Piero Belforte, HDT, MERITA project 2000: objectives, activities and results by Carla GIACHINO .

Slides:



Advertisements
Similar presentations
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Advertisements

Software Project Management
EURIDICE project Evaluation of image database use in online learning environment 11/
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill Technology Education Copyright © 2006 by The McGraw-Hill Companies,
APPLICATION DEVELOPMENT BY SYED ADNAN ALI.
COMP8130 and 4130Adrian Marshall 8130 and 4130 Test Management Adrian Marshall.
CS405 Systems Development Life Cycle 1. Traditional Project Phases Wild Enthusiasm Growing Concern Mounting Terror Resigned Fatalism Persecution of the.
Mind Board Company Profile Company Profile. Meets the challenge of Meets the challenge of creating complex designs PCB DESIGN CENTER.
Effective Methods for Software and Systems Integration
AWARE PROJECT – AGEING WORKFORCE TOWARDS AN ACTIVE RETIREMENT Alberto Ferreras-Remesal Institute of Biomechanics of Valencia IFA 2012 – Prague – May 31th.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 1 Mobile Terminals S.p.A. Telit.
ERP Lifecycle.
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
Capability Maturity Model Part One - Overview. History Effort started by SEI and MITRE Corporation  assess capability of DoD contractors First.
Describing Methodologies PART II Rapid Application Development*
Knowledge and Networking Support to Phase 3 NetFutures, 25 th March 2015 Zsuzsanna Bodi European Network of Living Labs (ENoLL)
From Research Prototype to Production
Multi-agent Research Tool (MART) A proposal for MSE project Madhukar Kumar.
Expert Group for Virtual Reality in Transport, Manufacturing and Logistics Virtual Reality in Transport, Manufacturing and Logistics VIRTUAL REALITY IN.
2Object-Oriented Analysis and Design with the Unified Process The Requirements Discipline in More Detail  Focus shifts from defining to realizing objectives.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
E-PreS: Monitoring and Evaluation of Natural Hazard Preparedness at School Environments Stathes Hadjiefthymiades National Kapodistrian University of Athens.
Jump to first page (c) 1999, A. Lakhotia 1 Software engineering? Arun Lakhotia University of Louisiana at Lafayette Po Box Lafayette, LA 70504, USA.
TIPEIL LLP-LDV/TOI/07/IT/019 First Transnational Workshop Athens, 7-8 February 2008 Venue: IEKEP - 34A Averof str. in Nea Ionia 1 st floor DISSEMINATION/VALORISATION.
Proposal Presentation Prepared by: Condor Technology Solutions, Inc. August 24, 2000.
RISK AWARE TITLE : RISK – Advanced Weather forecast system to Advise on Risk Events and management ACRONYM : RISK AWARE Duration: 36 months Status: Running.
GREG CAPPS [ ASUG INSTALLATION MEMBER MEMBER SINCE:1998 ISRAEL OLIVKOVICH [ SAP EMPLOYEE MEMBER SINCE: 2004 GRETCHEN LINDQUIST [ ASUG INSTALLATION MEMBER.
INFSO-RI NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, June 2009.
Graphical User Interface and Job Distribution Optimizer for a Virtual Pipeline Simulation Testbed Walamitien Oyenan October 8, 2003 MSE Presentation 1.
I Copyright © 2007, Oracle. All rights reserved. Module i: Siebel 8.0 Essentials Training Siebel 8.0 Essentials.
Very-Near-Field Solutions to Far-Field EMC Problems EMxpert Pre-Compliance EMC Testing Advanced Embedded Systems September 09, 2015.
Work Package 6 L2C Kick-off meeting Fontainebleau, March 7th 2006.
Modern Systems Analysis and Design Third Edition Chapter 11 Selecting the Best Alternative Design Strategy 11.1.
Timesheet training Version: Introduction Duration: 1.5 hours Purpose: Guide on how to use Timesheet.
BizForceOne by MegaSolutionCenter (MSC), USA BIZFORCEONE OPERATING SYSTEM BEST FIT IMPLEMENTATION.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Project Management The much neglected art of running a project to a successful completion 15/07/2016(C) Management Expert Academy1.
Piero Belforte, 1999 H.D.T. Italia S.r.l. PRESENTATION Emmanuel LEROUX Chief Application Engineer.
Piero Belforte, HDT 1999:OMEGA 2 MEETING ETH AEROSPATIALE MATRA ZUKEN-REDAC TURIN MAY 6,
Piero Belforte, HDT, April 14, 2000, RISIP Project Radiated Immunity Simulation for Industrial Processes by Mariateresa Cosso.
Piero Belforte, HDT, April 14, 2000 RISIP: Radiated Immunity 3-D Simulation for Industrial Processes 1 RISIP methodologies and software solutions.
Piero Belforte, HDT, July 2000: MERITA Methodology to Evaluate Radiation in Information Technology Application, methodologies and software solutions by Carla Giachino,
Piero Belforte, HDT. Year 2000, RISIP Project : objectives, activities and results by Razvan Ene.
MERITA Project, Bull 1999, QUADRIPROCESSOR SERVER SYSTEM DESCRIPTION, 260 MHz clock.
Piero Belforte, HDT, MAGNETI MARELLI 1999: PREDICTION OF PCB SUSCEPTIBILITY TO CONDUCTED NOISE AT POST-LAYOUT LEVEL
4 Chapter 4: Beginning the Analysis: Investigating System Requirements Systems Analysis and Design in a Changing World, 3 rd Edition.
Product Lifecycle Management
WP8: Demonstrators (UniCam – Regione Marche)
Planning Interactive Multimedia
EO Applications Parallel Session
Rapid Application Development
Kevin Madden Senior Technical Design Director
James A. Senn’s Information Technology, 3rd Edition
Eleanor Roosevelt High School
Flooding Walkdown Guidance
System Development Life Cycle (SDLC)
Important Software Performance Testing That Ensure High Quality Solutions.
OVERVIEW Debate in engineering design community: Should design be taught as: Establishing a foundation of theory? or Engaging students in loosely supervised.
Engineering Processes
ENTSO-E Transparency Platform Vision Project
CLINICAL INFORMATION SYSTEM
RECARE set-up Rudi Hessel on behalf of coordination team
MANAGING THE DEVELOPMENT AND PURCHASE OF INFORMATION SYSTEMS
Automating Profitable Growth™
KICK OFF meeting - project presentation
ENabling SafE Multi-Brand Platooning for Europe
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
R&D Tax Incentive ATY Advisory.
Financials in Microsoft Dynamics SL 2015.
Presentation transcript:

MERITA: objectives, activities and results Carla GIACHINO H.D.T. Italia s.r.l.

ESPRIT E.S.D. The European Initiative for the Spread of Best Pratice in Design PROJECT N MERITA

MERITA Methodology to Evaluate Radiaton in Information Technology Application TECHNICAL PRESENTATION

MERITA Effort in person months: –Bull IT: 24 p/m – H.D.T Italia: 14.5 p/m Type of the project: Demonstration project Duration: fithteen months May 98 to July 99 Project team: Bull IT S.p.A prime contractor: end-user H.D.T Italia s.r.l partner: software tool vendor

MERITA General overview Bull IT designs Unix Platforms with Risc Processor: –clock frequency>100 MHz In order to prevent some EMC problems: –prediction of radiated emission due to component current loop –Filtering optimization

MERITA Objectives Show the viability of a prototype tool, named PRESTO_POWER ver. 1.1 to perform: –predictive analysis and screening of EMC problems on PCB –extraction, analysis, improvement of critical paths –experimental validation of the tool Integration with the design methodology inside Bull IT

MERITA Main results Improvement of the design and analysis of PCB in IT application Product control at each development phase Viability of the prototype tool PRESTO_POWER test on an actual case

MERITA Project chart

MERITA Task 1: State of the art Objective: –knowledge of market solution & comparison with HDT Description: –prototype tool installation –training courses on SI, EMC, HDT methodology & products –case study demonstrated by HDT technical support Delivered result: –list of the tool advantages\disadvantages

MERITA Task 2: User’s requirements Objective: –list the user’s requirements on EMC to define a new methodology inside the company design flow Description: –EMC and methodology experts define the requirements of the prototype tool Delivered result: –list of requirements

MERITA Task 3: Prototype tool test & improvement Objective: –having a tool overcoming the identified problems identified during the testing phase Description: –several simulations have been run on a test board to: optimize the test board layout test the tool acting on its front end

MERITA Task 3: Prototype tool test & improvement (con’t) –this permits to: remove bugs fit the prototype tool improve the user interface through the user suggestions Delivered results: –list of bugs and features to be improved –comparison between simulations & measurements

MERITA Task 4:Test board realisation and comparison Objective: –Test of the prototype tool on an actual board Description: –The project team tested the software on an actual board and made comparison between measurement and simulation results Delivered result: –Report on comparison between measurement and simulation

MERITA Task 5: Design flow integration Objective: –definition of the prototype tool in the Bull methodology Description: –PRESTO_POWER inside Bull methodology –it is linked to the existing CAD/CAE methodology Delivered result: –PRESTO_POWER is included in the Bull methodology

MERITA Task 6: Dissemination Objective: –transfer the experience Description & delivered result: –prepare articles to be published on magazines –prepare papers for international symposium –create a mailing list of potential customers –prepare a brochure of PRESTO_POWER –present the results in a seminar –prepare the final report to submit to UE