1 CASE STUDY: Platform Migration Mike Furgal Director – Managed Database Services BravePoint.

Slides:



Advertisements
Similar presentations
FINANCIAL REPORTING. Corporate Overview HQ out of Tampa, FL Midwest Regional Office, Indianapolis, IN West Regional Office, Denver, CO Oracle Gold Partner.
Advertisements

MUNIS Platform Migration Project WELCOME. Agenda Introductions Tyler Cloud Overview Munis New Features Questions.
User Documentation.  You cannot build a system for a client and leave them without adequate documentation  Computer systems are complex, require configuration.
Protect Your Business and Simplify IT with Symantec and VMware Presenter, Title, Company Date.
VERITAS Software Corp. BUSINESS WITHOUT INTERRUPTION Fredy Nick SE Manager.
1 PUG Challenge EU 2014 Click to edit Master title style PUG Challenge EMEA 2014 – Dusseldorf, Germany Common Database Problems Common Database Solutions.
GAJAH ANNUAL REPORT 2015 | 1 Business Process Management Meghan Atkins Lohith Bangalore Omprakash John Doyle Rebecca Mazur.
CON7911: Building the Roadmap to a Successful Oracle Commerce Upgrade
Microsoft Dynamics AX Technical Conference 2013
VIRTUALIZATION AND YOUR BUSINESS November 18, 2010 | Worksighted.
Installing software on personal computer
Deploying Visual Studio Team System 2008 Team Foundation Server at Microsoft Published: June 2008 Using Visual Studio 2008 to Improve Software Development.
Paper on Best implemented scientific concept for E-Governance Virtual Machine By Nitin V. Choudhari, DIO,NIC,Akola By Nitin V. Choudhari, DIO,NIC,Akola.
Client Management. Introduction In a typical organization there are a lot of client machines used for day to day operations Client management is a necessary.
1 The Virtual Reality Virtualization both inside and outside of the cloud Mike Furgal Director – Managed Database Services BravePoint.
Annie Griffith Infrastructure Programme Manager July 2007 UK Link Technology Refresh.
Top Performance Enhancers Top Performance Killers in Progress Dan Foreman Progress Expert
Bring Your Business into the 21 st Century : Part 1 WasteExpo 2011 Improving Your Financial Management System.
Chapter 16 Designing Effective Output. E – 2 Before H000 Produce Hardware Investment Report HI000 Produce Hardware Investment Lines H100 Read Hardware.
Strength. Strategy. Stability.. Progress Performance Monitoring and Tuning Dan Foreman Progress Expert BravePoint BravePoint
10/8/20151 Mobile Apps and QAD Stephen McHugh Broom Street Software 03-17,2013.
LoadRunner SE Guide 김범수 한국비지네스써비스 ( 주 )
What’s New in the QAD Learning Center? Bernadette Bagley, March 2014 MWUG Spring Conference.
Customer Tracking System. Lucent designs, manufacturers and sells telecommunications networks and equipment to communications service providers Challenge:
Update on QAD’s reporting Framework Jeffrey Steele 1.
American Trim Paul Pellegrini, Director of IT.
UBN Software Solutions Pvt. Ltd. Bhubaneswar , Odisha, India ( ) UBN PROJECT CASE STUDY.
Common Database Problems Common Database Solutions Mike Furgal Managed Database Service EMEA PUG Challenge 2015, Copenhagen, Denmark 4 – 6 November, 2015.
1 Overcoming your Reporting and Replication Hurdles Mike Furgal Director – Managed Database Services BravePoint.
Chapter 8 Process Implementation Reference: Tan, A. (2007). Business Process Reengineering in Asia: A Practical Approach, Pearson Education, Singapore.
Chapter 9 The People in Information Systems. Learning Objectives Upon successful completion of this chapter, you will be able to: Describe each of the.
Automation Solutions – Product & Practice
Patricia Alafaireet  Lecture 2 – Implementation and go-live strategies Data conversion Communication Planning Downtime.
Common Database Problems Common Database Solutions Mike Furgal PROGRESS Bravepoint – Database Services.
Dynamics AX Henrik Hasselblad Business Unit Manager.
Pro2SQL: BI and Reporting solution June 26 th – June 29 th Manchester, NH Greg White – Sr Consultant Progress Software.
INTRODUCTION TO DESKTOP SUPPORT
SUSE Linux Enterprise Server for SAP Applications
Platform and Data Migration With Little Downtime
Microsoft Connect /23/ :39 PM
Information Technology Virtualized Server Update
Application Outsourcing: Achieving Success & Avoiding Risk
James Blankenship September , 2016
Adam Backman Chief Cat Wrangler – White Star Software
James Blankenship March , 2017
Cloud Computing.
How Social is your data Fundamentals on database storage
How to Reduce Costs and Increase Productivity with MDBA
Moving to Epicor ERP version 10: Experiences so far
Company Getriebebau NORD GmbH &
Windows Server 2008 and SQL 2008 Windows Server 2008.
CCNET Managed Services
Real-Time Data Replication From Your Progress DB (Pro2 Enterprise)
Information Technology Project Management – Fifth Edition
PALRAM Industries Ltd. Kibbutz Ramat-Yohanan, Israel Industry
IQA Improvement Work.
Why PC Based Control ?.
Mcafee updates Mcafee antivirus uses a database of known virus definitions to identify malware and other threats on your computer system. So it is important.
Progress OpenEdge MDBA Services
How’s Your On-Time Delivery?
Company Yangquan Coal industry (Group) Co. Ltd
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
What is iSCSI and why is it a major selling point for NAS?
Minimize Unplanned Downtime and Data Loss with OpenEdge
Upgrading Your Private Cloud with Windows Server 2012 R2
Leave the driving to Us with the Progress Managed Database Service
OPS-14: Effective OpenEdge® Database Configuration
Azure Site Recovery (ASR)
HCL Application Modernization Services
{Project Name} Organizational Chart, Roles and Responsibilities
Presentation transcript:

