Automatic Gauging Tank System: A Next Generation Tool for UST PROF. HÉCTOR CRUZADO ENGINEERING MANAGEMENT PROJECT MEM 6200-SP-15 JOSÉ J. ROSA ROSARIO STUDENT.

Slides:



Advertisements
Similar presentations
Underground Storage Tanks at Duke Duke Medical Center –8 permitted USTs located on medical campus –Range in size from 2,000 gallons to 30,000 gallons Proper.
Advertisements

Ukraine, Кyiv, 2013 Presentation of LLC SERVICE-NS: Reliable and uninterrupted technical service of filling stations and petroleum storage depots, providing.
ANNUAL SPILL PREVENTION CONTROL AND COUNTERMEASURE TRAINING (SPCC) Presented by: Prepared for: Stephen F. Austin State University February 2, 2012.
Stuart East, 22 nd May 2012 Delivering industrial solutions for the fusion research community Stuart East.
NPMA Alan Watson Alexandria May 2012 Tank foundations Presenting
Managing Environmental Issues with Hospital Expansion Projects Tank, Generator, and Boiler Installations from an Environmental Permitting Perspective Chris.
Tank Leak Detection Alaska Spring 2004.
1 MASSACHUSETTS UNDERGROUND STORAGE TANK (UST) PROGRAM Baseline Compliance Assessment 1 MassDEP 8/2/2011.
November 14, 2003 Aboveground Storage Tank Enhanced Vapor Recovery.
RI DEM/Office of Technical and Customer Assistance slide 1 Underground Storage Tank Management Regulations for Commercial Heating Oil Tanks RI Department.
ACCA Legislative Conference Underground Storage Tank Compliance
Plans and Preparations for the PST Energy Act Investigations Texas Commission on Environmental Quality Environmental Trade Fair May 5-6, 2015.
Solano County Department of Environmental Management Environmental Health Services Division Hazardous Materials.
Integrity Testing of Aboveground Storage Tanks 2012 Southern Section AWMA Annual Meeting and Conference Andrew Covington, P.E.
OPERATOR, Tester & INSTALLER Licensing WWQRR, Chapter 17, Part L
Staying in Compliance Inventory Control Bill Greer GTEC.
MassDEP Underground Storage Tank Program Program Requirements for Third Party Inspectors Winter 2015 Workshops.
Reducing the Threat of Fuel Release from the Red Hill Fuel Storage Facility A Unique Engineering Challenge.
California Air Resources Board December 12, 2002 Enhanced Vapor Recovery Technology Review.
Georgia Environmental Protection Division Stage II Gasoline Vapor Recovery Decommissioning Workshop June 11, 2014 EPD Tradeport Training Room.
Matthew Udenenwu Waste Permits Division 2015 TCEQ Environmental Trade Fair.
California Air Resources Board Workshop November 3, th Street, Room 202 1:30 - 3:30 p.m. Aboveground Storage Tank Enhanced Vapor Recovery.
Student Book © 2004 Propane Education & Research CouncilPage Documenting Vapor Distribution System Installations Documenting your work.
Underground Storage Tank Compliance Act of 2005 Bill Torrey UST/LUST Regional Program Manager US EPA – New England EBCNE April 19, 2006.
Demonstration Testing l Purpose: Assurance that major monitors are able to detect a malfunction and illuminate the MIL with emissions below the malfunction.
Inspection Directions: An EMS Approach to Inspecting for Section 608 and 609 Compliance.
March Why is MassDEP proposing new UST regulations? DFS’s regulation: standards for tanks construction, installation, O&M, decommissioning and.
MassDEP Underground Storage Tank Program Program Requirements for Owners and Operators Winter 2015 Workshops 1.
Title V Operating Permits: A Compliance and Enforcement Tool Candace Carraway US Environmental Protection Agency Office of Air Quality Planning and Standards.
Module 8: Post-Construction Phase Post-Construction Phase BMP Monitoring BMP Maintenance Temporary BMP Removal After Stabilization BMP Reporting and Record.
IAEA International Atomic Energy Agency. IAEA Dr. Abraham Gregorio de Rosa,Sp.Rad Radiologist in HNGV Dili, Timor Leste 2 Perspectives on regulatory models.
Collecting Local Freight Data – Washington Potatoes Potato production identified by USDA data Supply chain and potato processors identified by State Potato.
Getting The Most Out Of Release Detection Testing National Tanks Conference 2015 Phoenix, Arizona September 15,
PRODUCT LINE LEAK DETECTION (including a summary of the 2015 UST regulations) Katie Seaborn AMERICAN CONTAINMENT SERVICES, INC. ® Annual GTEC Underground.
Staying in Compliance Inventory Control Bill Greer GTEC.
Environmental Factors In this module, we will discuss: Environmental legislation Environmental hazards Due diligence Conducting an environmental.
Joe Stapinski Senior UST Inspector (317)
Overview of 3 rd Party Inspection Program for USTs.
Outreach for the On-Call Hazardous Waste Site Investigation and Design Services Contract Caltrans D9 February 17, 2016.
| Excellence. Value. Get There!™ Aboveground Storage Tanks David L. Yaussy, Spilman Thomas & Battle, PLLC.
 To discuss MassDEP’s draft revisions to the following regulations:  Stage II – 310 CMR 7.24(6)  Stage I – 310 CMR 7.24(3)  Definitions – 310 CMR.
EXCALIBUR GROUP, LLC Evolving Regulations for USTs in New York For New York State August 1, 2013.
Leon Wirschem, REHS/HMS County of San Diego Department of Environmental Health Hazardous Materials Division
1 Final Rulemaking - Chapter 245, Administration of the Storage Tank and Spill Prevention Program (Subchapters A-H) Environmental Quality Board Meeting.
Things Aren’t Always What They Seem A Stormwater Pollution Prevention / Good Housekeeping Case Study in Western New York.
Veeder-Root Company Presents: EPA Compliance Basics Presenters: Bill Tobias, Director of Sales, Veeder-Root Carlton Knowles, Territory Sales Manager, Veeder-Root.
Leak Detection Equipment Tank Tightness Testing Overview Presented by C.J. Schultz Tanknology Inc.
Briefing on Proposed Amendments to Rules for Underground Storage Tank Management, Chapter August 1, 2017.
UST Inspection Program
Advanced Environmental Management (AEM) Training Phase I
2007 EPA Region 4 – Department of Defense – States Environmental Conference June 21, 2007 Atlanta, Georgia.
Underground Storage Tanks New Federal 2015 Requirements
Petroleum Storage Tanks – Program Updates
July 13, 2016 Department of Environmental Quality Proposed Amendments to UST Rules 15A NCAC 02N and 02O Ruth Strauss.
New Install Proposed rule changes
September 8, 2016 Department of Environmental Quality Proposed Amendments to UST Rules 15A NCAC 02N and 02O Ruth Strauss.
GTEC 2017 Annual UST Management & Compliance Assistance Seminar
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Operator Training.
COMPLIANCE CHALLENGES FACING OWNERS OF UNDERGROUND STORAGE TANKS
Alabama Tools Seminars
Collecting Local Freight Data – Washington Potatoes
2015 Federal UST Regulation Changes
SEQRA as a Tool to Review Energy Projects
Solano County Department of Environmental Management Environmental Health Services Division Hazardous Materials.
EPA Corrosion Study
Boiler Sheltered Initiative
COMPLIANCE VIOLATIONS FOUND DURING INSPECTIONS
Air and Water Management Association Regulatory Conference Symposium
Cupa violation Review BAESG Meeting May 20, 2019 Matthew Burge
Presentation transcript:

