CHEMCAD Process Safety Emergency Relief John Edwards, P&I Design Ltd

Slides:



Advertisements
Similar presentations
Fundamentals of Pressure Relief Devices
Advertisements

Modelling & Simulation of Chemical Engineering Systems
Modern pipe network models
page 0 Prepared by Associate Prof. Dr. Mohamad Wijayanuddin Ali Chemical Engineering Department Universiti Teknologi Malaysia.
Fluid Power Systems Mill Creek High School Power and Energy.
INSTRUMENTATION AND CONTROLS FOR SAFETY
INTRODUCTION TO RELIEF CHAPTER 7
BakerRisk also has the ability to utilize other software tools to complete a full flare system analysis: ChemCad® Dynamic flare header hydraulics Flare.
Drums, Vessels, & Storage Tanks Design Considerations.
An Overview of Pressure Relief Devices
Step 1: Set the desired flow rate for each pipe. Step 2: Click on the stream which you wish to size the pipe. Select Sizing from the menu, then select.
Michael Naas, Teddy Wescott, Andrew Gluck
Chemstations, Inc – Houston, TX – – An Overview of Process Simulation What is needed? What are the steps?
Dakota Nickerson, Kyle Pflueger, Adam Leschber, Andrew Dahlke M.E. Undergrad 1.
Dynamic Steady State Continuous Discrete Deterministic Stochastic.
Pressure Safety Valve Design Presented to ES-317 at UWO in 1999 Dick Hawrelak.
Lesson 26 CENTRIFUGAL PUMPS
5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 1 NFPA 58, LP-Gas Code, sets out the minimum valve and fitting requirements for propane.
Chapter 7 Sections 7.4 through 7.8
STEAM HEATING.
Relieve system design problems and DIERS activity
Controller Design Using CHEMCAD
Valves In Industry (Part 3).
CHAPTER II PROCESS DYNAMICS AND MATHEMATICAL MODELING
Flash Distillation Flash distillation is the simplest method of separation. A feed stream is “flashed” into a chamber or “flash drum” and the liquid and.
P&ID Design and Equipment Selection
Chapter 10 Fluid Power Systems.
Equipment Sizing Preliminary Equipment Sizing for Capital Cost Estimation.
ERT 312 SAFETY & LOSS PREVENTION IN BIOPROCESS INTRODUCTION TO RELIEF
College of Engineering & Petroleum Depatment of Chemical Engineering
FLOW-SHEETING What we will cover here? PFD?
Week 1 – Engineering Agenda Introductions and Photos Why should I care about engineering? Motivation for the DB Exam Dimensions and Unit Conversion Examples.
Things to grab for this session (in priority order)  Pencil  Henderson, Perry, and Young text (Principles of Process Engineering)  Calculator  Eraser.
Department of Mechanical Engineering ME 322 – Mechanical Engineering Thermodynamics Lecture 15 Nozzles/Diffusers, Valves, Heat XGERs.
Valves In Industry (Part 3)
One Minute Paper Statics; reply. Fluid dynamics  Fluids in motion Pumps Fans Compressors Turbines Heat exchangers.
Week 1 – Engineering Agenda
Things to grab for this session (in priority order)  Pencil  Henderson, Perry, and Young text (Principles of Process Engineering)  Calculator  Eraser.
Multiple Species Chapter 7. Training Manual May 15, 2001 Inventory # Objectives The FLOTRAN multiple species capabilities. Dilute mixture option.
ERT 322 SAFETY & LOSS PREVENTION. (A) Spring operated reliefs in liquid and gas service. (B)Rupture disc reliefs in liquid and gas service. (C)Vents for.
Bernoulli Equation – Pitot tube  Horizontal  Velocity at stagnation point is 0  Incompressible fluid  Steady state  Velocity as function of pressure.
Tower Design in ProMax ChEN 4253 Design II Chapter 19 S,S&L Terry A. Ring University of Utah.
FLASH EMISSIONS JIM COOPER, CHESAPEAKE ENERGY CORPORATION.
Chapter 10: Flows, Pumps, and Piping Design
1 Chapter 5 Mass and Energy Analysis of Control Volumes.
CHE441 Lecture: Tank & Vessel. Introduction of Vessel Applications of Vessels:  (1) as a liquid surge drum for liquid storage  (2) as a vapor/liquid.
CHEMCAD Seminar Transport and Storage John Edwards, P&I Design Ltd
Dynamics Seminar Section 7 Batch Reactors John Edwards, P&I Design Ltd
CHEMCAD Seminar Heat Transfer John Edwards, P&I Design Ltd
Dynamics Seminar Section 3 Process Control
Consequence Analysis 1.2.
John Edwards, P&I Design Ltd
CHEMCAD User Meeting Berlin, September 2015
John Edwards, P&I Design Ltd
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Chemstations Dynamic Seminar
Presentation CHEMCAD Simulation Software Training Simulator
Thermodynamics Processes.
CHEMCAD Utility Processes John Edwards, P&I Design Ltd January 2015
Component Availability Effects
TOPIC:- VAPOUR CYCLES CREATED BY:
John Edwards, P&I Design Ltd
Process Equipment Design and Heuristics – Process Vessels
Process Equipment Design and Heuristics – Heat Exchangers
Exercise 1 HYSYS Review 11/12/ Design & Analysis II.
John Edwards, P&I Design Ltd
Aspen Reactors Amanda Hamilton, Jonathan Kalman, Harrison Kraus, Jenny Lam, Sophie Levy, Jacob Salem.
Flash Distillation Flash distillation is the simplest method of separation. A feed stream is “flashed” into a chamber or “flash drum” and the liquid and.
Dynamics Seminar Design Cases John Edwards, P&I Design Ltd
Presentation transcript:

