1 SAFERIB EURISOL DS WP5 Progress Report CERN-RP: Mariano Menna, Jerôme Desarzens, Thomas Otto.

Slides:



Advertisements
Similar presentations
Proposal for a programme of Neutrino Factory research and development WP-3 The Target The Neutrino Factory Target Lead Author - J R J Bennett CCLRC, RAL.
Advertisements

1 Activation problems S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2) (1) Politecnico di Milano; (2) CERN.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to ASAC R. Casey Radiation Shielding: Assumption and Design April 24, 2007.
Safety at ESS. Thomas Hansson Nuclear Safety Engineer at ESS, since November 2011 Experience from Swedish Nuclear Power Plants since 1991 (Mainly Fuel.
K. Oishi, K. Kosako and T. Nakamura Institute of Technology, Shimizu Corporation, Japan id=17 SATIF-10.
Shutdown Constraints and Radiation and Activation effects ECFA - Aix Les Bains S. Bally, O. Beltramello, I. Bergstrom, N. De Bortoli, H.Vincke,
C. Theis, D. Forkel-Wirth, S. Roesler, H. Vincke.
ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. W. Zeuner, W. Riegler, R. Lindner, B. Di Girolamo, G. Corti, C. Schaeffer,
ATC/ABOC Days 21-23/1/2008 Heinz Vincke for SC-RP 1.
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
Beta Beams Safety issues and WBS E. Benedetto and E. Wildner EUROnu Safety Workshop 9-10 June 2011, CERN Outline Introduction: the Beta Beams Tentative.
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
1 Radiation Safety Aspects of the Linear Collider B. Racky, A. Leuschner, N. Tesch Radiation Protection Group TeV Superconducting Linear Accelerator.
Radiological Aspects of ILC Hee-Seock Lee Pohang Accelerator Laboratory 2 nd Workshop of Korean ILC at PAL.
CERN NuPAC meeting Dec 2005 The future of ISOLDE: accelerated radioactive beams Peter Butler 1.HIE-ISOLDE 2.EURISOL.
1 Safety Issues for HIE-ISOLDE and nTOF-Ph2 Thomas OTTO, Radiation Protection Group, SC-RP, CERN.
Tungsten Calorimeter Model Calculations and Radiation Issues Pavel Degtiarenko Radiation Control Group, Jefferson Lab.
Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others.
The Status of ESS Accelerator Shielding and Accident Scenarios Lali Tchelidze May 26, 2014.
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions Ewan Paterson Technical Board June 23,
Radiation Protection during design, operation and dismantling of target areas Thomas Otto based on material from RP group.
Experimental part: Measurement the energy deposition profile for U ions with energies E=100 MeV/u - 1 GeV/u in iron and copper. Measurement the residual.
Radiation safety evaluation for “KAMABOKO” Main Linac Tunnel KEK-APL : T.Sanami, S.Ban KEK-ACC : A.Enomoto, M.Miyahara ILC Mechanical & Electrical Review.
Managed by UT-Battelle for the Department of Energy Residual Does Rate Analyses for the SNS Accelerator Facility I. Popova, J. Galambos HB2008 August 25-29,
Residual Radiation Cooldown: Main Injector Bruce C. Brown Fermilab All Experimenters Meeting 19 March 2012.
Beam loads & dump concepts T. Kramer, B. Goddard, M. Benedikt, Hel. Vincke.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Nuclear Facilities Decommissioning & Design An introduction to SENAC activities JM. Dumas CEA Saclay, DSM/DAPNIA/SENAC, F Gif-sur-Yvette,
1 Question to the 50GeV group 3GeV からの 54π と 81π 、 6.1π の関係 fast extraction 部の acceptance (81π?) Comments on neutrino beamline optics?
