Energy Audit Process For Data Centers Len Kientz
Advertisements

High Performance Buildings Congressional Caucus Coalition April 11, 2012 Washington, DC Bruce D. Hunn ASHRAE.
Building Commissioning. What is building commissioning? Building commissioning is a systematic and documented process of ensuring that the owner’s operational.
OPPORTUNITIES FOR BUSINESSES TO DIRECTLY IMPROVE THE BOTTOM LINE THROUGH ENERGY EFFICIENCY 3 rd May 2010 Kees Brinkman Managing Director.
ASSESS TARGET DELIVER MEASURE Understanding Building Energy Audits Joe Hofstetter P.E., CEM, LEED AP Karpinski Engineering.
Heat Recovery for Commercial Buildings
By: R.M. Chitranshi. ECBC With the background of high energy saving potential and its benefits bridging the gap between demand and supply, reducing environmental.
1 Cost-Effectiveness Screening Issue for RTF August 30, 2007.
Objectives Finish with ducts and fans Define project topics.
LESSONS LEARNED ON GOING GREEN Kevin Meikle, Architect Airports Planning Manager 4995 E. Clinton Way Fresno, Ca (559)
CODE Project WP3 – Modelling support for cogeneration across the EU27.
Integrating a Saving Energy controller in Existing Air Condition units Case Study.
The Role of Tenant and Property Operations in Implementing Sustainable Practices Public Building Services October. 17, 2007 Om Taneja PBS Tenant and Property.
ENERGY SOURCES. ALTERNATIVE ENERGY SOURCES Geothermal Energy comfort… savings... environment.
Upstate Energy Expo 2010 NYSERDA Program Overview March 30, 2010 Cheryl Glanton, Project Manager.
Steve Craker K-12 Team Lead Geoff Overland IT and Data Center Focus on Energy Increase IT Budgets with Energy Efficiency.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
Green Buildings in Thailand
Energy Efficiency Office, EMSD
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
ECE 7800: Renewable Energy Systems Topic 12: Economic Analysis of Renewable Energy Systems Spring 2010 © Pritpal Singh, 2010.
IntelliCon ™ Product Line Manufactured by Intellidyne, LLC Distributed by: IMC.
Green Building Demonstration Project Adam Saling City of San Diego.
Chilled water Meyrin consolidation Study 1 st Part Many thanks for their contribution to: Pasquale Alemanno, Fortunato Candito, Alexander Putzu.
SectorAnnual Consumption (2011) GWh Large & medium (Industry & Commercial)4677 Small (Industry & Commercial)1167 Religious95 Domestic3980 Street Light105.
Smartcool Systems Inc. Providing effective and reliable energy efficiency solutions for HVAC-R customers around the globe.
Name of Building(s) or Project Speaker(s) Organization(s)
ERES 2010 Arch. Simone Spreafico Engagement Director, Investment, Engagement Director, Investment, Advisory & Valuation Division Advisory & Valuation Division.
N O R T H A M E R I C A C O M M E R C I A L TDP
N VAV system varies the air quantity rather than temperature to each zone n Single main duct is run from AHU n Branch duct are run from this main through.
Retrocommissioning Program UBS 677 Washington Blvd, Stamford, CT.
Learning, our way Daikin Europe, Consulting sales section1 Understanding Client’s Needs and best Daikin solution.
ELECTRICITY COST OF CHILLER AND COOLING TOWER PUMPS KILLING YOU? We Have The RIGHT Solution just for YOU! + =
Introduction to Energy Management Doty, Steve & Turner, Wayne. (2009). Energy Management Handbook. Lilburn, GA: The Fairmount Press. Jacobsen, J. (2011).
Week 9 Common Commercial Building energy efficiency measures (Energy Management Opportunities)
Announcement Course Exam November 3rd In class: 90 minutes long Examples will be posted on the course website.
Objectives Learn about Fans Discuss: Exam (I will have an extra office hour on Monday at 8:00 am) Final Project (I need your group member lists till tomorrow).
Energy Auditing – Energy Conservation and Efficiency Measures PRESENTER Mr. A. Hamukale BENG, Meng,MBA,PEEIZ,REng.
Town of Woodbridge Beecher Road School Infrastructure & Energy Upgrade Presentation to Board of Education December 17 th, 2012 AKF John B. Rice, PE, LEED.
Building Introduction & Thesis System 4: Central Geothermal System 1: Industry Standard System 2: Design System System 3: Domestic Geothermal Original.
Presented to The Raymore Peculiar Schools Board of Education Van McLain Energy Educator/Manager February 26 th, 2007Energy Management Conservation Program.
Emirates Central Cooling Systems Corporation Presented by: Samer khoudeir Chief Sales & Marketing Officer.
GSAS Certification & Consultants in Qatar
Best LEED Training in Qatar
Changing the way the world cools…now in India!
Professional MEP Training in Chennai
Innovative Engineering Solutions Providers
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
27-28 April 2015 Eng. Mubarak Yusuf Al-Kawari Presented by:
SMECO Demand Response filing
2016 Maintenance Innovation Challenge
Seminar On Energy Audit Submitted To: Submitted By:
Lecture Objectives: Discuss Final Project
INNOVATIVE FINANCIAL INSTRUMENTS TO SUPPORT ENERGY EFFICIENCY:
Thermal Energy Storage
The ESCO Retrofit Model Financing energy efficient HVAC improvements through ESCOs Stephane le Gentil - November 2017.
NEW PRICING FOR LEED PROJECT REGISTRATION
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
MEP & Stress Analysis Services in India
Professional LEED Green Associate Training Developed By Green Building Academy.
Stress Analysis Service Provider & BIM Service
Best IGBC AP Exam Training in Doha
LET’S KNOW HOW TO ACHIEVE THE LEED CERTIFICATION MANAGEMENT Most of the building construction projects are working on to get the green level certification.
Lecture Objectives: Answer questions related to HW 4
Energy Efficiency in District Coiling System
District Cooling – A GCC example
Lecture Objectives: Discuss HW4 parts
Dynamic Chiller Optimization The Next Level of Retro-Commissioning
Energy Management Introduction Rantharu Attanayake BSc. (Eng), MSc, MBA EE – Energy Management Mobile :
Presentation transcript:

