Maintenance and Efficiency

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
Advertisements

Maintenance and Accelerator Support RHIC Run 12. RHIC species change completed: Major works in RHIC: Major works in RHIC: Power supply reconfigure (DO.
WAO Travis Shrey RHIC Machine Specialist Collider-Accelerator Dept Brookhaven National Laboratory 10/30/2014.
1 RHIC – p+p and p+Au projections for March 2014 STAR meeting.
ITIL: Service Transition
Outages During the Run Coping with the Power Company August 9, 2012.
KICKOFF AS PRESENTED 6/17/11, SEE THIS WEEKS SCHEDULE FOP THE LATEST UPDATE Shutdown Shutdown ‘11.
Accelerator Support and Maintenance Run 14. Maintenance Tomorrow Major efforts RHIC: Major efforts RHIC: Access hrs. Access hrs. RA.
Corrective and Preventive Maintenance at NSCL. Outline Introduction to NSCL & MSU Quality Management at NSCL Tools used at NSCL for availability Future.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
WAO, Trieste, 24th - 28th September 2007 An Overview of the Reliability and the Fault Trends of the SRS Cheryl Hodgkinson Daresbury Laboratory Synchrotron.
Maintenance and Accelerator Support RHIC Run 12. Accelerator Status: Complex is running for Physics. Complex is running for Physics. Checkout for NSRL.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
Maintenance and Accelerator Support RHIC run10. Last Wednesday: Nice recovery Nice recovery Good work all especially: Good work all especially: HP, RF,
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Presentation on Preventive Maintenance
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
1.  Mission: Improve and operate accelerators, support the experimental program, and design and construct new accelerator facilities in an environmentally.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
Accelerator Support and Maintenance Run 14. Maintenance Tomorrow AGS hrs CA Specific Jobs only. AGS hrs CA Specific Jobs only. RHIC.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Maintenance and Accelerator Support RHIC Start Up 12.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Maintenance and Accelerator Support RHIC Start Up 12.
May 4, 2010 EBIS ARR Jim Alessi May 4- 7, 2010 Pre-commissioning and Commissioning.
D. Beavis (RSC) May 4, 2010 EBIS ARR Radiation Safety.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
Machine Protection at the 1MW CEBAF Electron Accelerator and Free Electron Laser Facility Kelly Mahoney Presented at the Workshop for.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Conduct of Operations Administrative Controls Ray Karol May 2010.
Maintenance Nov 28, Accelerator Access LINAC will remain on RA. It is not yet running. LINAC will remain on RA. It is not yet running. Booster-
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
LHC machine protection close-out 1 Close-out. LHC machine protection close-out 2 Introduction The problem is obvious: –Magnetic field increase only a.
Accelerator Support and Maintenance Startup for Run 13.
Time Meeting March 29, W. Christie Blue Ring Magnet String issue: -on Friday morning 7am (18 March 2016) a problem developed in the RHIC Blue ring.
1 AGS RSVP Review 4-5 November 2004 Management Issues Philip Pile Collider-Accelerator Department 4 Feb 2004.
Accelerator Support and Maintenance Startup13. Access LIPA work Friday LIPA taking feed for Booster MMPS down for emergency repair. LIPA taking feed for.
1 RHIC NSRL LINAC Booster AGS Tandems STAR 6:00 o’clock PHENIX 8:00 o’clock 10:00 o’clock Polarized Jet Target 12:00 o’clock RF 4:00 o’clock (AnDY, CeC)
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
A RHIC Low-Energy Test Run With Protons Todd Satogata (W. Fischer, T. Roser, J. DeLong, M. Brennan, D. Bruno, and others) April 11, 2006 Driven by discussions.
Operation Status of the RF Systems and Taiwan Photon Source
Corrective and Preventive Maintenance at NSCL
ITIL: Service Transition
Software Configuration Management
Software Project Configuration Management
Machine operation and daily maintenance management in SOLEIL
Systems Analysis and Design in a Changing World, 4th Edition
Presented by Jon Pastuszynski, Lead M&D Engineer
(Selected) Project Management Processes at the XFEL
Software and Systems Integration
Systems Implementation,
John T. Seeman DOE PEP-II Operations Review April 26, 2006
Clinical Engineering Lecture (3).
Hot Checkout System for LERF Resuscitation
Management of Change Report Errors to Management.
The Fermi National Accelerator Laboratory is a U. S
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
System Review – The Forgotten Implementation Step
Project Management Process Groups
PREVENTIVE MAINTENANCE
3. Software Quality Management
Close-out.
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

