© 2012 IBM Corporation 12/19/2013 Rational Team Concert – User Administration Bruce Besch.

Slides:



Advertisements
Similar presentations
Holdings Management Overview
Advertisements

Compose Workflow. Home page To compose a workflow navigate to the “Workflow Editor” page.
101 Complete Moodle Tutorial. Logging In Navigate to Your login name will.
Customizing the MOSS 2007 Search Results November 2007 Rafael Perez.
WASTE MANAGEMENT ©2010 SciQuest USA Confidential 1 Powered by RFx User Guide.
IQSM Intelligent Quality Security Management Demonstration of features.
HELP GUIDE NEW USER REGISTRATION (SLIDE 2) TAKING A QUIZ (SLIDE 8) REVIEWING A QUIZ (SLIDE 17) GROUP MEMBERSHIP (SLIDE 26) CREATING QUIZZES (SLIDE 31)
© 2009 by Boeing; made available under the EPL v1.0 | March 22, 2009 | From to deployment Tutorial Ryan Brooks Donald Dunne Roberto.
Training Guide. The Punch Out Catalog System The Punch Out shopping catalog for Office Depot takes the user directly into the vendor’s website and online.
Service Request Management HOW TO CREATE. SRM – How to Create Login to system using your windows credentials.
Getting an account with WordPress.com Open your web browser ( mozilla firefox, internet explorer, opera, etc.,)
Oracle Sourcing Quick Start Guide.
Working with SharePoint Document Libraries. What are document libraries? Document libraries are collections of files that you can share with team members.
November 3, 2011 Deborah de Bruin Building Digital Libraries.
Systems Module Slide 2 – Overview and Navigation
RMsis – v Simplify Requirement Management for JIRA.
Moodle (Course Management Systems). Managing Your class In this Lecture, we’ll cover course management, including understanding and using roles, arranging.
Dreamweaver MX. 2 Overview of Templates n Templates represent a web page design or _______ that will be common to multiple pages. n There are two situations.
0 eCPIC User Training: Resource Library These training materials are owned by the Federal Government. They can be used or modified only by FESCOM member.
IBM Software Group ® Project Area and Team Area in Jazz.
0 eCPIC Admin Training: OMB Submission Packages and Annual Submissions These training materials are owned by the Federal Government. They can be used or.
Creating a navigation bar in Fireworks. Setting up the canvas Open Fireworks and choose a canvas size big enough to fit the buttons on you are going to.
Confidential Web Ordering Overview. Confidential LOG ON:   Enter your login name &
How To Design Your Own Webpage Created Especially For You By: Amanda E. Stricklin.
Staff Module and Summary of Changes 1. Icon Changes: Page 3 Signing In and Password/Pin Changes: Page 4 Logging Out: Page 8 Staff Module Changes: Page.
MASSACHUSETTS UNDERGROUND STORAGE TANK (UST) DATA MANAGEMENT SYSTEM COMPLETING THE COMPLIANCE CERTIFICATION MassDEP, Bureau of Air and Waste.
IBM Rational Services © 2013 IBM Corporation Software Configuration Management Using the RTC Eclipse Client Bruce Besch (Version 1.0)
Invoices and Service Invoices Training Presentation for Raytheon Supply Chain Platform (RSCP) April 2016.
Easy Chair Online Conference Submission, Tracking and Distribution Process: Getting Started AMS WMC and AMS Annual Conferences Click on play to begin show.
Please wait, Our presentation will be starting soon. Use Alt+Tab key to go to other applications while the presentation is running. Use Esc key to stop.
My Stuff & More! How to personalize your OSLIS 2.0 “dashboard” and add files to your personal space.
Getting an account with WordPress.com
Core LIMS Training: Project Management
Project Management: Messages
Talentlink Configuration exercise
Program Management Portal (PgMP): What’s New in R8 for the Client
Creating Oracle Business Intelligence Interactive Dashboards
BIM 360 Glue Migration to BIM 360 Account Administration (HQ)
Microsoft Office PowerPoint 2007
Configuring Applications
About SharePoint Server 2007 My Sites
Lesson 3: Customizing Document Elements
Overview of SAMT Batch Upload
Single Sample Registration
Regional Architecture Development for Intelligent Transportation
Core LIMS Training: Advanced Administration
Review Committee Chair Instructions
Quickr Places & Templates Introduction
Program Management Portal (PgMP): Catalog and the Client
Boeing Supply Chain Platform (BSCP) Detailed Training
MyGaDOE Portal Provisioning for Security Officers
Setting Up and Supporting Clients Using Employee Development in ADP Workforce Now [Developer: Use this slide if you are not using audio. You can add.
THE BASICS PIONEER PLACE
Active Orders Supplier Administrator Training Getting Started Activities This training presentation describes the Getting Started activities that will.
BeAScout.org Unit Pin Management.
The Smarter Balanced Assessment Consortium
Penn State Educational Programming Record (EPR) Guide
The Smarter Balanced Assessment Consortium
Contractor Sourcing Application (CSA) Training
Moodle Training — Advanced Topics —
What’s New in HR for ADP Workforce Now
Using Employee Development in ADP Workforce Now
Overview of Contract Association Batch Upload
The Smarter Balanced Assessment Consortium
The Smarter Balanced Assessment Consortium
Adding , Editing, and Assigning Full Text Finder Links
Disclosures Admin Training.
Presentation transcript:

