submission of Bids Evaluation Award Post-Award Actions Principles of.
© COPYRIGHT PLN9 SECURITY SERVICES PVT. LTD. ALL RIGHTS RESERVED Security Training.
Learnership Implementation Division. The skills development facilitators will serve as an extension of the regional office capacity from the view point.
Consistency of Assessment
New Standards for Training Organisations and VET Regulators Stephanie Trestrail Executive Officer TAC.
National Workshop with States Vigyan Bhawan, Delhi 9 May 2015
8-1 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Hill, Hill, Perlitz, Professional Training & Assessment, 1e C HAPTER 8 TAEASS502B Design.
OCR Teaching in the Lifelong Learning Sector Qualifications
PCTIA Accreditation WHAT YOU NEED TO KNOW BEFORE APPLYING FOR ACCREDITATION.
TVET/BCC TOT 2007 Competency Based Education and Training: Implications for Workforce Antonia Coward PhD.
© Copyright Wadhwani Foundation Principal Orientation.
QRIS Quality Improvement Grants Board of Early Education and Care March 9, 2010.
People for Performance Tour Ariane 5 Place de la Pyramide Paris La Defense Cedex 1 Strictly private and confidential Client’s Logo PROPOSAL Project.
Building Individual Professionalism in Construction Since A Valid, Reliable & Fair Direct or Indirect Measure for ACCE Construction Program Student.
Pradhan Mantri Kaushal Vikas Yojana (PMKVY)
ENGLISH LANGUAGE LABORATORY GUIDELINES FOR THE PROJECT DR. BABASAHEB AMBEDKAR OPEN UNIVERSITY.
Quality Assuring Deliverers of Education and Training for the Nuclear Sector Jo Tipa Operations Director National Skills Academy for Nuclear.
Discussion on “Udaan” A Special Industry Initiatives (SII) for Jammu & Kashmir.
1 Welfare Transition Monitoring A Detailed Look at the WT Quality Assurance Tool 2009.
VTP Name. QPs Interested in for Training About the Institute*  Corporate Information  Whether a NSDC Partner/MoRD PIA/ any other affiliation or funding.
Individual Work Plan (IWP). Objectives Describe the purpose of the Individual Work Plan (IWP) Discuss when to submit an IWP The IWP as a living document.
Aviation Ground Handling Trailblazer Assessment Activity consultation Aviation ground operative Aviation ground specialist Aviation operations manager.
TAIEX Multi-Beneficiary Workshop on Validation of Non-formal and Informal Learning Country presentation Albania Prepared by: Ejvis Gishti - NAVETQ Albina.
QCTO’s Occupational Certificates. Who is the QCTO? The Quality Council for Trades and Occupations (QCTO) is a Quality Council established in 2010 in terms.
National Skill Development Corporation.  Aim: To provide skills training for the youth.  Implementing Ministry: Ministry of Skill Development and Entrepreneurship.
LGS – HR POLICY.  OVERALL POLICY STATEMENT  The most valued assets of the Service are the people who individually and collectively contribute to the.
QUALITY ASSURANCE: OCCUPATIONAL QUALIFICATIONS DEVELOPMENT UPDATE AND WAY FORWARD (JUNE 2016)
Introduction TC Accreditation & Affiliation Process Minimum Infrastructure Requirement Grading System Job Role Specific, Compliance & Performance Standards.
County Vocational School District Partnership Grant, Cohort 3 Technical Assistance Workshop January 6, 2017.
Kick Off Meeting Largs, Scotland
Specific objective „To increase support for general education institutions to develop students’ individual competences” Measure No „Support.
  NEW JERSEY ALTERNATE ROUTE CAREER AND TECHNICAL EDUCATION CERTIFICATE OF ELIGIBILITY   EDUCATOR  PREPARATION PROGRAM (CTE-CE EPP)
BUGANDO MEDICAL CENTRE PRESENTATION ON OPRAS OVERVIEW
North Carolina Council on Developmental Disabilities
SOCIAL HOUSING REGULATORY AUTHORITY
Taught Postgraduate Program Review
FP&M SETA - OCCUPATIONAL QUALIFICATIONS DEVELOPMENT
Well Trained International
PRESENTATION TO CHIETA JOINT CHAMBER INDUCTION
An Overview of Accounting in the new Junior Cycle Specification
Rationale: The program assists Micro, Small and Medium Enterprises (MSMEs) to attain higher productivity through the identification and installation of.
HEE Nursing Associate Programme
REPORTING THROUGH THE EMS
LEVELS EDUCATIONAL SOCIETY
Special Review Team Required Actions October 23, 2011
Objectives of the Training
IT Project Management Version IT Industry Apprenticeship System
Logistics Sector Skill Council
SECURITY SECTOR SKILL DEVELOPMENT COUNCIL
प्रधान मंत्री कौशल विकास योजना
Please send completed application form to:
THE OFFICE OF PROCUREMENT CONTRACT TRAINING MAY 2018
What Is Workforce Development?
Notification issued by Higher Education Department in November, 2014
Reporting 25 April 2018.
What documents make up the learning program documentation?
2018/19 ANNUAL PERFORMANCE PLAN FOR MISA
What Is Workforce Development?
Validation of Informal and Non- Formal Learning (VINFL) in Malta
Monitoring & Capacity Building Division
United Nations Voluntary Fund on Disability (UNVFD)
Stake Holders Meeting 17th Jan, 2017
Recruitment & Selection Process For Talent Acquisition
Provision of vocational and entrepreneurship development skills training to the out-of-school adolescent girls and young women from conflict affected.
Food-Skills ES/08/LLP-LdD/TOI
Agenda • Introductions • Project Objectives • Project Steps
Category Manager Assessment & Selection Orientation
Presentation transcript:

For Private Circulation only 1 Recognition of Prior Learning ( )

ABOUT PMKVY…… Launched in 2015, the objective of this Skill Certification scheme is to enable a large number of Indian youth to take up industry-relevant skill training which will help them in securing a better livelihood. ABOUT PMKVY…… Launched in 2015, the objective of this Skill Certification scheme is to enable a large number of Indian youth to take up industry-relevant skill training which will help them in securing a better livelihood. RECOGNITION OF PRIOR LEARNING Under PMKVY, special focus is given to RPL wherein the prior competencies of candidates are assessed. On successful completion of assessment, candidates will receive a Monetary Reward, Marksheet and Government certification. RECOGNITION OF PRIOR LEARNING Under PMKVY, special focus is given to RPL wherein the prior competencies of candidates are assessed. On successful completion of assessment, candidates will receive a Monetary Reward, Marksheet and Government certification. INTRODUCTION TO PMKVY

3 RPL ACHIEVEMENTS ( ) Note: Data provided is as per PMKVY Dashboard dated 02 nd September 2016 Overall Coverage Special Projects Total Enrolments Street Food Vendor – Delhi Pilot23000 Families of CRPF Personnel 72 Rashtrapati Bhavan 1500 Sectors25 Training Centers 1042 Total Enroled 1,79,530 Job Roles 174 Training Partners 220 Total Certified/Marksheet Eligible 1,15,919 Centre States/UT 23/3 Total Assessed 1,79,177 Candidates Eligible for Reward 78,699

RPL ( ) OBJECTIVES Align the competencies of the un-regulated workforce of the country to the standardized National Skills Qualification Framework (NSQF) Enhance the career/employability opportunities of an individual as well as providing alternative routes of access to further and higher education Provide opportunities for the reduction of inequalities based on privileging certain forms of knowledge over others R ecognition of P rior L earning

Through Project Mode: PROJECT TYPETARGET GROUP Examples RPL Camps RPL in a location where workers of a particular sector are consolidated (such as Industrial and Traditional Clusters) Automotive cluster of Mumbai-Pune, Garment manufacturing cluster of Tiruppur (Tamil Nadu), Footwear cluster of Agra. For Project Types RPL Camps, whereby the RPL location need not be accredited and affiliated under PMKVY for the provision of training, the PIA shall arrange the necessary training infrastructure and required laboratory/equipment at the RPL location, as per the requirements defined by respective SSC(s) for the identified job roles. PIAs shall ensure that the overall training infrastructure especially the training aids for the proposed job role are as per the industry benchmark. Employer’s Premises RPL on-site at an employer’s premises Rashtrapati Bhavan, Raj Bhavans, Various Private Sector Companies. For Project Types Employer’s Premises, whereby the RPL location need not be accredited and affiliated under PMKVY for the provision of training, the PIA shall arrange the necessary training infrastructure and required laboratory/equipment at the RPL location, as per the requirements defined by respective SSC(s) for the identified job roles. PIAs shall ensure that the overall training infrastructure especially the training aids for the proposed job role are as per the industry benchmark. A letter from the Employer to be engaged under RPL is to be submitted with the proposal. RPL CentresRPL at designated centres for geographically scattered workers who need to be mobilised Street food vendors, Hairstylist, Beauticians, Cobblers, Tailors. (PIAs shall identify Training Centres (TCs) which are accredited and affiliated under PMKVY for provision of training. )

