NSRS in Nodal Proposal for Deployment & Recall Procedures ERCOT ROS 10/12-13/2006 By: S.Niemeyer R.Jones R.Wheeler B.Green J.Dumas P.Breitzman.

Slides:



Advertisements
Similar presentations
IMPACT TO FREQUENCY CONTROL DURING STARTUP AND SHUT DOWN OF UNITS
Advertisements

Proposal on Ancillary Service Deliverability Requirements QMWG January 6, 2012.
Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
ERCOT Draft NPRR Phase 2 ORDC RATF July 8, ERCOT draft NPRR Phase 2 ORDC Draft NPRR will include the following clarifications or additions: Updates.
NPRR 532 Performance Measurement & Verification and Telemetry Requirements for Load Resources providing Non-Spin David Kee CPS Energy Energy Supply & Market.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
1 Nodal Stabilization Market Call December 28, 2010.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Requirement Documents November 7, 2006 Sai Moorty MMS Project.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
Nodal Reliability Performance Measures Workshop Project No Public Utility Commission of Texas June 12,
August 17, 2011 Reliability Deployments Task Force Meeting Updated Analysis of Non-Spin Deployments and RUC John Dumas Director Wholesale Market Operations.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/ Hour.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
1 Market Trials Update NATF June 1, 2010.
Nodal ATF 1 Nodal Advisory Task Force Update for TAC November 4 th, 2010.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
PJM©2013www.pjm.com Demand Side Working Group Loads in SCED Angelo Marcino Real-Time Market Operations – PJM April 14, 2014.
October Project Release (NPRRs 710, 706, 698 and 595) ERCOT Operations & Market Operations WebEx Training October XX, 2015.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
Lead from the front Texas Nodal 1 Presented By: Sai Moorty MMS Project Engineer EMS/MMS Agenda – Overview of Submitted White Paper.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
Future Ancillary Services Team (FAST) Update April 24, 2014 TAC Meeting 1.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
ROS Report Bill Hatfield 2014 ROS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public June 26, 2014 TAC Meeting.
Resource Adequacy Task Force (RATF) Update to WMS October 8, 2013.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
Text reason for Deviation from Defined High Sustained Limit/Low Sustained Limit John Adams January 5, 2010 Nodal Advisory Task Force.
Presentation to the ERCOT Technical Advisory Committee July 1, 2010.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
1 EEA Workshop 3 April 2, /3/2015For the purpose of discussion only.
IMM alternate framework for Look-Ahead SCED November 21, 2011.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
Non-Spin Deployment Resmi Surendran. RUC Awarded Ancillary Service Bring Resources On-Line if awarding REG or RRS When awarding Non-Spin – First award.
OOM During Alerts ERCOT TAC June 7, 2007 Dan Jones Potomac Economics.
Use of ONTEST Resource Status over Telemetry: – ERCOT protocol permits the use of telemetered Resource Status code “ONTEST” during periods of start-up.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
ROS Presentation: Dynamic Scheduling and EEA Austin, TX September 10, 2009 Steve Isser Vice President and General Counsel Good Company Associates
“Look Ahead SCED” Sai Moorty ERCOT November 28, 2011.
August 25, 2016 TAC Update to COPS
Current FRRS Language & Explanation of Posted Data
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
RTDF Overview of Data Analysis & Status of “Consesus Items”
Congestion Management and Ramp Rate for Delivering Ancillary Services
Principles of Participation in Real-Time Co-optimization
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
PDCWG David Kee, Chair Sydney Niemeyer, Vice Chair
Market Notice Regarding Off-line Units
David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy
Overview of New Control Room Desk
Paul Wattles, Sai Moorty ERCOT Market Design & Development
Texas Nodal Load Frequency Control (LFC) EDS 3 R6
30 Minute Reserves EPFSTF January 4,
Presentation transcript:

NSRS in Nodal Proposal for Deployment & Recall Procedures ERCOT ROS 10/12-13/2006 By: S.Niemeyer R.Jones R.Wheeler B.Green J.Dumas P.Breitzman

2 ISSUE & Background  At the August 10-11ROS meeting the PDCWG reported on a TAC assignment to define the proper procedures in Nodal for the deployment and recall of resources providing NSRS,  At that meeting Chair formed a small task force to examine Protocols (1) and recommend a set of procedural steps,  The small task force met on 9/14 and considered two written proposals (J.Adams- ERCOT & B.Green-GP&L),  B.Green’s proposal was selected by the task force and finalized.

3 What the Nodacols Say  Non-Spinning Reserve Service Deployment  (1)ERCOT shall deploy Non-Spinning Reserve Service using SCED for On-Line Generation Resources with Energy Offer Curves and by Operator Dispatch Instruction for Resources with Output Schedules, Off-Line Generation Resources and Load Resources. ERCOT shall develop a procedure approved by TAC to deploy Resources providing Non-Spinning Reserve Service. ERCOT operators shall implement the deployment procedure when a specified threshold(s) in MW of capability available to SCED to increase generation is reached. ERCOT Operators may implement the deployment procedure to recover deployed Responsive Reserve or when other Emergency Conditions exist.

4 Conditions Leading to NSRS Deployment #1) Detection of insufficient capacity for energy dispatch for future operations, #2) Disturbance Conditions: unit trip, sustained freq decay, sustained low freq ops., #3) SCED does not have enough energy available to execute properly, ---ISO Operator makes final decision and initiates deployment.

5  QSE gets a resource-specific instruction for off-line generation for NSRS with expected amount of capacity to be available and for how long, QSE must have resource on and ready for SCED base points asap, SCED will respond to changes in status via telemetry from QSE, resource must respond within 30 minutes, QSE will reduce NSRS A/S schedule to zero in COP and telemetry  Load resource will get instruction for MW level of energy deployed and duration of instruction, if bought by block then deployed by block, load must respond within 30 minutes  On-Line Generation w/energy offer curve will be notified of total capacity reserved for NSRS is being dispatched, ERCOT will auto calculate a new HASL for SCED by reducing the NSRS schedule to zero, QSE updates COP and telemetry parameters, resource must deliver in 30 minutes, Deployment Under Condition #1 [Detection of insufficient capacity for future operations]

6 Deployment Under Condition #1-cont’d [Detection of insufficient capacity for future operations]  On-Line Generation w/output schedule will get an instruction to deploy NSRS with energy amount and duration, DSR will adjust its output schedule in telemetry and COP, for non- DSR ERCOT will adjust the output schedule for operating period to show deployment amount.

7 Deployment Under Condition #2 [Disturbance Conditions]  The procedure for deployment will be the same as in Condition #1,  Determination of need will be driven by the A/S Capacity Monitor program executing every 10 seconds,  EECP processes may govern

8 Deployment Under Condition #3 [SCED has insufficient energy available to operate properly]  Same deployment procedure as Conditions #1 & #2,  Determination of need based on A/S Capacity Monitor, executing every 10 seconds,  SCED’s failure to converge initiates Emergency State, emergency processes will then govern deployment

9 Recall of NSRS Deployments  Deployed for each clock hour until HRUC sees a sustained capacity margin >8% of forecasted load demand,  Previously off-line generation resource allowed to ramp down at normal rate and trip off,  Previously on-line generation (w/offer curve) will stay on and restore NSRS A/S schedule and ERCOT will update its HASL prior to next SCED,  Previously on-line generation (w/output schedule) will stay on and back out NSRS amount from schedule [can be done incrementally],  Load Resource will restore NSRS capability and energy w/in 3 hours from deployment expiration or restore it from another resource.

10 Action Requested of ROS  Endorse the principles in the white paper and forward white paper to TAC for consideration as “homework completed”.