Conserve Green Building & MEP Solutions Conserve Green Building & MEP Solutions WLL Office No: 6, 6th Floor, Building Number: 24, Al Khalidiya Street, Najma, Doha, Qatar. P.O. Box: T: | F: |

Initial and Operational Cost of different Air Conditioning Systems in GCC: A supporting case for VRF Systems  In one of our recent projects targeting GSAS Certification, we have advised the client to change the HVAC system from Split to VRF.  The client asked us about the return of investment and payback period. We have worked out on the initial and operational cost for different AC systems.  We are publishing the basis of calculation, so that it can guide other projects pursuing LEED or GSAS Certification to choose the right system. GSAS Certification

In this article we will discuss 1.Installation cost of different AC systems 2.Energy Performance of different AC systems 3.Financial analysis of VRF over air cooled central system and split/package system 4.In what cases the projects can go for VRF systems Air Conditioning System TypePrice in QAR per Nominal TR Ductless Wall mounted/Ceiling mounted split system Ducted split units Package Units VRF Units Air Cooled chilled water systems Water cooled chilled water systems Installation cost of different AC systems: LEED Certification

Note:  The prices can vary based on the manufacturer, project specifications, Air distribution system etc.  The prices mentioned here only approximate based on interview with different manufacturers and contractors. In the absence of much literature on Energy performance of different AC systems in the region, the study recently conducted by RSB Dubai appears to be very close and hence we will consider the same for our calculation 2.Energy Performance of different AC Systems:

Energy Audit

It is very clear that district cooling plants are the most efficient followed by water cooled central cooling system. S.NoSystem typekW/TRInstallation Cost QR 1Split/Window Ducted Split/Package Package VRF Air cooled chiller Water cooled chiller District Cooling VRF Vs. Split System Cost Vs. Benefit

Equivalent full load hours3750 Installed Nominal TR500 Electricity Tariff0.35 Energy Consumption of split units kwh Energy Cost of split units QAR/annum Initial Cost of split units in Million QAR1.375 Initial cost of VRF Units Million QAR2.9 Additional Investment in VRF Million QAR1.525 Energy Consumption of VRF system kwh/annum Savings in kwh/annum in VRF Savings in Million QAR/Annum in VRF Simple payback period4.225

1.Financial analysis of VRF over air cooled central system and split/package system Air cooled Central AC System:  The prices of Air cooled system and VRF systems are very much similar hence there is no incremental capital cost for the project.  The operational cost VRF system is lesser resulting in significant reduction in Life cycle cost of the AC system Energy Conservation

Let us do the math for 500 TR building,  Energy Consumption in Central Air Cooled System per annum = 500 TR * 3750 Equivalent Full load operational Hrs. * 1.42 KW/TR = kWh  Energy Cost = kWh * 0.35 QAR/kwh =  Energy Consumption in VRF System per annum = 500 TR * 3750 Equivalent Full load operational Hrs. * 1.07 KW/TR = kWh

 Energy Cost per annum = kWh * 0.35 QAR/kwh =  Savings per annum = kWh  Considering the life of the equipment to be 10 years, the life cycle cost savings shall be 2.3 Million QAR. Split Air Conditioning System:  The prices of split or package shall be around lesser by QR 2500/TR compared to VRF systems.  Let us do the math again for 500 TR building,  Incremental Cost = 500 TR * QR 2500/TR = QAR 1.25 Million

 Energy Consumption in split or ducted AC system per annum = 500 TR * 3750 Equivalent Full load operational Hrs. * 1.62 KW/TR = kWh  Energy Cost = kWh * 0.35 QAR/kwh =  Energy Consumption in VRF System per annum = 500 TR * 3750 Equivalent Full load operational Hrs. * 1.07 KW/TR = kWh  Savings per annum = kWh  Simple payback period = Energy Consumption

In the next article we will discuss more about commercial aspects of Energy Conservation Measures like Life cycle cost, Net Present Value (NPV) and Internal rate of Return (IRR) which is useful in Energy Audit.Energy Audit. Factors to be taken care when going for VRF System: 1.Limitation in refrigerant pipe length 2.Integration with conventional BMS system 3. Skilled maintenance.

Summary and conclusion:  If the project is evaluating VRF against Air Cooled chilled water system and if there is feasibility of VRF systems.  The straight choice would be to go for VRF system  If the project is evaluating VRF against split units the decision has to be taken based on financial priorities. Thank You

Conserve Green Building & MEP Solutions WLL Office No: 6, 6th Floor, Building Number: 24, Al Khalidiya Street, Najma, Doha, Qatar. P.O. Box: T: | F: |