Rev 0.3: Aug 7, Notes from TRISTAN Experiences N.Toge (KEK) for GDE RDB S2 Rev.0.3 Aug. 7, 2006.

Slides:



Advertisements
Similar presentations
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Advertisements

Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
THERMAL CYCLE TESTS OF RF WINDOWS IN STF INPUT COUPLERS 2010/12/07 Masato Satoh (KEK) 1.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
Shuichi Noguchi, KEK6-th ILC School, November Auxiliary Components  Input Power Coupler  HOM Dumping Coupler  Frequency Tuner  He Jacket  Magnetic.
E. KAKO (KEK) 2009' Sept. 30 Albuquerque Global Design Effort 1 Cavity Test Items in S1-G Cryomodule Eiji Kako (KEK, Japan)
TDR Part 2: 3.3 Cavity Integration (10 pages) H. Hayano Baseline Design based on the meeting discussion.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Status of crab crossing studies Presented by NAKANISHI Kota (KEK) 2008/1/25.
1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation.
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
Compatibility in the ILC ML. 主なデザインと相違点 BCD ( TTF) STF-BL その他 空洞、シー ル Φ 78 mm ビームパイ プ、アルミヘキサゴ ン Φ 80 mm ビームパイ プ、インジウムヘリ コ LL, Re 入力カプ ラー TTF-III 円筒セラミック窓.
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
Plug compatibility Document ILC10 cavity integration session H. Hayano.
Beijing ILC Workshop Global Design Effort 1 High-Gradient Module Test Lutz Lilje.
1.3GHz Input Coupler for ILC
Shuichi NoguchiHayama ILC Lecture, Part III ILC BCD Cavity  Maximum Use of Potential Performance  Maximum Use of each Cavity Performance 
● Offer the reliable system to the Asian regional facility STF. ● Improve TTF design and demonstrate in the beam line for RDR / TDR. ● Establish industrial.
Experience with LEP (and LHC) cryo-modules Workshop on cryogenic and vacuum sectorisations of the SPL O.Brunner – November ’09.
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
Requirements for Cryomodule What have to be inevitably realized?
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
1 K.Jensch, D.Kostin, DESY - Cryomodule components List S1 – DESY parts DESY parts for the S1 Cavity-String.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
704 MHz warm cavity November 4, 2015 A.Zaltsman: SRF & warm RF components for LEReC1  A single cell 704 MHz warm cavity is used to correct the beam energy.
Cryostat & LHC Tunnel Slava Yakovlev on behalf of the FNAL team: Nikolay Solyak, Tom Peterson, Ivan Gonin, and Timergali Khabibouline The 6 th LHC-CC webex.
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
Cryogenic Cooling Schemes for the SPL U. Wagner TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Specification Table 23 Oct 2007 FNAL Lutz Lilje DESY.
Hayama ILC Lecture, , Shuichi Noguchi 1 Part III ILC BCD Cavity  Maximum Use of Potential Performance  Maximum Use of each Cavity Performance.
Plug compatibility discussion TILC09 cavity integration session H. Hayano.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
Power couplers Timergali Khabiboulline (FNAL) FNAL-LBNL meeting on NGLS April 13, 2012.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Reliability of SNS Superconducting Linac April 12, 2011 Jeff Saunders SNS/ORNL.
Gradient Degradation Experience at Fermilab (NML/CM-1) Elvin Harms TTC Meeting, Beijing 5-8 December 2011.
Thomas Jefferson National Accelerator Facility Page 1 FNAL September 11, 2009 Design Considerations for CW SRF Linacs Claus H. Rode 12 GeV Project Manager.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
Tests on production cryomodules Bob Kephart Sept 30, 2006.
S2 Progress Report for EC H. Padamsee and Tom Himel For the S2 Task Force.
Cavities, Cryomodules, and Cryogenics Working Group 2 Summary Report Mark Champion, Sang-ho Kim Project X Collaboration Meeting April 12-14, 2011.
Eiji Kako (KEK, Japan)TTC at Cornell, 2013 June 13 1 HOM absorbers; KEK HOM couplers in injector Eiji Kako (KEK, Japan)
SCRF: Monthly WebEx Meeting Oct., 19, 2011
Klystron Maintenance Data in KEKB Injector Linac
TDR guideline discussion on Cavity Integration
CW couplers; KEK injector couplers Eiji Kako (KEK, Japan)
WP5 Elliptical cavities
ILC-SCRF Test Facilities considerations
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
Crab Cavity R&D Plan Kirk 1 6/Dec/2016
Update on HW commissioning
Vacuum System Failures at HERA
S1-G Webex meeting Global Design Effort
World Wide Fundamental Power Coupler meeting #3
SNS Fundamental Power Coupler History
V. Veshcherevich Cornell University
TTC meeting, Feb. 6-9, 2018, Milan Trouble Shorting of CW Operation of Superconducting Linac for Chinese ADS Yuan He, Yongming Li, Xinmeng Liu, Zheng Gao,
CW accelerating module test progress at DESY
KEK injector cryomodule
CEPC RF Power Sources System
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
CEPC-650MHz Cavity Cryomodule
V. Veshcherevich Cornell University
Tom Peterson, Fermilab 6 December 2011
Presentation transcript:

Rev 0.3: Aug 7, Notes from TRISTAN Experiences N.Toge (KEK) for GDE RDB S2 Rev.0.3 Aug. 7, 2006

Rev 0.3: Aug 7, References Experience on the Superconducting RF System in TRISTAN, S.Noguchi, Particle Accelerators, 1996, vol.54 pp [ ]/ Couplers - Experience at KEK, S.Noguchi et al, Proc. 4th Workshop on RF Superconductivity, ed. Y.Kojima, KEK Report (Jan. 1990). –Both posted at _external:rdb_s2_home _external:rdb_s2_home –This report mostly concerns the first write-up only.