CHEMCAD Process Safety Emergency Relief John Edwards, P&I Design Ltd January 2015 www.chemstations.com 1

PROCESS SAFETY - EMERGENCY RELIEF www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com PROCESS SAFETY - EMERGENCY RELIEF EMERGENCY RELIEF SYSTEM DESIGN Understand temperature and phase changes across relief device Understand relief device parameters Be able to specify a relief device Understand vessel model and vent model characteristics Understand heat model selection criteria Be able to use CHEMCAD relief sizing tool Set up multiple relief scenarios with blowdown systems Study dynamic multiple relief scenarios

PROCESS SAFETY - EMERGENCY RELIEF RELIEF DEVICES – VALVE TYPES www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com PROCESS SAFETY - EMERGENCY RELIEF RELIEF DEVICES – VALVE TYPES

PROCESS SAFETY - EMERGENCY RELIEF RELIEF DEVICES RUPTURE DISCS www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com PROCESS SAFETY - EMERGENCY RELIEF RELIEF DEVICES RUPTURE DISCS

PROCESS SAFETY - EMERGENCY RELIEF TYPICAL BLOWDOWN MANIFOLD www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com PROCESS SAFETY - EMERGENCY RELIEF TYPICAL BLOWDOWN MANIFOLD REACTOR 1 BLOWDOWN TANK REACTOR 2 REACTOR 3 PUMP SCRUBBING COLUMN VENT RELIEF HEADERS DISPERSION

PROCESS SAFETY - EMERGENCY RELIEF CHEMCAD SIZING TOOL FEATURES www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com PROCESS SAFETY - EMERGENCY RELIEF CHEMCAD SIZING TOOL FEATURES DESIGN/RATING ATMOSPHERIC STORAGE TANKS PRESSURE VESSELS VESSEL MODEL BUBBLY CHURN-TURBULENT HOMOGENEOUS VESSEL NON-FLASHING LIQUID VENT MODEL HEAT MODEL VENT FLOW TEMPERED RUNAWAY REACTION NFPA 30 OSHA 1910-106 HEM ERM HFZ SINGLE PH VAPOR STEAM HNE API 520/521 API 2000 HEAT RATE NON TEMPERED RUNAWAY REACTION

PROCESS SAFETY - EMERGENCY RELIEF PRESSURE SPECIFICATIONS www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com PROCESS SAFETY - EMERGENCY RELIEF PRESSURE SPECIFICATIONS SET PRESSURE SET PRESSURE +10% DESIGN PRESSURE DESIGN PRESSURE +10% Pressure rise due to reaction Safety valve starts to open Maximum accumulated pressure Safety valve full open PRESSURE TIME

EMERGENCY RELIEF SIMULATION REACTION TYPES www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com EMERGENCY RELIEF SIMULATION REACTION TYPES REACTION SYSTEM VAPOUR PRESSURE HYBRID GASSY TEMPERED UNTEMPERED

PROCESS SAFETY - EMERGENCY RELIEF VESSEL BEHAVIOUR MODELS www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com PROCESS SAFETY - EMERGENCY RELIEF VESSEL BEHAVIOUR MODELS HOMOGENEOUS BUBBLY CHURN-TURBULENT Relief Area ↑

