“Workshop on PoA: Challenges and Road Ahead” Session 2: Challenges in implementation of PoA policy and procedures - Experiences and challenges from the.

Slides:



Advertisements
Similar presentations
The CDM Project Activity Cycle UNFCCC CDM joint workshop March 2003 Bonn Kai-Uwe Barani Schmidt UNFCCC/Cooperative Mechanisms
Advertisements

UNFCCC Complexities in demonstration of additionality of a POA: Perspective of a Project Developer 8 th May 2011 Gareth Phillips Chairman, Project Developer.
Difficulties in Verification of a PoA: DOEs Perspective by Dr. Kaviraj Singh Workshop on Programme of Activities (PoA) under the CDM: Challenges and Road.
The Integration of PoA and NAMA; how can one support the other Ingo Puhl South Pole Carbon Asset Management Ltd. Bonn, 8. May 2011 Prepared by South Pole.
DNV Climate Change Services AS: Trine Kopperud 05 May 2011 DOEs perspective: DOE Liability in context of PoA Workshop on Programme of Activities under.
CONOR BARRY, Team Lead OSD UNFCCC Secretariat SDM programme Setting expectations of the workshop Bonn, 7- 8 May 2011 Workshop on Programme of Activities.
Workshop on Programme of Activities under CDM, Bonn, 7-8 May 2011
UNFCCC Recent Challenges in Implementing PoAs from a Commercial Perspective 8 th May 2011 Mischa Classen Senior Project Manager Regulatory Affairs and.
PoA Challenges & Opportunities
Practitioners Workshop: Standards for Baseline Scenario Identification and Baseline Emission Calculations - DOE Viewpoints DOE/AE Forum | Werner Betzenbichler.
Regional Distribution
T HE W ORLD B ANK C ARBON F INANCE U NIT J OINT C OORDINATION W ORKSHOP B REAKOUT S ESSION 1.1. P O A M ARCH 2011 P RESENTATION BY F ELICITY S PORS (F.
A Project Developers view on lessons learned and challenges with PoAs (module 2.2) 24 March 2012 Mischa Classen Executive Committee, Project Developer.
PoA AFTER Cancun - READY TO TAKE OFF NOW
UNFCCC secretariat, Sustainable Development Mechanisms Programme Conor BARRY Improving and demonstrating efficiency in CDM processes 7 th Joint Coordination.
Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.
Defining Standardized Baseline: The role of DNAs Malin Ahlberg Co-Chair of the DNA Forum 13 March 2011, Bonn.
. CDM Project Cycle Calibration Melanie Eddis ERM Certification and Verification Services (ERM CVS) CDM Coordination Meeting UNFCCC, Bonn March 2012.
SDM programme, UNFCCC secretariat Wenxin Li, Programme Officer Overview of PoA Standards SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
UNFCCC secretariat, Sustainable Development Mechanisms Programme Modalities and procedures for direct communication with stakeholders 3/CMP 6, para. 21,
Wrap-up session 1 st Sustainable Development Mechanisms Joint Coordination Workshop Maritim Hotel Bonn Germany, March 2012.
T HE W ORLD B ANK C ARBON F INANCE U NIT Standardised Baselines Framework March 24-25, Bonn.
Data Quality Considerations
“Workshop on PoA: Challenges and Road Ahead” Session 10: - Should liability be shared by DOE and PP/CME - Perspectives of DOEs DOE/AIE Forum | Werner Betzenbichler.
BLY CPA Verification- A DOE’ Perspective Archak Pattanaik New Delhi,
Verification of Forest-based Carbon Projects Sebastian Hetsch Carbon Management Service TÜV SÜD Industrie Service GmbH Roundtable on Validation and Verification.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
TÜV SÜD South Asia Programme of activities (PoA) - Requirements & Challenges in CPA inclusion By Vijayanand TÜV SÜD South Asia
CDM PoA CPA. What is a Programme of Activities? Definition: A programme of activities (PoA) is a voluntary coordinated action by a private or public.
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
T HE W ORLD B ANK C ARBON F INANCE U NIT PoAs and liability – the issue P RESENTATION AT UNFCCC P O A WORKSHOP M AY 2011 BY F ELICITY S PORS (F
UNFCCC Secretariat Status of negociations on CDM Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America and the Caribbean,Bogota, (31 –
UNFCCC How to address DOE Liability in context of PoA: Perspective of a Project Developer 8 th May 2011 Gareth Phillips Chairman, Project Developer Forum.
1st Sustainable Development Mechanisms Joint Coordination Workshop Significant Deficiencies in Validation, Verification and Certification Reports Risk.
Dimensions of Data Quality M&E Capacity Strengthening Workshop, Addis Ababa 4 to 8 June 2012 Arif Rashid, TOPS.
Validation & Verification Report Templates – RIT Perspective Vinay Deodhar, RIT, AP Member Module March 2012 First SDM JCW, Bonn, Germany.
SQA Architecture Software Quality By: MSMZ.
· © 2012 Perspectives GmbH PoA Standards Courtney Blodgett Joint Coordination Workshop, Bonn 24 March 2012.
Possible Development of CDM in the Post-2012 Regime DUAN Maosheng Tsinghua University Beijing, Nov. 19, 2007.
TÜV SÜD Industrie Service GmbH Workshop on PoA under the CDM: challenges and the road ahead - Bonn 8/9 May 2011 Session 9.1 „Application of Sampling in.
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
Calibration regarding project assessment requirements - RIT Perspectives Vinay Deodhar, RIT Module th JCW Bonn, March 2011.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
CFL Lighting Scheme – Bachat Lamp Yojana CDM Requirements.
School of Health Systems and Public Health Monitoring & Evaluation of HIV and AIDS Programs Data Quality Wednesday March 2, 2011 Win Brown USAID/South.
Roundtable on Validation and Verification Issues in LULUCF Projects The World Bank, Washington DC August 24-25, 2009 Issues in Validation of A/R Projects.
Best Practices for Preparing PoA- DD and CPA-DD UNFCCC Workshop on PoAs, 7 May 2011 Dr. Christoph Sutter CEO, South Pole Carbon Asset Management Patrick.
1st Sustainable Development Mechanisms Joint Coordination Workshop The Implementation of the VVS and the PCP - the DOEs' perspective DOE/AE Forum | Werner.
[Hayes, Dassen, Schilder and Wallage, Principles of Auditing An Introduction to ISAs, edition 2.1] © Pearson Education Limited 2007 Slide 7.1 Internal.
TÜV SÜD Industrie Service GmbH Workshop on PoA under the CDM: challenges and the road ahead - Bonn 8/9 May 2011 Session 8.1 „Additionality in the context.
TÜV SÜD Industrie Service GmbH CDM JCW Bonn 12 March 2011 Module 1.2 „existing barriers within the current PoA rules” An analysis from a DOEs perspective.“
UNFCCC secretariat, Sustainable Development Mechanisms programme Nashib Kafle, Associate Programme Officer Session 3: The Concept of Programme of Activities.
7th Joint Coordination Workshop “Improving efficiency in the operation of CDM” - DOE Viewpoints DOE/AIE Forum | Werner Betzenbichler | March 2011.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Capacity Development for the CDM (CD4CDM) First National Workshop - SURINAM Host Country Institutional Issues Miriam Hinostroza UNEP.
Risk Management and the Treasury Function
JISC – work accomplished and challenges ahead
Monitoring and Evaluation Systems for NARS Organisations in Papua New Guinea Day 3. Session 9. Periodic data collection methods.
Developing the Overall Audit Plan and Audit Program
Chapter 13 Overall Audit Plan and Audit Program
DOE/AIE Forum | Werner Betzenbichler | March 2011
Presentation title Maritim Hotel Bonn Germany, March 2012
Internal controls 01-Nov-2017.
Chapter 13 Overall Audit Plan and Audit Program
Small-Scale Projects Under JI
Good practices for risk assessment and control activities
Development of determination and verification manual (DVM)
Awareness and Auditor training kit
Joint implementation programmes of activities (JI PoA)
SPOT CHECKS 2016.
Presentation transcript:

