ELECTRICAL PLANT DIMENSIONING

Slides:



Advertisements
Similar presentations
© Abb Control Ltd - 1 ABB Protection - Overload What do we mean by a fault? Overload Operating condition in an electrically undamaged circuit which causes.
Advertisements

Earthing systems, Harmonics Currents and GFP
Co-ordination of LV Protection Devices
Earthing systems, Harmonics Currents and GFP
ENERGY CONVERSION ONE (Course 25741)
EE4503 Electrical Systems Design
Inspection & Test Overview suite412.
CIGRE 7-10 September 2009, Moscow
Power System Analysis/ Power System 1 EEE 4113/ EEE 3131
Circulating Current – load switch open. Circulating Current load switch closed.
1 Seventh Lecture Error Analysis Instrumentation and Product Testing.
Unit Transformer Unit transformer are step up transformer which is connected to generating house & step up voltage from 15kV voltage to 132 voltage level.
Bonding, Grounding and the NEC  Presented by The National Association of Certified Home Inspectors
Discrimination of protection devices on installations
Overvoltage protection (surge arrester)
Incident Energy Study Christian Brothers University MAESC CONFERENCE Jermichael Beaver, Bruce Luong, David Temple, and John Ventura.
Electrical Installation 2
Electrical Contractor
Dimensioning and Protection of PV Plants with examples of design
Assumption University Thailand EE4503 Electrical Systems Design Main Circuit 1.
Chapter 13 Magnetically Coupled Circuits
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
Will This Work?. Electric circuit Your challenge: Given a lightbulb holder, a battery holder, a lightbulb, a switch, and connecting wires, make the.
Consumer’s Main Switchroom & Main L.V. Switchboard
November 4, 2013 Topic: Electric Circuit Objectives:
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
ECE498HZ: Power Distribution System Analysis
Lecture 09Electro Mechanical System1 Chapter 11 Special Transformers.
Per-Unit System.
SARDAR VALLABHBHAI PATEL INSTITUTE OF TECHNOLOGY PREPARED BY: 1)BALDIWALA ALIABBAS ( ) 2)PARTH GUPTA ( ) 3)ANIL KHATIK ( )
REDA Production Systems
OEZ s.r.o. Quick and universal solution for your order Modeion 05/2012.
DC Machine & Transformer
 The figure below shows a protection system for a transmission line, consisting of a CT, PT, a relay and its associated circuit breaker.
Lesson 12: Parallel Transformers and Autotransformers ET 332b Ac Motors, Generators and Power Systems 1 Lesson 12_et332b.pptx.
Power Factor Correction The Definitive power solution
TRANSFORMERS.
Motor Protection Dr. Hendro Rijanto.
Protection of Power Systems
Lesson 10: Transformer Performance and Operation
2011+ NEC Article Arc Energy Reduction. Where the highest continuous current trip setting for which the actual overcurrent device installed.
Management Of Tulkarm Electrical Network
BASIC ELECTRICAL TECHNOLOGY DET 211/3
Module B3 More on Three Phase Analysis
Electric Machine Transformers
Per-Unit System.
LV Safe Powering from UPS to Clients
K. J. I. T institute of engineering 3-PHASE TRANSFORMER. PREPARD BY:-
ELECTRICAL INSTALLATION AND MAINTENANCE (EIM) 5 INSTALL ELECTRICAL PROTECTIVE DEVICES FOR DISTRIBUTION, POWER, LIGHTING, AUXILIARY, LIGHTNING PROTECTION.
High Voltage Power Circuit Breakers
ELECTRICAL POWER-II Electrical engineering sixth semester
Calculations: Transformers and Service Conductor Calculations
Exercise 8 Power systems.
Transformer Impedance
Overcurrent Protection— Fuses and Circuit Breakers
EET 323 – Electrical System Design Lecture 9: Grounding
EUS 260 Capstone Project.
Exercise 8 Power systems.
Reduce Arcing Time – Bus Differential
Module B4 Per Unit Analysis
The instantaneous power
Its strengths, your benefits
Electrical components and systems
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
Exercise 9 Power systems.
Substation Equipment's
Presentation transcript:

ELECTRICAL PLANT DIMENSIONING CIRCUIT BREAKER SELECTION

Protection of transformers Generalities As to be able to protect LV/MV transformers LV side, we must mainly take into account: rated current of the protected transformer, LV side, from which the rated current of the CB and the setting depend (In); the max estimated short circuit current in the installation point which defines the minimal breaking power of the protection circuit breaker (Isc).

Protection of transformers MT-BT switchboard with one single transformer Sn In Isc U20

Protection of transformers The rated current of the transformers LV side is defined by the following expression where Sn = rated power of the transformer [kVA] U20 = rated secondary voltage (no load) of the transformer [V] ln = rated current of the transformer, LV side [A] In = Sn x 103 3 x U20

Protection of transformers The full voltage three-phase short circuit current immediately after the LV side of the transformer can be expressed by the following relation once we suppose infinite power at the primary: where Ucc % = short circuit voltage of the transformer [%] ln = rated current, LV side, [A] lsc = three-phase rated short circuit current, LV side, [A] Isc = In x 100 Ucc %

Protection of transformers The short circuit current is normally lesser than the preceding deduced values if the CB is installed at a certain distance by means of a cable or bar connection, according to the connection impedance.