A 5 Step Process For Candidates: STEP 1 Mobilisation Counselling & Pre-Screening Orientation STEP 2 STEP 3 STEP 4STEP 5 Final Assessment Certification & Pay-Out Step 1 - Mobilisation: 1.For Project Types 1 and 3, PIA may engage a Mobilising Agency (such as Associations/ NGOs / Training Partners) to assist in on-ground mobilisation of potential candidates to RPL Camps / RPL Centres. 2.For Project Type 2, mobilisation of employees is to be undertaken by the employer engaged. 3.PIAs need to take note of the different implementation modalities and stakeholders engaged in each project type.

A 5 Step Process For Candidates: Project Type 1 (RPL Camps) Project Type 2 (Employer’s Premises) Project Type 3 (RPL Centres) a.PIA to identify Industrial/Traditional clusters to conduct RPL b.PIA to identify job roles in which RPL can be conducted in the clusters selected c.PIA to decide the duration of the RPL Camp, based on the availability of eligible beneficiaries d.PIA to conduct RPL Camp at a prominent locality within each cluster e.PIA to mobilise potential candidates to RPL Camps. PIA may engage a Mobilising Agency (such as Associations / NGOs /Training Partners) to assist in on-ground mobilisation of potential candidates. f.The RPL Camp is to be branded according to PMKVY Branding and Communication Guidelines g.PIA to encourage presence of MPs, MLAs, DMs, SDMs, DLOs, Chief Judicial Magistrates, Municipal Commissioners and/or District Employment Officers at the RPL Camp’s inauguration a.PIA to tie up with employers b.PIA to identify job roles for which RPL may be conducted within the employer’ premises c.Employers need to mobilise their employees to participate in RPL d.Employer’s premises is to be branded according to the PMKVY Branding and Communication Guidelines a.PIA to identify job roles and geographies for conducting RPL b.PIA may engage a Mobilising Agency (such as Associations/NGOs/ Training Partners) to assist in mobilising potential candidates. c.The Mobilisation Agency is to invite potential candidates to the designated RPL Centres in the area d.The designated training centre has to be in a prominent locality and must have been accredited and affiliated under PMKVY e.The RPL Centre is to be branded according to the PMKVY Branding and Communication Guidelines

A 5 Step Process For Candidates: Step 2 - Counselling & Pre-Screening : 1.PIAs shall engage RPL facilitators (i.e. SSC approved trainers who have completed the Training of Trainers (ToT) programme, for counselling and pre-screening of candidates. 2.Potential candidates shall be counselled by RPL facilitators in the following areas: • What is PMKVY • What is RPL (explanation of the 5-step RPL process) • How will Skill Certification according to NSQF help in transforming the candidate’s life In addition, the Induction Video on RPL under PMKVY should be shown to the candidates at this stage. 3.After counselling, the RPL facilitator is to conduct a robust and thorough pre-screening of the candidates to ascertain which job role matches with their prior knowledge and experience most and to identify knowledge gaps, if any. The pre-screening process is divided into two parts: Part 1: Collection of supporting documentation and evidence from the candidate - SSCs to specify the personal information required as per the SDMS, and the supporting documentation that may be available for the job role. Part 2: Candidate self-assessment- SSCs, in partnership with the participating AA, will design a self assessment sheet for each job role. Questions are to be based on the Core NOSs of the job role. A candidate should take no longer than 15 minutes to complete this self- assessment. 4. PIAs are to evaluate the existing skill sets and experience of the candidates based on the pre-screening format set by respective SSCs for each job role. RPL Facilitators shall conduct the candidate self-assessment for each candidate on behalf of the PIA. 5.At the time of enrolment, it is mandatory for candidates to have valid Aadhaar numbers [or alternate IDs in the case of J&K and applicable North-East states] and bank accounts. If a candidate does not have an Aadhaar number and/or bank account, the PIA is required to facilitate the same prior to the candidate’s enrolment under the Scheme.