PROCESS SAFETY - EMERGENCY RELIEF VENT FLOW REGIMES www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com PROCESS SAFETY - EMERGENCY RELIEF VENT FLOW REGIMES VENT FLOW HIGH VISCOSITY LOW VISCOSITY FOAMY NON FOAMY HOMOGENEOUS BUBBLY TWO PHASE RELIEF SINGLE PHASE CHURN-TURBULENT

PROCESS SAFETY - EMERGENCY RELIEF VENT FLOW MODELS www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com PROCESS SAFETY - EMERGENCY RELIEF VENT FLOW MODELS HEM ERM HENRY-FAUSKE HNE NON-FLASHING LIQUID SINGLE PHASE VAPOUR STEAM RELIEF HFZ (HOMOGENEOUS FROZEN)

PROCESS SAFETY - EMERGENCY RELIEF VENT FLOW MODELS www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com PROCESS SAFETY - EMERGENCY RELIEF VENT FLOW MODELS

PROCESS SAFETY - EMERGENCY RELIEF HEAT MODELS www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com PROCESS SAFETY - EMERGENCY RELIEF HEAT MODELS API 520/521 API 2000 NFPA 30 OSHA 1910-106 SPECIFY VENT FLOW SPECIFY HEAT RATE TEMPERED RUNAWAY REACTION NON TEMPERED RUNAWAY REACTION

PROCESS SAFETY - EMERGENCY RELIEF CODE SETS EXPOSED AREA www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com PROCESS SAFETY - EMERGENCY RELIEF CODE SETS EXPOSED AREA NFPA-30 & OSHA 1919-06 55% total exposed area 75% total exposed area, if<200 ft2 use 100% 100% total exposed for first 30 ft exclude bottom area if flat and supported on ground SPHERE HORIZONTAL TANK VERTICAL TANK

SIMULATION SUITE CHEMCAD SOFTWARE www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com PROCESS SAFETY - EMERGENCY RELIEF API 520 / 521 > 15 psig SETS EXPOSED AREA SPHERE HORIZONTAL TANK VERTICAL TANK PROCESS VESSEL FRACTIONATING COLUMN Area up to maximum horizontal diameter or up to 25ft height whichever is greater Area equivalent to the average inventory level up to 25ft height Area equivalent to level in bottom & reboiler plus tray hold up to a height of 25ft

PROCESS SAFETY - EMERGENCY RELIEF API 2000 ≤ 15 psig www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com PROCESS SAFETY - EMERGENCY RELIEF API 2000 ≤ 15 psig SPHERE As in API 520/API521 HORIZONTAL TANK 75% total exposed area VERTICAL TANK As in OSHA

PROCESS SAFETY EMERGENCY RELIEF EXTERNAL FIRE API 520 STANDARDS www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com PROCESS SAFETY EMERGENCY RELIEF EXTERNAL FIRE API 520 STANDARDS

PROCESS SAFETY - EMERGENCY RELIEF SIMULATION SET UP PROCEDURE www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com PROCESS SAFETY - EMERGENCY RELIEF SIMULATION SET UP PROCEDURE Inlet Stagnation Conditions Sizing Blowdown Piping Design Piping use Beggs and Brill and Calculation Mode 5 If vent flow specified use nominal size pseudo vessel Set vessel at maximum operating level Conservative use HEM vessel and vent flow models Non-tempered runaway must use HFZ vent model If single phase vapour specified check for two phase Set up Inlet Stream at Set Pressure and Flow 1 kg/h Single Component Flash at vf 0 or 1 Multi –component Set weight fractions and Flash at vf 0

PROCESS SAFETY EMERGENCY RELIEF CASE 6.06 RELIEF DEVICE RATING www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com PROCESS SAFETY EMERGENCY RELIEF CASE 6.06 RELIEF DEVICE RATING Section 6 Case 6.06 page 205 Fluid Propane Set pressure 993000Pa No external heat, rating determines nozzle capacity

PROCESS SAFETY EMERGENCY RELIEF CASE 6.06 RELIEF DEVICE RATING www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com PROCESS SAFETY EMERGENCY RELIEF CASE 6.06 RELIEF DEVICE RATING Section 6 Case 6.06 page 205

PROCESS SAFETY EMERGENCY RELIEF CASE 6.06 RELIEF DEVICE RATING www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com PROCESS SAFETY EMERGENCY RELIEF CASE 6.06 RELIEF DEVICE RATING Section 6 Case 6.06 page 205 Vent Flux = 3.55E05/(3600*0.01767) = 5580 kg/s-m2

