CMS Phase 2 Tracker R&D R. Lipton 2/27/2014

Slides:



Advertisements
Similar presentations
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Advertisements

1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
The Finnish CMS Collaboration Helsinki Institute of Physics S. Czellar, A. Heikkinen, J. Härkönen, V. Karimäki, H. Katajisto,R. Kinnunen,T. Lampén, K.
2S Module Workshop, 30 Jan 2012 Module positioning and cooling contacts 2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN  The objectives  Module positioning.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
CMS Phase 2 Tracker R&D R. Lipton 3/27/2014 Module R&D Allocation: Requested ~ $320k, received ~160k – Eliminate VICTR testing (continue with FNAL funds.
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
Phase 2 Tracker R&D Background: Initial work was in the context of the long barrel on local tracklet- based designs. designs of support structures and.
Module Development Plan I believe that we are ready to proceed to a program to demonstrate a PS module based on “2.5 D” interconnections. This is based.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
24 March 2014 The ups and downs of the MaPSA project March
Phase 2 Tracker R&D Background: Initial work was in the context of the long barrel on local tracklet- based designs. designs of support structures and.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
M. Gilchriese ATLAS Pixel Upgrade Thoughts on US Role.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
1 Outer Barrel, Phase 2 Mech Review 26 Aug 2013, indico: Antti Onnela, CERN Tracker Phase 2 Mechanics Review, 26 August 2013 Status of the Outer.
Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
Integration of the MVD Demonstrator S. Amar-Youcef, A. Büdenbender, M. Deveaux, D. Doering, J. Heuser, I. Fröhlich, J. Michel, C. Müntz, C. Schrader, S.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Panja Luukka. Silicon Beam Telescope (SiBT) Group Since 2007 a collaboration of several CMS institutes has been operating a silicon micro-strip beam telescope.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
Upgrade plans for ATLAS. Nigel Hessey (Nikhef) is overall ATLAS upgrade coordinator.
Straw man layout for ATLAS ID for SLHC
Dear Colleagues, In agreement with the CMS Upgrade Managers, the Tracker will hold a review of R&D activities related to outer tracker modules on.
Si Sensors for Additional Tracker
Final CALICE OsC meeting: Status and summary of project
Alignment of the CMS Tracker
Detector building Notes of our discussion
Scope R&D Participants/Infrastructure
 Silicon Vertex Detector Upgrade for the Belle II Experiment
Some input to the discussion for the design requirements of the GridPixel Tracker and L1thack trigger. Here are some thoughts about possible detector layout.
Technical Design for the Mu3e Detector
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
SVT – SuperB Workshop – SLAC 6-9 Oct 2009
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
End-cap Mechanics FDR Overview of the Project
Micro-channel Cooling
Hybrid Pixel R&D and Interconnect Technologies
CMS phase 2 pixel detector and its electronics
TileCal upgrade EVO meeting Demonstrator tesks
Status Caltech meeting – discussions of assembly centers, US responsibilities We will try to organize a PS module assembly workshop at Brown April 30 –
Mechanics: (Tim).
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
Adapting the via last Design
TK Upgrade report.
2S module geometry updates Module positioning concepts
Rod adaptors for module tests Module positioning studies
Sub-Detector Assembly Area Summary of discussion at ALCW2015
Ideas and Plans on Tracker Module Mechanics Developments
SVT Issues for the TDR What decisions must be taken before the TDR can be written? What is the mechanism for reaching those decisions How can missing information.
Work packages status in Torino and perspectives
Design and fabrication of Endcap prototype sensors (petalet)
Tracker Outer Barrel Silicon
Phase shifter design for Macro Pixel ASIC
SVT – SuperB Workshop – Frascati Sept. 2010
Perugia SuperB Workshop June 16-19, 2009
Updates on the Silicon Tracker 2S Module
3D electronic activities at IN2P3
Presentation transcript:

CMS Phase 2 Tracker R&D R. Lipton 2/27/2014 Both CMS and US CMS are trying to understand and manage phase 2 R&D. Duccio has prepared a summary of work and countries – US has nominal involvement in many areas, most are fairly marginal. The only area where the US has a central role is in L1 track finding. R. Lipton