A 5 Step Process For Candidates: Step 3 - Orientation : For all project types the following orientation guidelines shall be adopted: Orientation Activities (Minimum Duration) S.NoActivityMinimum Duration 1.Domain Training (clarifying any doubts/gaps a candidate may have with respect to Job Role including the topic of Health and Safety) 6 Hours 2.Soft Skills and Entrepreneurship Tips specific to the Job Role 4 Hours 3.Familiarization with Assessment Process and Terms2 Hour 1. PIAs shall provide a job-role specific kit to the candidates. In addition to any job-role specific items, it is mandatory that all kits have the following items: a. 01 Standard PMKVY T-shirt/Jacket and b. 01 Standard PMKVY Cap 2. Details of costs in relation to Job Role Specific Kit (supported by cost calculations) shall be submitted by the PIA in the Project Proposal Template.

A 5 Step Process For Candidates: Step 4 - Final Assessment : For all project types the following assessment guidelines shall be adopted: 1.Assessments under RPL shall be conducted in a similar manner to the Short Term Training Component of PMKVY ( ) in accordance with the NSQF. The difference is in the way the results are evaluated. 2.The SSC shall earmark the NOSs of a QP (for a job role) as Core and Non-Core. 3.Marks scored in the Core NOSs of a QP will be given 70% weightage in the total score. The remaining 30% weightage will be from the Non-Core NOSs. For example: A QP has five NOSs (three Core and two Non-Core). A candidate scores 240 marks out of 300 in the three Core NOS, and 160 out of 200 in the two Non-Core NOSs. The total score of the candidate will be (240/300 x 70) + (160/200 x 30) = 80 out of Only those candidates who have valid Aadhaar numbers [or alternate IDs in the case of J&K and applicable North- East states] and a bank account shall be issued the Skill Certificate/ marksheet/payout. 5.Towards the end of final assessment, candidates are to fill up a standardised Candidate Feedback Form. The template provided in Annexure 1 is to be translated and given to the candidates in their local language. PIAs are to keep the filled Candidate Feedback Forms for a minimum of two years.

A 5 Step Process For Candidates:. NSQF LEVELPercentage required for Passing a QP 1,2,350 % 4 & above70 % Pass Percentage for a Qualification Pack (JOB ROLE) basis National Skills Qualification Framework (NSQF) 1.A candidate who achieves greater than or equal to the pass percentage mentioned in the above table for a QP, shall be awarded the Skill Certificate, Marksheet and Payout (INR 500). Certified candidates will receive a Grade (A/B/C) on their Skill Certificates. 2.A candidate who achieves less than the pass percentage mentioned for a QP, but at least 30% or above of the total score, shall receive only the marksheet and payout (INR 500). 3.A candidate who scores less than 30% of the total score, shall receive only the marksheet and be encouraged to undergo Short Term Training under PMKVY 2. GradeScore Range NSQF Levels 1,2 and 3 A85% and above B> 70% to < 85% C50% to 70% NSQF Levels 4 and above A85% and above B70% to < 85% Grades Provided on Skill Certificate: Step 5 - Assessment & Graded Certification

A 5 Step Process For Candidates:. 1. PIAs shall conduct a Certificate and Marksheet Distribution Ceremony for Candidates. PIA to ensure the presence of each candidate. Candidates to wear the standard PMKVY T-shirt/Jacket for the Certification & Marksheet Distribution Ceremony. 2. High resolution pictures and videography are to be taken of the Certificate and Marksheet Distribution Ceremony including batch-wise photos of candidates. PIAs are to upload images and videos on a portal designated by NSDC. Step 5 – Certificate Distribution

Pay-Outs: For Project Type RPL Camp:. Tranches % of Total Cost Per CandidateOutput Parameters 130%On Enrolment of a Candidate 250%On Successful Certification of a Candidate 320% On Successful Submission of Evidence Based Proofs of Certificate Distribution Ceremony: 1. Batch-wise Photos of Candidates with Certificates 2. Video of Certificate Distribution Ceremony 1.SSC Assessment Fee : Upon validation and approval of final assessment results on SDMS, SSCs shall be paid the following assessment fees directly 2.If the bank reconciliation report indicates failed transactions of the amount paid-out to candidates (INR 500 each), the corresponding amount (INR 1700 or INR 1400) shall be adjusted in the last payout to the PIA for the project. Post project completion, any undue payment shall be recovered from the PIA. 3.Bridge Course not applicable for Project Type 1. S. No. Payout Heads Manufacturing (Rs.) Services (Rs.) 1 Payout to PIA (Variable) a. Mobilisation (maximum Rs. 500) b. Orientation c. Job Role Kit (minimum Rs. 200 and maximum Rs. 500) d. Branding & Publicity (maximum Rs. 250) 1700 (Ceiling Cost) 1700 (Ceiling Cost) 2 Payout to SSC (Fixed) Assessment Fee Payout to Candidate (Fixed) Candidate overall score must be 30% and above 500 TOTAL BASE CEILING COST