“Workshop on PoA: Challenges and Road Ahead” Session 2: Challenges in implementation of PoA policy and procedures - Experiences and challenges from the perspectives of a DOE DOE/AIE Forum | Werner Betzenbichler | Bonn, May 2011

Topics Existing Barriers Consequences Focus of DOE assessments

Existing Barriers (for DOEs) Ambiguous guidance on additionality assessment (EB-60 was helpful) VVM gives some “liberty”: However there are a number of requirements unique to PoAs for which additional instructions are provided below (2 paragraphs), the precise extent of validation required in each of these areas will need to be determined by the DOE based on the type or PoA being validated.  bad experience (once bitten, twice shy) Limited DOE competition due to varying interpretation of required minimum efforts Incalculable risks due to erroneous inclusion issue lead to full assessment of all CPAs and to increased transaction cost Longwinded, costly and questionable procedure for reviewing erroneous inclusion Who should detect and report such cases?

Consequences by these barriers Few incentives to give momentum to further business development Small amount of trained resources lowers speed in gaining experiences Extra discussions on liability when closing contracts Time-demand in validations Incalculable risks prioritize an “observer status”, awaiting further clarity No real cost reduction for project participants as originally intended

Focus of DOE assessments / where it is Validation − Additionality of the first CPA − Monitoring especially sampling − Standard CDM requirements − Forwarding issues to inclusion Inclusion: − Minimizing risk of erroneous inclusion by complete checks Verification: − No reported experiences

Focus of DOE assessments / where it should be the correct choice and application of the methodology the appropriateness and completeness of eligibility criteria the system and internal checks for CPA inclusion, its implementation and its effectiveness; the system for monitoring of the required parameter, its implementation and its effectiveness; the appropriate implementation of the PoA with regard to technological aspects; the system for internal verification, its implementation and its effectiveness; a confirmation of the amount of CERs that can be certified at a reasonable level of assurance taking into account the fact that the result is based on the assessment of samples

Werner Betzenbichler Chair of the DOE/AIE Forum on behalf of TÜV NORD Designated Operational Entities and Independent Entities Association ▪