Maintenance and Efficiency Paul W. Sampson Maintenance and Accelerator Support Group Leader: CAD/RHIC Brookhaven National Laboratory

Short Background CAD at BNL in Upton New York, USA RHIC Large superconducting collider 500GeV cm for polarized proton running Species to Au (U this year?) Dissimilar species Many “parasitic” users on injectors: LINAC Tandem Van de Graff EBIS Booster AGS April 13th, 2011 Paul W. Sampson

April 13th, 2011 Paul W. Sampson

April 13th, 2011 Paul W. Sampson

Maintenance Support Group Role Plan and coordinate work throughout the accelerator complex. Emphasis on operations and uptime. Integrate Professional Trades, Technical, Engineering and Physics staff activities during shutdown, failure (unscheduled maintenance) and scheduled maintenance periods. April 13th, 2011 Paul W. Sampson

Goals: Maximize uptime and optimize accelerator output Integrated Luminosity is king? STAR, PHENIX, Overall integrated luminosity. What cost for improvement? Parameters vary for varying species in RHIC Use and maintenance of different systems. Differing beam parameters. Safety/Radiation issues- affects on access and equipment availability. New systems commissioning. Internal goals: Beam parameters. Available time at store, setup minimization Calendar time at store. April 13th, 2011 Paul W. Sampson

Reliability formula complicated End of life. Installation and commissioning. Infant mortality “Roll up period” Legacy systems. April 13th, 2011 Paul W. Sampson

April 13th, 2011 Paul W. Sampson

Shutdown Annual occurrence. Duration factors: Budget. Major work schedule. Experiment upgrades/readiness. Climate. Documented utilizing data base tool. Progress tracked and Project published. Goals Complete shutdown work. Prepare for structured pre-startup checkout. Minimize start up (time to Physics). April 13th, 2011 Paul W. Sampson

Unscheduled Maintenance Major failure or other prolonged downtime. Goal of maximizing use of time and access while minimizing the recovery. Coordinated by Maintenance Support Group. Schedule are created as necessary, depending on length of downtime. Each day run similar to a scheduled maintenance day. April 13th, 2011 Paul W. Sampson

During the run: “Minor” Failure (>4hours) Small low impact jobs to be performed. “Fast” experimenter access Coordinated by on duty Operations Coordinator, with assistance and advice from Maintenance Support Group as needed. Documented by standard methods. April 13th, 2011 Paul W. Sampson

During the run: Scheduled maintenance days. Usually 8-12 hours, biweekly. Driven by experimental access. Accelerator access for: Preventative Maintenance. Repair Modification Installation Commissioning. Shutdown planning Inspection/work observation Continuation of shutdown/installation work. April 13th, 2011 Paul W. Sampson

How maintenance days directly impact availability… Scheduled maintenance days demand that the program is off. Many required tasks require prolonged access. Some systems have long lead time before work can be performed. Source cool down. Cryogenic warm up. Radiation cool down periods. Setup and recovery after maintenance period. Human error: Systems left in inoperable state following maintenance period. Failure of improperly maintained equipment or systems. April 13th, 2011 Paul W. Sampson

Reliability and Maintenance days: Preventative maintenance periods should be focused on reducing failures. Repairs to systems and infrastructure. Accelerator tunnel/Radiation area access: PM and repair Installation, testing and commissioning of new and modified systems. Low intensity test cycles following maintenance period: Used for machine development. Tests and implementation modified and modes before they are adapted as operational. Scheduled as part of the maintenance period. April 13th, 2011 Paul W. Sampson

Reliability and maintenance days Maintenance day goals: Complete tasks necessary to maintain current mode of running at the accelerator complex. Prepare for any new running conditions expected. Minimize the total duration and the time from end of maintenance to a return to smooth running. Some tasks performed can cause unstable running and increased failure in the days that follow maintenance periods. Vacuum bleed-up. Ion source maintenance. Cryogenic. RF systems. Super Conducting power supply systems. April 13th, 2011 Paul W. Sampson

Reliability after maintenance: New running modes can cause increased failure for various reasons: More aggressive magnetic cycles. Increased high voltage. Additional interlocks. Re-integration of repaired systems: Feedback elements. Interlocking devices- loss monitors, chipmunks/radiation monitors, beam permit or inhibit systems. Failure of new or un-commissioned systems: Apertures in the beam pipe. Improperly grounded devices. Miss-configured interlocks or inhibits Miss-configured devices (current loops). April 13th, 2011 Paul W. Sampson