1 CASE STUDY: Platform Migration Mike Furgal Director – Managed Database Services BravePoint

2 Introduction- Mike Furgal Progress Employee from 1989 to 2012 Progress Employee from 1989 to 2012 Joined Bravepoint in 2012 Joined Bravepoint in 2012 Progress/OpenEdge Database Expert Progress/OpenEdge Database Expert

3 Introduction - BravePoint The Largest OpenEdge consulting group in the world The Largest OpenEdge consulting group in the world QAD Alliance Partnership QAD Alliance Partnership Founded in 1987 Founded in 1987 Specializes in all things OpenEdge Specializes in all things OpenEdge QAD customizations 4GL/ABL coding Database Services Much much more…

4 Why Change Platforms? How old is your DB Server? < 2 years? < 2 years? < 3 years? < 3 years? < 4 years? < 4 years? > 5 years? > 5 years?

Doesn’t seem that long ago.

6 Service Wire – Case Study Service Wire Industrial grade wire and cable. Employees: 375 Revenue: 300MM Started in 1968, 3 manufacturing facilities VA, TX, AZ About 4,000 products

7 QAD Environment Live since SE with NET UI users all using NET UI Bolt Ons CSS 32soft QCS – ProtoProgress Optio – Forms Design

8 Service Wire was experiencing machine crashes over the past year. These unplanned outages were unacceptable to the business. Hardware and OS diagnostics were run, but did not solve the problem

9 Solution Decided to virtualize the environment.

10 Phases PlanningTesting Cut-over/Go Live Post Go Live activities

11 Phases A 3 month effort overall

12 Planning Determining all the access paths to QAD Determining all the places where QAD application called out What are all the bolt ons

13 Dependencies Graph

14 Dependencies Doc Description How were they related What function did they server What means where they connected to each other

15

16 Testing Built a copy of the production environment Install OpenEdge Copied QAD Configured the NET UI Copied all customizations Recompiled the application Brought the data over

17 Testing Tested each aspect of QAD Data Entry ERP Month End Etc Tested each access path Documented what needed to change to get access to the new machine name

18 Testing Challenges Getting the new system to match the old system Moved from RH 4.3 release to CentOS 5.8 Missing RPMs Sizing the new machine The Physical Machines disks were faster than the Virtual Machine disks

19 Testing Near the end of the testing processes a cut-over date was determine. From that point forward there were go/no-go meetings every Wednesday with all the stakeholders

20 Go No/Go Included all stakeholders People doing the testing People representing the business An open forum for people to discuss problems and scheduling

21 Go Live Rehearsed several times during testing Minimize downtime Data Refresh from production Hostname updates

22 Post Go Live After the go live there were things that needed to be done Reimplement the DR environment Performance Tune Fail over test

23 What went well Had a good framework for vetting problems and issues Early identification and assigned them Experts available to solve technical issues around QAD and the OS

24 If you had to do it again Take more time in unit testing We were optimistic that setting the go-live date

25 Problems Changed the go-live date 4 times Go/No-Go meetings on Wednesday (good thing)

26 Side Benefits Upgraded OpenEdge from 10.2B04 to 10.2B08 Allows for better tuning options A thorough understanding of the QAD environment Found flaws in the fail-over scenario Confidence we could do it again

27 Summary Hardware has changed dramatically over the past 5 years It may be time to revisit your platform Platform migrations have many benefits Always good to leverage expertise of people who have done it before

28 Questions Answers ? ? ? ? ? ? ? ?