Rev 0.3: Aug 7, TRISTAN SCRF System Basic Unit –Each RF Station (508MHz) drives 2 Cryostats, Each CM contains 2 units of 5-cell Cavities with Eacc ~ 3.6MV/m. –So, 1RF = 2 CMs = 4 Cavs TRISTAN System –8 RF Stations were operated in its final installation, –So, in total, TRISTAN: 8RFs = 16 CMs = 32 Cavs = 160 Cells –Compare this with an ILC unit, where 1RF = 3 CMs = 24 Cavs = 216 cells. –Beware, TRISTAN is CW (so is ILC DR); ILC ML is pulsed. Operation Period –Cold (4.4K) Time = 33,000 hrs (~ 1375 d) over 7 yrs –13 heat cycles –Beam Time ~ 870 d ~ 20,900 hrs –Total Cavity Beam Time ~ 20,900 d ~ 556,100 hrs

Rev 0.3: Aug 7, Failure Statistics HOM4 IC Leak Ceramic Arc 2 1 Polyethyl ene 11 Water Leak 21 Cavity Leak Piezo Tuner # of CMs continuously opearted for 6-7yrs = 7 # of CMs that had to be serviced in one way or others = 9

Rev 0.3: Aug 7, Failure Issue 1 : HOM Design revision was found necessary for the connectors. –Case A: Abnormal heating due to poor pin contact –Case B: Quenched HOM coupler allowed the fundamental mode to leak. All units were replaced soon afterwards. Lesson: –We need testing of all components in realistic operating (power) conditions, prior to design freeze. Comment: –Might be less acute for ILC ML whose RF is pulsed. –Same precaution is mandatory for ILC DR whose RF is CW.

Rev 0.3: Aug 7, Failure Issue 2: Input Coupler Type 1: Leaks at ceramic windows –Causes included cracking; arching from a coupler port flange; and unidentified reasons. Type 2: Burning of polyethylene backup disk leading to a window leak –Polyethylene in use, in stead of teflon, for fear of radiation damage was slowly degrading, although catalog implied OK. Went back to teflon. Type 3: Water leak from an outer cooling jacket of the window –Lucky to have them happen when warm (potentially a disaster scenario) Lesson: –Pay attention to long-term use of seemingly innocuous components in realistic operation conditions. Do not simply trust the catalog specifications. –Avoid use of water (ILC ML SCRF will not use LCW).

Rev 0.3: Aug 7, Failure Issue 3: Cavity Leak at Indium Joints This failure mode occurred only after long-term use –Indium joints got loosened after going through thermal cycles. –Design improvement applied. Lesson: –Look hard for the optimum flange joint design. –Pay attention to effects of thermal cycles. –If possible, try thermal cycle testing before design freeze.

Rev 0.3: Aug 7, Failure Issue 4: Piezo Tuners Short MTTR (since the drivers placed outside CM) but short MTBF. Radiation damage of plastic bolts pushing the tuner disks. No major issues of heat load due to the tuner components being outside CM (for TRISTAN) Lesson: –Radiation damage stability of components. Remark: –Need dedicated reliability study for ILC, since HW implementation could to be substantially different. Illustration from KEK Preprint

Rev 0.3: Aug 7, Discussion (1) Quite educational pieces of data. BUT, notice that if the SCRF system gives failure rates similar to what was observed at TRISTAN, operation of ILC will be in a serious trouble. As indicated by the KEKB SCRF performance, situation might be actually better if “TRISTAN lessons are faithfully respected”, or similar learning period is specifically allocated for ILC SCRF systems. We see, overall, components that can be tried out before design freeze and production launch should be tried out in realistic stress testing conditions thoroughly. Parameters to pay attention to in test environments : –Power –Mechanical –Thermal cycles –Radiation

Rev 0.3: Aug 7, Discussion (2) In terms of the # of HW components x time, 7 yrs operation at TRISTAN, in a very crude approximation, corresponds to ~1 ILC unit (1RF = 3CMs, etc) for a similar period. So, to time-compress the testing period, one MIGHT imagine –2 yrs operation of 3 ILC units (9CMs) –1 yr operation of 6 ILC units (18CMs) could give us operation experiences of a similar magnitude. However, we must be aware of the danger of simple scaling. –Some failure modes, before showing up, require a certain operation time on each individual component, rather than just a big total accumulated operation time. –Seeing a failure mode is one thing. Understanding it and developing a cure is another (i.e. takes time). We should repeat similar analysis of colleagues’ experiences from KEKB, CEBAF, LEP, SNS, TTF. E N D