Baseline Technical Review – Central Region Accelerator Systems

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

20/03/2011 Global Design Effort 1 ALCPG11 – Eugene Positron Source N. Collomb J. Clarke, D. Angal-Kalinin,
Nick Walker Marc Ross Akira Yamamoto GDE PAC Prague TDR Plans and Scope.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Baseline Workshop Preparation At the close of each BAW, we would like to write down a summary that is based on our common understanding of the issues.
Discussion for Keep Alive Source /Auxiliary Positron Source KURIKI Masao Hiroshima U. /KEK 10/25/2011 ILC Technical Baseline Review, 2011, DESY 1.
Nick Walker Marc Ross Akira Yamamoto 2010 (and beyond) Plans & Milestones.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
27 Nov 07 VM Workshop Global Design Effort 1 ILC – Superconducting Linear Collider Marc Ross, Project Manager GDE Fermilab.
Status of ILC BDS Design Deepa Angal-Kalinin ASTeC/Cockcroft Institute, Daresbury Laboratory Andrei Seryi SLAC National Accelerator Laboratory ILC-CLIC.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
N.Solyak, RTMLALCPG 2009,Albuquerque, Oct.2 1 ILC RTML Upgrade in SB2009 Nikolay Solyak Fermilab.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
10/02/2011 Global Design Effort 1 Positron Source meeting J. Clarke, D. Angal-Kalinin, N. Collomb.
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions Ewan Paterson ADI Meeting July 2, ADI Meeting Ewan Paterson 7/2/15.
Status of RTML design in TDR configuration A.Vivoli, N. Solyak, V. Kapin Fermilab.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
For Layout of ILC , revised K.Kubo Based on following choices. Positron source: Prepare both conventional and undulator based. Place the.
ML (BC) Studies update Nikolay Solyak Arun Saini.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
28/03/20101 ILC – Central Integration SB 2009 Layout Interpretation of available data into CAD 3D virtual model to serve as true scale graphical representation.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
J.C. Sheppard, SLAC Americas Region February 7, ILC Source Systems Work Packages and EDR Discussions ILC GDE Meeting IHEP, Beijing, China J. C.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
Plan for the First Baseline Assessment Workshop (BAW-1) Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers to be discussed at GDE/ADI.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
K. Yokoya CRWG, ECFALC2016, KEK
Introduction and Meeting Objectives
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Integration Ideas for the Central Region Some old some new
Summary of WG2 :CFS for staging
Status and Plan of GDE Design Work (Including Road Map for RDR)
BAW Prep S1 Global Status Pilot Plant Status
Yamamoto WG3: ML-SCRF Parallel Session,
AD & I : BDS Lattice Design Changes
Technical Design Report preparation
Accelerator Physics Technical System Group Review
Cost Comparison of Undulator and e-Driven Systems
Electron Source Configuration
Linear Collider Positron Source Update
Nick Walker for the Project Management
ILC Cryogenics -- Technical Design Report Planning
Linear Collider Positron Source and Central Integration Update
Central Region Working Group
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Barry Barish Paris ICHEP 24-July-10
ILC - Global Design Effort
Presentation transcript:

Baseline Technical Review – Central Region Accelerator Systems Marc Ross, (Fermilab) Nick Walker, (DESY) and Akira Yamamoto (KEK) Baseline Design definition for TDR BTR Closing DESY 27.10.2011 Marc Ross, Fermilab

Review Structure Basic format for each AS Comprehensive review of design Survey of risk-related R & D Focus on identified key aspects CFS requirements Costs Stakeholders must contribute! BTR Closing DESY 27.10.2011 Marc Ross, Fermilab

Key aspects to BTRs Comprehensive review of proposed design Focus on changes with respect to RDR “change control” Attempt to make key design decisions where necessary Report R & D Review CFS requirements Review of cost Prepare baseline documents for EDMS Written BTR Report BTR Closing DESY 27.10.2011 Marc Ross, Fermilab

BTRs July 2011 INFN Frascati October 2011 DESY January 2012 KEK Damping Ring October 2011 DESY Electron source Positron source RTML (including bunch compressor) BDS / MDI Central region integration (general) January 2012 KEK Main linac and SCRF technology March 2012 CERN CFS (global) BTR Closing DESY 27.10.2011 Marc Ross, Fermilab

GDE Plenary meetings and Reviews - Schedule: Baseline Reviews Formalize Changes to 2007 Reference Design DESY (10.2011), KEK (01.2012), CERN (22-23.03.2012) GDE Plenary meetings: Korea Gyeongju (23-26.04.2012)  Cost information US Arlington Texas - LCWS (22-26.10.2012) TDR Workshop(?): Review, assemble, rework initial drafts Early summer, between plenary meetings BTR Closing DESY 27.10.2011 Marc Ross, Fermilab

2012 - ILC TDR: Two Volumes R & D: A description of the global risk-mitigating R & D program carried out during the Technical Design Phase. Must include enough detail to support design changes and improvements made to the 2007 Reference Design for the new Baseline. Design: A definitive description of the Baseline Design (similar in scope and expository tone to RDR) BTR Closing DESY 27.10.2011 Marc Ross, Fermilab