1.1) R&D on planar silicon sensors Strip sensors for 2S module. Pixel and strip sensors for PS module. MS 2014. Tender 2017/2018. Finalize details. Try 8”. Qualify vendors. 1 MCHF. 2.1) FE ASICs CBC for 2S module, MPA and Ssa for PS module. Concentrator. 2014-2015: finalize specs. 2016: final version of CBC, first full-size proto of MPA, SSA and concentrator. 2018: full chipset. 1.5-2 MCHF. 2.2) ASICs for auxiliary electronics lp_GBT, DC-DC converter ASIC, small-size optical link 2.3) Hybrids FE hybrids and Service Hybrids for 2S and PS. Same technology. MS open. 2014: establish flex demonstrator. Close MS. Tender for dvelopment. 2015-2017. Finalize and select vendors for production. 0.5-1.0 MCHF 2.4) Macro-Pixel Sub-Assembly Just started. 0.5-1.0 MCHF. 2.5) TSVs – generic R&D Option. Could be used in the MPA – implement full connectivity along z, improve chip design (powering) R. Lipton

3.1) Module design and assembly Thermal performance, CTE match, assembly precsion.... Concepts defined. 2014-2016: optimize and validate with full size realistic prototypes. Qualify for radiation and cold. Evolve adapting to development of active components. 0.2-0.5 MCHF 3.2) Module prototyping and testing Test module/system functionality. Develop test systems. 2S mini-module tested and validated. 2014-2015: full-size 2S module, PS mini-module. Keep up with developments. 0.5-1.0 MCHF. 4.1) Support structures - ?? Develop concept for support structures. Module mounting, services, cooling segmentation and cooling contacts. Concepts defined. For TOB and TEC, two alternatives for TIB. 20142-2015: choose TIB concept. Study PS module mounting, arrangement of services and cooling segmentation. 2016-2017: finalize and prototypes where needed. 0.2-0.5 MCHF 4.2) CO2 cooling Develop concept for ~100 kW CO2 cooling system Mostly design work. May require some dedicated studies / lab tests. In common with ATLAS. Up to 0.5 MCHF. 5.1) prototype DAQ DAQ chain based on uTCA, compaible with GBT. GLIB-based proto developed and used in DESY test beam. 2014: deploy in hybrid and module test systems, evolve to large-size modules. 2015-2017: adapt to evolving hardware; migrate to FC7. 5.2) L1 track finding Demonstrate performance and build demontrator. Two concepts under study. At least one demonstrator for TDR. 0.5 MCHF each. 5.3) Advanced AM chips – generic R&D so far Would be needed for the AM-based concept. Baseline not yet defined. 0.5-1.0 MCHF. R. Lipton

TSVs We had originally planned to collaborate with CERN on the TSV work based on the 3T chip. The vendor doubled his price and we had to drop out of that phase. I hope to keep this work going in the US, funds are still allocated. An obvious possibility is to demonstrate insertion of TSVs in the PSI46 chip – which can then be bonded to sensors and tested. This is synergistic with the TSV interests of the phase 2 pixels. I have written to Jorgen Christianson, Roland Horisberger, Gino Bolla so far with no response… R. Lipton

“Ideally like to do” In the context of the Long Barrel (LB) design we worked on the chip design, rod supports, thermal modeling and testing, module structure, and off-detector track finding. Currently in the Barrel-Endcap (BE) we are working on: Thermal tests of materials and interfaces Fabrication of bump bonded dummy structures Off-detector tracklet-based track finding It is clear that we will not have the breath of involvement in the BE design that we had in the LB. In the outer tracker we could additionally contribute to: PS Module design – this appears limited by the CERN design of chip, hybrids, and overall structure TSV implementation Rod support design and fabrication More direct design work on the scale of the Long Barrel seems difficult at this point. R. Lipton

Pixels The forward pixels are more open as they are not a historically CERN project. We could begin to contribute in a more general way to: Forward disk extension mechanical design Module design Thermal design TSV implementation Power delivery Chip design (via RD53) Sensor design and fabrication (depending on vendors) + R&D on active edge/3D devices and large area arrays R. Lipton