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Considerations for an SPL-Beamdump Thomas Otto CERN in collaboration with Elias Lebbos, Vasilis Vlachoudis (CERN) and Ekaterina Kozlova (GSI) Partly supported.
1 Neutron Effective Dose calculation behind Concrete Shielding of Charge Particle Accelerators with Energy up to 100 MeV V. E Aleinikov, L. G. Beskrovnaja,
Radiation Protection in J-PARC neutrino beam line Sep Yuichi Oyama (KEK) for T2K neutrino beam line construction group Happy birthday.
NToF - Radiation Protection M. Brugger, P. Cennini, A. Ferrari, E. Lebbos, V. Vlachoudis CERN AB/ATB/EET.
WP2 progress on safety E. Baussan EUROnu CB Meeting Monday 10th & Tuesday 11th June 2011 CERN, Geneva, Switzerland.
1 Radiation Monitoring at CTF3 CTF3 Buildings – weak spots Radiation Monitoring system Monitoring results – First Lessons Idelette Floret, Thomas Otto,
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop R. Casey Activation Issues for NSLS-II March 28, 2007.
Ma zhongjian Ding yadong Wang qingbin Wu qingbiao Radiation Protection Group/IHEP.
Radiation Protection At Accelerator Facilities Matthew Quinn, PhD Radiation Physicist, Fermilab ESH&Q Section American Nuclear Society Student Section.
The Panorama of the Future Radioactive Areas from now to 2020 S. Roesler on behalf of DGS-RP Workshop on remote manipulations and diagnostics in radioactive.
EURISOL DS Task meeting Orsay, 07 Janvier Preliminary shielding assessment of EURISOL Post Accelerator D. Ene, D. Ridikas. B. Rapp.
Tailoring the ESS Reliability and Availability needs to satisfy the users Enric Bargalló WAO October 27, 2014.
Dark Current in ILC Main Linac N.Solyak, A.Sukhanov, I.Tropin ALCW2015, Apr.23, 2015, KEK LCWS'15, Tsukuba, 04/2015Nikolay Solyak1.
Safety & Radioprotection 8 Jul. 2005, Liverpool, UK WP 5: Safety & Radioprotection Participants:role 1. GANIL, France - sub-task D 2.
EURISOL, TASK#5, Bucuresti, November 1 Preliminary shielding assessment of EURISOL Post Accelerator D. Ene, D. Ridikas. B. Rapp.
Towards the next generation RIB facility using the ISOL Method: radiological protection and shielding challenges P. Vaz, R Luís, Y. Romanets, J.C. David,
1 How Many Protons can we afford to loose in the PS ? Thomas Otto SC-RP.
KEK Radiation Related Topics neutrino beam construction subgroup Yuichi Oyama (KEK) and target monitor subgroup for.
Radiation protection studies for the ESS Activation issues AD seminar Michał Jarosz , Lund.
Summary of IAP comments from 2007 EURISOL Town Meeting
ILC Cryogenics: Study of Emergency Action and Recovery - in progress -
Primary Radiation Calculation for Sun Yat-Sen Proton Hospital
J. Bauer, V. Bharadwaj, H. Brogonia, A. Fasso, M. Kerimbaev, J. Liu, S
Heating and radiological
Induced-activity experiment:
S. Roesler (on behalf of DGS-RP)
Uppsala Commitment to ESS and FREIA Planning
Radiation Protection Issues After 20 Years of LHC Operation
Radiation protection of Linac4 M. Silari Radiation Protection Group
Status of the beta-beam study
Accelerator R&D for Future Neutrino Projects
E. Métral, N. Mounet and B. Salvant
Preliminary Study – Radiation induced activity in a SB Target
Radioactive waste management - status
Joint session – Beta-beams
Maximum Credible Beam Event Paul Emma et al
The External Radiation Hazard
Radiation fields During 1st stage beam commissioning
CEPC Radiation and Shielding
Presentation transcript:

1 SAFERIB EURISOL DS WP5 Progress Report CERN-RP: Mariano Menna, Jerôme Desarzens, Thomas Otto

SAFERIB / EURISOL 05/20082 SAFERIB Overview Activity content in UC- targets Th. OttoData available and used, report pending Shielding of hotcellTh. OttoReport written Activation of target components Th. Otto, M. Magistris Various reports and proceedings available Environmental impact of target incidents M. Menna, P. Vojtyla Report under review External dose rate coefficients for exotics J. DesarzensReport in preparation Ground activation at ISOLDE (-> EURISOL) Th. OttoIn progress

SAFERIB / EURISOL 05/20083 EURISOL Overview Validation of Monte-Carlo isotope production code M. FelciniReport, Proceedings Pohang Shielding of MMW targetM. FelciniProceedings Pohang Various work on old MMW target Th. Otto, M. Felcini obsolete Shielding of 100 kW target Th. OttoReport Ground activation at EURISOL LINAC Th. OttoReport under review Streaming of radiation in MAFF-tube Th. OttoPreliminary study terminated, continue with “real” geometry Ground activation at 100 kW/ MMW targets Th. OttoIn Progress Dose rate estimates for work in Linac tunnel Th. OttoPreliminary study terminated, improvements in progress

SAFERIB / EURISOL 05/20084 SAFERIB: Environmental Impact Study Assumption: 1 UC target (10 19 protons, 3 months post-irradiation) fully vapourised. Dose to member of public (living next to CERN): under unfavourable conditions, approx. 1 mSv 85 % of dose provoked by volatile Po-isotopes Report under Review Some steps need to be taken in CERN’s interim storage for ISOLDE targets.

SAFERIB / EURISOL 05/20085 SAFERIB: External dose rate coefficients External dose rate coefficients (“Gamma-factors”) permit a simple estimate of H*(10) for a given activity Usually, only istopes with t 1/2 > 2 min. listed Calculated also for exotic nuclides, possibly produced at ISOL facilities Use decay data from NuDat 2.4 from NNDC, fluence-to dose-coefficients from ICRP 74 Approach to beta-decay: describe spectrum with statistical factor and Fermi-function F(Z,W)

SAFERIB / EURISOL 05/20086 EURISOL: Soil activation, water contamination Use conservative screening approach from Bull, Baker et al. (Fermilab & SSC): saturation activity leached into soil moisture (no additional dilution) Model: EURISOL LINAC, loss rate 1 W m -1 Compare results with limits and guidelines, from different countries

SAFERIB / EURISOL 05/20087 EURISOL: Soil activation, water contamination 3 H-activation of soil at 500-MeV-point “Activation layer” (3 m thick) contains 99.9 % of activation products

SAFERIB / EURISOL 05/20088 EURISOL: Soil activation, water contamination 3 H in water from activation layer probably acceptable, 22 Na content inadmissibly high “Underground environment” must be protected when new accelerator projects are planned. Extend the method to target stations: 1 kW (SAFERIB)– 100 kW - MMW Elaborate guidelines for target area construction

SAFERIB / EURISOL 05/20089 EURISOL: Radiation streaming Dose rate in duct with  =8.5 – 16.7 cm Dose rate scales as d/A 1/3: curves for different diameters fall approximately together For obstacle in duct: streaming comparable to duct of smaller diameter, if target off-axis Will study streaming in the MAFF-like target station, plans just received.

SAFERIB / EURISOL 05/ EURISOL: 1 W/m loss and “hands-on” maintenance 1 W/m loss power corresponds to a fractional loss of m -1 at a 1 MW accelerator ! Question to accelerator engineers: Is it achievable ? In LINACs, on average, yes. Question to RP staff: Is it ALARA ? Depends on time and duration of the access. What does “hands-on” mean exactly? Two possible answers: “We can do the job without worrying about radiation” “No robots or manipulators are needed”

SAFERIB / EURISOL 05/ For example: E = 1 GeV, loss 1 W/m 8 months of operation 1 week wait (typical for begin of shutdown) Ambient dose rate is everywhere H*(10) > 100  Sv/h Close to vacuum chamber H*(10) > 1 mSv/h “Hands-on ?”

SAFERIB / EURISOL 05/ Energy dependence 40 cm is worker’s distance during repair work Highest activation at proton energies of several 100 MeV Simple Explanation: Low E: protons stopped, dE/dx high, high activation High E: protons pass through material, small dE/dx Ambient dose rate H*(10) in 40 cm from accelerator for linear loss of 1 W/m

SAFERIB / EURISOL 05/ What remains to be done ? SAFERIB: Finish last 2 reports Contribute to final report with consolidated results EURISOL: Soil activation at LINAC Soil activation at target stations Streaming in MAFF tube with realistic design Dose from activated components during maintenance