Protection of transformers Choice of the circuit breaker The following table shows some possible choices within the SACE Emax ACB range according to the characteristics of the CB to protect. Attention Those indications are valid at the conditions that we declare in the table; different conditions will lead us to repeat calculations and modify the choices.

Protection of transformers Sn [kVA] 500 630 800 1000 1250 1600 2000 2500 3150 Ucc (1) % 4 4 5 5 5 6,25 6,25 6,25 6,25 In (2) [A] 722 909 1154 1443 1804 2309 2887 3608 4547 Isc (2) [kA] 18 22.7 23.1 28.9 36.1 37 46.2 57.7 72.7 SACE Emax E1B08 E1B12 E1B12 E2B16 E2B20 E3B25 E3B32  E4S40 E6H50 (1) For values of the percent short circuit voltage U’cc% different from the Ucc% values as per table, the rated three-phase short circuit current I’cn becomes: (2) The calculated values refer to a U20 voltage of 400 V. for different U’20 values, do multiply In and Isc the following k times: I’sc = Ucc % U’cc % Isc U’20 [V] 220 380 400 415 440 480 500 660 690 k 1.82 1.05 1 0.96 0.91 0.83 0.8 0.606 0.580

Protection of lines The choice of the circuit breakers for switching and protection of the lines means the perfect knowledge of: rated operating line current lB max admissable cable current lZ presumed short circuit current in the point of installation of the circuit breaker Icc

Protection of lines The correct circuit breaker must be apt to satisfy the following conditions: it must own short circuit breaking power (lcu or eventually lcs) greater or equal to the short circuit current lcc it must use a protection release so that its overload setting current ln (l1) satisfies the relation lB < ln < lZ the let through energy (l2t) that flows through the circuit breaker must be lesser or equal to the maximal one allowed by the cable (K²S²)

Protection of lines As far as the verification required by the IEC 364 standard, according to which the overload protection must have an intervention current lf that assures the operation for a value lesser than 1,45 lz (lf < 1,45 lz), we must state that it is always verified for SACE CBs since those are IEC 60947-2 standard compliant and the value is less than 1,3 ln.

Primary and secondary distribution Selective protection A B C

Primary and secondary distribution The example emphasizes the need of co-ordination of the intervention between the two A and B circuit breakers so that, in case of fault in C, only the B circuit breaker trips, thus leaving complete continuity to the rest of the plant supplied by the circuit breaker A.

Primary and secondary distribution Selectivity might be total or partial: total selectivity: only the circuit breaker B trips for every current value lesser or equal to the max short circuit current foreseen in C; partial selectivity: the circuit breaker B opens only according to fault current lower than a certain value; values that are equal or greater than this will give the intervention of the two A and B circuit breakers

Primary and secondary distribution Amperometric selectivity is obtained by setting on different values the instantaneous tripping currents of the circuit breakers’ chain (greater values for upstream circuit breakers)

ImA is the selectivity limit ! Primary and secondary distribution A B ImB ImA ImA is the selectivity limit !

Primary and secondary distribution Chronometric selectivity is obtained by introducing intentionally always greater delays in the intervention tripping timings of the upstream circuit breakers in the chain.

Primary and secondary distribution Total selectivity

Primary and secondary distribution Switchboard A Switchboard B 400V 2500 kVA (fault current 57,5 kA) E2N20 MS (disconnector) E4S40 with PR112 E2N20 with PR111 T5H 630 with PR222

Primary and secondary distribution

Primary and secondary distribution Back-up protection A B C

Primary and secondary distribution In the figure, the circuit breaker B, downwards in respect with A, might have a short circuit breaking capacity lesser than the presumed short circuit current in case of fault in C if the circuit breaker A satisfies at all the two following conditions: it own correct short circuit power (greater or equal to the presumed short circuit current in its installation point and obviously greater than the short circuit current in C) in case of fault in C with short circuit values greater than the short circuit breaking capacity of circuit breaker B, the circuit breaker A must limit the let through energy by tapering it to a correct value than can be stood by the circuit breaker B and by the protected lines

Primary and secondary distribution The back-up protection is to be used in electric plants where operation continuity is not a main need: that is the tripping of an upstream circuit breaker will include in the black-out also those parts of the plant that are not interested in the faulty current. This co-ordination solution is used by those who need to contain the plant costs by reducing the general performance in case of fault.

Primary and secondary distribution Co-ordination table for back-up protection Upstream circuit breaker Short circuit breaking capacity E2L - E3L 130 [kA] (@ 380/415 V) Downstream circuit breaker Breaker capacity on back-upped loads T4N 65 [kA] T4S - T5N - E1B - E2B 85 [kA] T4H - T5S - T5H - S7H - E2N 100 [kA]

Back up protection application example T4L 250 100 kA !!! T1N 160 T1N 160 T1N 160 * T1N 160 is 36 kA only mccb

Solution for selectivity S6L 800 100 kA T4L 250 T4L 250 T4L 250

Selectivity Table