© 2012 IBM Corporation 12/19/2013 Rational Team Concert – User Administration Bruce Besch

© 2012 IBM Corporation2 Overview of this Deck Adding Users to Team Areas Setting a Users Role Adding, Removing or Describing a Role Permissions Timelines / Iterations Creating Team Areas Creating Categories Creating Streams Modifying Work Items Adding Work Items Templates Modifying Work Item Templates Workflows Steps to Enable a New Project Team

© 2012 IBM Corporation3 Overview of this Deck This administration slide deck is meant to help you find answers quickly on how to do certain administrative functions within RTC. This deck is not meant to take you through every scenario that will come up, nor will it take you step by step on what to do. It is not meant to be a replacement for the online help system, but will aid in those times you need some help remembering. This deck contains screen shots from project areas that may not be your own, but are merely examples. There are three parts to each page –Short description of where you can do it and why you would do it –Screenshot of where to find the area within RTC that you need to get to (place to add people to team area, place to add a new role, etc) –Link to the online help system for that specific topic, which will cover it in greater detail.

© 2012 IBM Corporation4 Adding Users to Team Areas Where: right click on the team area (Team Organization view). Click Add in the Members section Why: you may need to add new users (don’t forget to add their role) More Help: Team Area Concept:

© 2012 IBM Corporation5 Setting a Users Role Where: right click on the team area (Team Organization view), choose Open and look at the members section on the overview tab. Why : you may need to change a users role on a team. More Help:

© 2012 IBM Corporation6 Adding, Removing or Describing a Role Where: right click on the project area (Team Artifacts view), choose Open. Navigate to the Process Configuration tab (bottom section of new area that just opened up) and click on Roles. Why : You may need to add a new role, remove an existing role, or update the description of a Role. Remember, this is only defining the role itself. You’ll need to modify the permissions under Project Configuration and Team Configuration for each role. More Help:

© 2012 IBM Corporation7 Permissions Where: right click on the project area (Team Artifacts view) and choose Open. It is on the Process Configuration tab under both Project Configuration and Team Configuration Why: you may want give a specific role more or less permissions. Remember, roles should be set for most resources at the team area level. Users given specific roles at a certain level will have those roles/permissions, cascaded down through the sub-teams. Example – assigning someone to the Accounts team area will give them the same rights at the Accounts Team 1, Accounts Team 2, etc levels. More Help:

© 2012 IBM Corporation8 Timelines / Iterations Where: right click on the project area (Team Artifacts view) and choose Open. On the Overview tab, right hand side Why: you will need to add new timelines when you add a new project team. After a timeline is created, you will create a team area. More Help:

© 2012 IBM Corporation9 Creating Team Areas Where: right click on the team area (Team Organization view) Why: for all new project teams you’ll need to create a new team area for them. Don’t forget to add the Timeline first, so you can choose what timeline to associate it with. More Help:

© 2012 IBM Corporation10 Where : right click on the project area (Team Artifacts view) and choose Open. Tab is on the bottom. Why : for all new project teams you’ll need to create a new team area for them. You’ll also want to create a Category which will help organize work items. Categories show up in the Filed Against field on a work item. More Help: Creating Categories

© 2012 IBM Corporation11 Where: expand the project area (Team Artifacts view), right click on Source Control, New, Stream Why: for all new project teams you’ll need to create a new timeline or iteration, a team area and a stream. You may also want to update the process governance flow diagram to see where they fit in More Help: Creating Streams

© 2012 IBM Corporation12 Modifying Work Items Where: right click on the project area (Team Artifacts view) and choose Open. On the Process Configuration tab, go to Project Configuration => Configuration Data => Work Items Why: there is quite a bit to customize with work items, but be careful to fully understand the impacts of making changes, especially removing values. You can add work item types, custom attributes, enumerations (List of Values), workflows and more. More Help:

© 2012 IBM Corporation13 Adding Work Item Templates Where: from the top menu, choose File => Import => Team = Work Item Template Why: you may need to add work item templates, or modify existing ones. You actually cannot edit work item templates with RTC, so you’ll need to remove it if it is not needed, or re-import it and overwrite the existing one (shown on next slide). More Help:

© 2012 IBM Corporation14 Modifying Work Item Templates Where: right click on the project area (Team Artifacts view) and choose Open. On the Process Configuration tab, go to Project Configuration=>Configuration Data=>Work Items=>Templates Why: you may need to update an existing work item template. You actually cannot edit work item templates within RTC, remove it if it is not needed, or re-import it and overwrite the existing one (previous slide). You can use a decent text editor to edit the XML file, if you don’t have an XML editor. More Help:

© 2012 IBM Corporation15 Workflows Where: right click on the project area (Team Artifacts view) and choose Open. On the Process Configuration tab. Go to Project Configuration => Configuration Data => Work Items => Workflows Why: you may want to add additional states, remove states, or modify transitions between states More Help:

© 2012 IBM Corporation16 Steps to Enable a New Project Team When a new project team wants to use Rational Team Concert, you’ll need to set them up in the existing project area. The steps below outline what is needed to be done: 1.Create a timeline and appropriate iterations. Each project team will have their own timeline and iterations. 2.Create a team area, associate the timeline, add team members and assign roles. 3.Create the work item category and associate it with the newly created team area. 4.Create a stream, add the three components, add the flow target(s), identify default and current flow targets and save.