Pay-Outs: For Project Employer’s Premises:. Tranches % of Total Cost Per CandidateOutput Parameters 130%On Enrolment of a Candidate 250%On Successful Certification of a Candidate 320% On Successful Submission of Evidence Based Proofs of Certificate Distribution Ceremony: 1. Batch-wise Photos of Candidates with Certificates 2. Video of Certificate Distribution Ceremony 1.SSC Assessment Fee : Upon validation and approval of final assessment results on SDMS, SSCs shall be paid the following assessment fees directly 2.If the bank reconciliation report indicates failed transactions of the amount paid-out to candidates (INR 500 each), the corresponding amount (INR 1700 or INR 1400) shall be adjusted in the last payout to the PIA for the project. Post project completion, any undue payment shall be recovered from the PIA. 3.Bridge course applicable for Project Type 2. For projects approved to conduct Bridge Courses beyond the mandatory 12 hours of orientation, the additional payout per candidate will be as per the Common Norms. S. No. Payout Heads Manufacturing (Rs.) Services (Rs.) 1 Payout to PIA (Variable) a. Orientation b. Job Role Kit (minimum Rs. 200 and maximum Rs. 500) c. Branding & Publicity (maximum Rs. 250) 1400 (Ceiling Cost) 1400 (Ceiling Cost) 2 Payout to SSC (Fixed) Assessment Fee Payout to Candidate (Fixed) Candidate overall score must be 30% and above 500 TOTAL BASE CEILING COST

Pay-Outs: For Project RPL Centre:. Tranches % of Total Cost Per CandidateOutput Parameters 130%On Enrolment of a Candidate 250%On Successful Certification of a Candidate 320% On Successful Submission of Evidence Based Proofs of Certificate Distribution Ceremony: 1. Batch-wise Photos of Candidates with Certificates 2. Video of Certificate Distribution Ceremony 1.SSC Assessment Fee : Upon validation and approval of final assessment results on SDMS, SSCs shall be paid the following assessment fees directly 2.If the bank reconciliation report indicates failed transactions of the amount paid-out to candidates (INR 500 each), the corresponding amount (INR 1700 or INR 1400) shall be adjusted in the last payout to the PIA for the project. Post project completion, any undue payment shall be recovered from the PIA. 3.Bridge course applicable for Project Type 2. For projects approved to conduct Bridge Courses beyond the mandatory 12 hours of orientation, the additional payout per candidate will be as per the Common Norms. S. No. Payout Heads Manufacturing (Rs.) Services (Rs.) 1 Payout to PIA (Variable) a. Mobilisation (maximum Rs. 500) b. Orientation c. Job Role Kit (minimum Rs. 200 and maximum Rs. 500) d. Branding & Publicity (maximum Rs. 250) 1600 (Ceiling Cost) 1600 (Ceiling Cost) 2 Payout to SSC (Fixed) Assessment Fee Payout to Candidate (Fixed) Candidate overall score must be 30% and above 500 TOTAL BASE CEILING COST

Bridge Course Option:. Where appropriate, PIA’s may propose Bridge Courses be imparted to candidates for Project Type 2 and 3 only. 1.Over and above the mandatory 12 hours of Orientation (see Section ), a PIA may propose a bridge course of not more than 68 hours to be imparted to candidates for Project Types 2 and 3 only. 2.The proposed bridge course must be based on both Core NOSs & Non-Core Nos of the job role. PIAs may undertake the Bridge Course, subject to the approval of the Project Approval Committee. PIA shall provide a clear justification in the proposal template for requirement of Bridge Course, if any. 3. If approved, payout to PIA for Bridge Course shall be in accordance with the Common Norms (refer to Annexure 3). The same shall be over and above the total payout to PIA per candidate, as specified for different type RPL projects. 4.All Bridge Courses under RPL are to be supported by Aadhaar Enabled Biometric Attendance System (AEBAS). PIAs have to ensure the availability and functioning of AEBAS at all RPL locations offering a Bridge Course under RPL