PROCESS SAFETY EMERGENCY RELIEF CASE 6.13 REACTOR MANIFOLD www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com PROCESS SAFETY EMERGENCY RELIEF CASE 6.13 REACTOR MANIFOLD Section 6 Case 6.13 page 213 Section 6 Case 6.06 page 205

PROCESS SAFETY EMERGENCY RELIEF CASE 6.13 RELIEF MANIFOLD GUI www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com PROCESS SAFETY EMERGENCY RELIEF CASE 6.13 RELIEF MANIFOLD GUI Section 6 Case 6.06 page 205

PROCESS SAFETY EMERGENCY RELIEF CRITICAL FLOW CONSIDERATIONS www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com PROCESS SAFETY EMERGENCY RELIEF CRITICAL FLOW CONSIDERATIONS API 520 Part 1,  7th Edition January 2000, Section 3.6.1.3 Under critical flow conditions, the actual pressure at nozzle exit of the pressure relief device cannot fall below the critical flow pressure even if a much lower pressure exists downstream. At critical flow, the expansion from nozzle pressure to downstream pressure takes place irreversibly with energy dissipated in turbulence into the surrounding fluid

PROCESS SAFETY EMERGENCY RELIEF DYNAMIC VESSEL MODEL www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com PROCESS SAFETY EMERGENCY RELIEF DYNAMIC VESSEL MODEL DIERS Technology used to model vessel bed expansion API 520 heat input model used to simulate fire DIERS two phase flow methods used to calculate flow through valve Node represents back pressure on safety relief valve Two phase flow through piping system modeled dynamically

PROCESS SAFETY EMERGENCY RELIEF CASE 6.15 COINCIDENT DYNAMIC RELIEF www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com PROCESS SAFETY EMERGENCY RELIEF CASE 6.15 COINCIDENT DYNAMIC RELIEF Section 6 Case 6.15 page 220 30ft 4in x 40 120ft 6in x 40 40ft 6in x 40

SIMULATION SUITE CHEMCAD SOFTWARE www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com PROCESS SAFETY EMERGENCY RELIEF CASE 6.15 COINCIDENT DYNAMIC DVSL SPECS Section 6 Case 6.06 page 205 DVSL2 - 180psia

PROCESS SAFETY EMERGENCY RELIEF PIPE NETWORK PROPERTIES www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com PROCESS SAFETY EMERGENCY RELIEF PIPE NETWORK PROPERTIES All Flows and Pressures dependent on each other Flowrate can be calculated as a function of Inlet Pressure (Pin) Outlet Pressure (Pout) Flow Scaling Unit Ops solve for flowrate as a function of Pin and Pout Node Unit Op links all Flow Scaling UnitOps shown in Table below Pipe (PIPE) Valve (VALV) Control Valve (CVAL) Pumps (PUMP) Compressors (COMP) Expanders (EXPN) Pin, Pout, and Flowrate for all scaling Unit Ops

PROCESS SAFETY EMERGENCY RELIEF PIPE NETWORK NODE UNITOP www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com PROCESS SAFETY EMERGENCY RELIEF PIPE NETWORK NODE UNITOP Nodes link two or more Flow Scaler Unit Ops Allows the simultaneous solving of unknown variables in a network Has P and Fin and Fout Can specify either P and Fin, calculate Fout P and Fout, calculate Fin Fout and Fin, calculate P

PROCESS SAFETY EMERGENCY RELIEF CASE 6.15 PRESSURE NODE SPECIFICATIONS www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com PROCESS SAFETY EMERGENCY RELIEF CASE 6.15 PRESSURE NODE SPECIFICATIONS Section 6 Case 6.06 page 205

PROCESS SAFETY EMERGENCY RELIEF CASE 6.15 DYNAMIC SIMULATION SET UP www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com PROCESS SAFETY EMERGENCY RELIEF CASE 6.15 DYNAMIC SIMULATION SET UP Section 6 Case 6.06 page 205 Switch to dynamic mode under convergence Set Run Time to 5 minutes with 0.1 minute step size Record desired streams 4 and 9 Record desired UnitOps 1, 2, 5 and 6 Select Run Time plot options Run from Initial State Plot results

PROCESS SAFETY EMERGENCY RELIEF CASE 6.15 DYNAMIC SIMULATION RESULTS www.chemcad.co.uk SIMULATION SUITE CHEMCAD SOFTWARE www.chemstations.com PROCESS SAFETY EMERGENCY RELIEF CASE 6.15 DYNAMIC SIMULATION RESULTS Section 6 Case 6.06 page 205