Maintenance methods for increased reliability Scheduled Maintenance Days Job Requests Benefit and impact analysis Prioritization Individual work planning Overall work planning and scheduling System recovery Accelerator recovery Return to physics April 13th, 2011 Paul W. Sampson

Before maintenance days Determine which tasks are actually necessary. Avoid low return, high risk jobs. Carefully document accelerator status before turn off. Define parameters for recovery. Schedule accesses for efficiency- 4 hours to secure accelerators. Communicate with all groups Scheduling meeting, web, CCTV, face to face … April 13th, 2011 Paul W. Sampson

Accelerator Physics/Administration Experimental Support and Facilities Maintenance Support Accelerator Physics/Administration Experimental Support and Facilities Accelerator systems Integrated Facility Management

Job Request: Create April 13th, 2011 Paul W. Sampson

Pic of list April 13th, 2011 Paul W. Sampson

Work planning: Individual jobs are planned by cognizant techs or engineers. Job request is submitted to the MSG for review. Primary approval given and schedule created. Final review with upper management, experimenters and run coordinators. Staff briefing. Schedule posts. April 13th, 2011 Paul W. Sampson

Schedule: Time Activity Personnel By 0600 Turn down OPPIS source for maintenance (After store to last to 0800hrs has been established) MCR 0600 Apply CA LOTO to AGS AGS Maintenance Begins (items outside the ring) CAS CAD 0800 RHIC areas to RA, RHIC Maintenance Begins LINAC Maintenance begins MSG LINAC 0900 CA Access into the AGS MCR/CAS 1100 AGS Access complete 1130 RHIC sweeps begin in select areas 1400 PHENIX tunnel sweep 1430 Hysteresis ramp, PHENIX IR sweep 1500 Physics setup in RHIC MCR/AP… April 13th, 2011 Paul W. Sampson

Submission: Individual Jobs Initial review: Task Analysis, job approval (denial) Initial Schedule Proposal Final Schedule publication, review with staff Execution of scheduled and Emergent tasks System Recovery, Test ramp Return to Physics April 13th, 2011 Paul W. Sampson

Execution Complex formally handed over to Maintenance Support Group MCR staffing: Maintenance Coordinator (MC) to run activities, normally from MCR. Utilize Operations Coordinator, Operators and support staff. Leads keep MC informed of progress, emergent issues and job completion. MSG leader appraised of major change, facilitates review, approval and schedules changes as necessary. Maintenance coordinator executes changes. April 13th, 2011 Paul W. Sampson

Communication: During the maintenance, it is communication is essential. CCTV Web, elogs, Job request system. Radio, pagers and telephone… April 13th, 2011 Paul W. Sampson

End of maintenance: Job closeout statements reviewed by MC before final closure. Tiered access allows for recovery of systems to begin as soon as they are ready. Injectors RF Power supply Vacuum Instrumentation Specialist confirms with MSG that systems have been returned to operational condition. Specialist remains on alert until program is recovered April 13th, 2011 Paul W. Sampson

Return to Physics Accelerators are returned to operating condition as available. Schedule work accordingly. After injectors have recovered, RHIC test ramp performed. Structured hand off to MCR for routine operation. Maintenance Coordinator’s Journal closeout. Operations Coordinator’s journal entry. Maintenance day summary/closeout. April 13th, 2011 Paul W. Sampson

April 13th, 2011 Paul W. Sampson

April 13th, 2011 Paul W. Sampson

April 13th, 2011 Paul W. Sampson

Results Since structured systems introduction in 2005: The methods described have produced a marked improvement in performance on and after maintenance periods. Return to productive running has steadily improved. In many instances, machine performance is actually better immediately following maintenance periods. Could maintenance have actually helped??!! April 13th, 2011 Paul W. Sampson

April 13th, 2011 Paul W. Sampson

Maintenance Effectiveness Trend April 13th, 2011 Paul W. Sampson

Other comments: Maintenance and repairs done behind physics stores. Software releases. Systems maintenance: BPMs. Systems commissioning, improvement. Studies following Maintenance days. Dual mode days- Maintenance on one machine and science on another. April 13th, 2011 Paul W. Sampson

Acknowledgements: Availability, “Top Ten” and integrated luminosity plots adapted from presentation “Operating Statistics” by P. F. Ingrassia, Brookhaven National Laboratory. “RHIC from space” courtesy of BNL Photo archives. April 13th, 2011 Paul W. Sampson

Thank you April 13th, 2011 Paul W. Sampson

April 13th, 2011 Paul W. Sampson

April 13th, 2011 Paul W. Sampson

April 13th, 2011 Paul W. Sampson