Monitoring Framework:. 1.RPL shall come under the purview of the Monitoring Framework of PMKVY. Approved projects shall be evaluated mid-way after their official start date. The review date will be specified at the time of the project approval. 2. Bridge Course : a. All Bridge Courses under RPL are to be supported by Aadhaar Enabled Biometric Attendance System (AEBAS). b. PIAs have to ensure the availability and functioning of AEBAS at all RPL locations offering a Bridge Course under RPL 3. The project shall also be evaluated through field visits by the NSDC or a designated agency on the following parameters: • Branding and appropriateness of the RPL venue • Publicity of the project • Mobilisation process • Counselling and Pre-screening process • Orientation process • Assessment process • Achievements on target utilization and adherence to prescribed timelines • Other parameters in sanctioned project proposal 4. Based on the project review, NSDC shall propose to the Project Approval Committee if the targets allocated should be adjusted. 5. PIAs also need to send to NSDC video clippings and clear photographs showing candidates undergoing their final assessment. 6. Upon certification, PIAs shall post on their respective websites the list of certified candidates (job role-wise and grade-wise).

Proposal Review :. 1.Upon submission, a document compliance check will be conducted. 2.If mandatory documents are in place, the proposal shall be evaluated & scored against the following parameters by the PMKVY Screening Committee chaired by NSDC, Chief Operating Officer: If PIA has conducted RPL under PMKVY ( ), in addition to the abovementioned parameters, it shall be evaluated against its past performance as a PIA. 3. If a proposal scores 70% and above in the overall score, the proposal will be taken up for approval to the Executive Committee, chaired by MSDE, Joint Secretary. The PIA shall be in attendance when its proposal is evaluated by the PMKVY Executive Committee. 4.Projects successfully approved by the PMKVY Executive Committee, shall be allocated targets for implementation of the project. The PMKVY Executive Committee may adjust the targets proposed by the PIA based on the evaluation of the project proposal. 5. The PMKVY Executive Committee may undertake alterations in targets allocated upon periodic reviews and evaluation of the project performance in accordance to the monitoring framework S. No.ParameterWeightage in overall score (in %) 1Organisational Strength of Participating Stakeholders50 2Mobilisation Strategy (Project Types 1&3) / Industry Tie-Up (Project Type 2) 5 3Robustness of Orientation Content & Pre-Screening Format15 4Monitoring Mechanisms20 5Branding & Publicity10

Project Financials by PIA :. S. noCost Head Maximum permissible amount (in Rs.) Amount (in Rs.)Remarks, if any 1PIA payout per candidate (Variable Cost) 1,400 a.Orientation expenses b.Branding and publicity expenses (maximum Rs. 250) c. Job role-specific kit expenses (minimum Rs. 200 and maximum Rs. 500) 01 PMKVY Standard T-shirt/ Jacket 01 PMKVY Standard Cap Other additional items (please add more rows, if required) 2Assessment payout per candidate (Fixed Cost) 800 (Manufacturing) 600 (Services) 3.Candidate payout (Fixed Cost) Bridge course expenses As per common norms 4.1Job role 1 (category_____) 4.2Job role 2 (category_____) 4.3Job role 3 (category_____) 5.Total cost per candidate 2,700 (Manufacturing) + Bridge course expenses 2,500 (Services) + Bridge course expenses Job role 1 Job role 2 Job role 3 6.Total cost for entire project (No. of RPL candidates* Cost per candidate) Example is given below. But it’s different for all Project Type.

SSC Approval letter Where PIA is not a Sector Skill Council (SSC), applicant is required to submit a SSC approval letter. Approval letter is to be SSC letterhead and signed by SSC CEO. Template: Annexure 5.10 SSC Approval Letter To Date: Subject: Approval of PMKVY RPL Project Proposal proposed by Sir/ Ma’am, We have gone through the RPL Project Proposal submitted by and find it suitable to undertake RPL of persons for the following job roles: 1. Specify Job Role 1 2. Specify Job Role 2 We have supported this proposal through the following means: 1. Provision of the pre-screening format for the aforementioned job roles 2. Validation of the orientation content (and Bridge course, if proposed) To ensure the effective implementation/ completion of this project, we shall undertake the following: 1. Ensure the effective on-boarding and presence of assessment agencies/ assessors at all RPL locations proposed 2. Ensure timely approval of results and certification of candidates Yours Sincerely,

THANK YOU Proprietary and confidential. This information does not represent and should not be construed as, legal or professional advice. © 2015 NSDC. All Rights Reserved. For More Information /