Automatic Gauging Tank System: A Next Generation Tool for UST PROF. HÉCTOR CRUZADO ENGINEERING MANAGEMENT PROJECT MEM 6200-SP-15 JOSÉ J. ROSA ROSARIO STUDENT NO

Agenda Introduction Literature Review Project Statement Methodology Analysis – ATG System Description Results Conclusion

Introduction Service Stations has underground storage tanks (UST) Contain gasoline and diesel products Subject to federal and state regulation Applies to UST, pipes and ancillary equipment

Literature Review The U.S. Environmental Protection Agency (USEPA) PR Environmental Quality Board (PREQB) Construction or installation, operation and maintenance Based in the Total Petroleum settlement announcement To evaluate the ATG system and oversee the alternatives Installation, operation and maintenance.

Project Statement EPA fine a company in Puerto Rico ATG system in 125 service station State of the art centralized monitoring system To identify the regulation and specification A conceptual installation, operation and maintenance programs

Methodology To achieve compliance with the regulation and the ATG system programs is necessary to: Review the actual federal and state regulations. Select an ATG system alternative. Estimate a conceptual cost and time for a service station. Propose an operation and maintenance inspection.

Analysis - ATG System Description

Results State regulation has primacy jurisdiction about UST UST Permit Modification submittal Installation is between $28,000 and $34,000. Contractor certified by the manufacturer. The estimated time two week.

Results Operator level C - Daily inspection / record keeping Product inventory control and leak detection Centralized monitoring system Software and internet connection.

Conclusion The automatic tank gauging for underground storage tanks can provide real time monitoring information improve regulatory compliance reduce the risk of a product release control product delivery through inventory management

Conclusion Perform a non-destructive leak detection test Centralized monitoring system for a network Adjust to the needs of the UST owner Promoted by the state and federal agencies. The installation cost $28,000 to $34,000.00

QUESTIONS? Automatic Gauging Tank System: A Next Generation Tool for UST

Thanks!!!!!