TDR  RDR AS: CFS: Beam Test Facilities R & D Both in Vol. 1… but Vol. 2 must describe the effect of R & D on the design CFS: Mostly new Substantial investment, to be reflected in a new design and improved cost estimate Site-specific adaptation of the design  important BTR Closing DESY 27.10.2011 Marc Ross, Fermilab

TDP Accel. System R & D (Central region) BDS: Atf2 travelling down the convergence slope. e+: Flux concentrator Target e-: Gun RTML: Emittance growth Phase tolerances MDI BTR Closing DESY 27.10.2011 Marc Ross, Fermilab

DESY BTR Action List this is the footer text

Definition of lattice treaty points Source (e-) to DR (e-) DR (e±) to RTML (e±) RTML (e±) to Main Linac (±) Main linac (e-) to e+ source  needed e+ source to BDS e+ source to DR (e+) Main Linac (e+) to BDS (e+)  needed ? this is the footer text

Main Dump Physical space required for dump Shielding requirements Integration into BDS CFS solution ... this is the footer text

Integrated lattice design Move DR transfer tunnel - BDS branch point upstream of Main Dump location Adjustment of initial spin angle (PLTR/ELTR) and subsequent geometry, DR location etc Cost impact Solution/Requirements for RTML to match current CFS Main Linac cross section this is the footer text

Review Central region tunnel solutions Service tunnel solution Transverse tunnel sections ... this is the footer text

CFS (general) Produce list of lasers and their locations Gun Polarimetry (BDS) Profile monitors this is the footer text

5 GeV SCRF Booster Linacs Review choice of gradient etc. Rating to include current ‘overhead’ x1.5 Choice of HLRF and its layout in the tunnels Not KCS Cryogenic supply and transfer lines ... this is the footer text

e+ source specific Remote handling requirements and shaft requirements Reduced Field FC as TDR baseline Spin flipping system Evaluate space requirements; include space in LTR Understand tolerances and systematics this is the footer text

Check heat-load for capture RF @ 10Hz ... e- source specific Check heat-load for capture RF @ 10Hz ... this is the footer text

Accelerator Parameter Table Updates Update e+ parameters for reduced field FC DR acceptance 5GeV booster parameters (incl. over-production) Check energy spreads (two-stage compressor) Consolidate LET emittance growth table ... This is outstanding for over a year. Talk to Nikolay and Kubo about the status. Was it every completed?This is outstanding for over a year. Talk to Nikolay and Kubo about the status. Was it every completed? this is the footer text

Compressor Assume two-stage for TDR baseline Consolidate CFS criteria Subject to re-evaluation Consolidate CFS criteria Energy acceptance of extraction lines Large energy-error beams Cryomodule focusing magnet ... I'm guessing Vic & Co have been working on the SB2009 assumption for a single-stage. All of this work will need to be reverted to RDR.I'm guessing Vic & Co have been working on the SB2009 assumption for a single-stage. All of this work will need to be reverted to RDR. Needs review. Also needs discussion of what the acceptance requirement should be. This depends on commissioning, tuning and fast abort scenarios.Needs review. Also needs discussion of what the acceptance requirement should be. This depends on commissioning, tuning and fast abort scenarios. this is the footer text

FD integration Polarimetry – near RTML? Detector / MDI Issues FD integration Polarimetry – near RTML? this is the footer text

Aux. e+ source Assume Kuriki style for TDR baseline 500 MeV s-band linac incorporation of thick target: ‘MOSAIC’ to be studied ... Understand how the source can best be used this is the footer text

Operations and Commissioning Study Need to form a task force: Charge? Review of dumps, diagnostic stations etc. Early commissioning Machine development possibilities this is the footer text

Dumps:; bandwidth CFS List (11.2009): Any lost dumps? E+ fast abort 11 KW Bandwidth requirement Linac bandwidth: low end 50% E_0 BTR Closing DESY 27.10.2011 Marc Ross, Fermilab

CFS agenda for Cern BTR: Mountain Region Site development BTR Closing DESY 27.10.2011 Marc Ross, Fermilab

Friday, 28 October, 2011 Central Region CFS Integration To be discussed: 09:00 – 11:00 and 14:00 – 15:30   From the Review: Discrepancies and inconsistencies Layouts: EDMS (Benno), US CFS drawings, beamline schematics Dumps: location, usage scheme and capacity. Footprint. 10 Hz Source operation – dump scheme. Tunnel enlargement profile: location of step changes, total volume. Transverse space requirements Installation strategies for key components: HLRF and cryomodules Critical support subsystems: HLRF, Cryo, lasers and magnet power Service tunnel space usage (equipment types, totals and footprint) Visit to Virtual Reality Room Detector Hall: 11:00 - 12:30 Shaft strategy Utility requirements

DESY BTR – 27.10.2011 Reduced Field FC as TDR baseline Two-stage for TDR baseline Auxiliary Source with Kuriki parameters Booster HLRF Rating to include current ‘overhead’ x1.5 Booster HLRF not KCS BTR Closing DESY 27.10.2011 Marc Ross, Fermilab