Reliability Unit Commitment Discussion with QMWG

Slides:



Advertisements
Similar presentations
NPRR 532 Performance Measurement & Verification and Telemetry Requirements for Load Resources providing Non-Spin David Kee CPS Energy Energy Supply & Market.
Advertisements

QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
SCED Power Balance Penalty Curve
March 13, 2013 Day-Ahead Market (DAM) Clearing Process follow-up from February WMS Matt Mereness, ERCOT Manager DAM & CRR.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
NPRR 336, Authorize ERCOT to Procure Additional RRS During Severe Cold Weather Consideration of Tenaska and Luminant Comments.
FAST Procurement and Pricing May 28, 2015 TAC Meeting 1.
MISUG Meeting Materials ERCOT 10/16/ Agenda 10/16/ Antitrust AdmonitionJ. Lavas 9:30 a.m. 2.Introduction/Agenda OverviewJ. Lavas 9:35 a.m.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
QSE Managers Working Group Meeting Notes 3 February, 2010 Report to WMS 17 February, 2010 David Detelich - Chairperson.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
December 2, 2011 QMWG Summary of Potential Issues with NPRR385 Price Floor ERCOT.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
NPRR 511 and QSGR MOC ERCOT Settlements Meeting Title: WMS Date: March 13, 2013.
1 Project Update and Summary of Project Priority List (PPL) Activity September 10, 2015.
August 17, 2011 Reliability Deployments Task Force Meeting Updated Analysis of Non-Spin Deployments and RUC John Dumas Director Wholesale Market Operations.
Report to TAC February In Brief Chair and Vice-Chair for 2009 Chair and Vice-Chair for 2009 Working Group Reports Working Group Reports QMWG QMWG.
1 WMS Report TO TAC March In Brief Three Working Group Reports Three Working Group Reports Three Task Force Reports Three Task Force Reports EILS.
July QMWG Update (WMS). GREDP Discussion GREDP is currently used as a compliance tool ERCOT is considering now just using it as an investigative tool.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
Lead from the front Texas Nodal 1 External Web Services Update Nodal Implementation Team Presentation July 7, 2009.
April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.
Wholesale Market Subcommittee April 12, 2012 ERCOT Dynamic Ratings Application.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
NPRR385, Security Violation Analysis and Reporting and Negative Price Floor WMS Meeting February 15, 2012.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
RCWG Update to WMS December 5, General Update Agenda Items for Today: Verifiable Cost Manual clarifications (vote) White Paper on Long Term Fuel.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
Slack Bus Change and Impact to Market Market Analysis, ERCOT QMWG Sep. 4, 2015.
Item 5: PRS Report John Varnell 2014 PRS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public August 28, 2014.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
1 Project Update and Summary of Project Priority List (PPL) Activity April 16, 2015.
RPRS TF and QSE Managers Report to PRS 1)Procurement (QSE Managers) 2)Cost Allocation (RPRS Task Force) –PRR 674 –PRR 676 –PRR 678.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Discuss Options to Improve Market Visibility to RTBES Presented by: Matt Mereness Friday, October 27, 2006.
QMWG Report to WMS S. Looney April 9, NPRRs Assigned to QMWG NPRR595, RRS Load Treatment in ORDC – Provides ORDC payment for non-controllable Load.
The credit exposure impact of higher system-wide offer caps was estimated using an internal ERCOT model under four scenarios: 1.(Base Case) “Normal” summer.
August 27, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 1, 2015 TAC Update to RMS1.
MISUG Meeting Materials ERCOT 9/07/ MISUG Agenda 9/07/ Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionJ. Lavas9:35 a.m. 3. Follow up.
SAWG Update to WMS September 2 nd, 2015 Brandon Whittle.
MISUG TAC Update Jackie Ashbaugh ERCOT 3/7/ TAC3/7/ /22/2011 Meeting Focus on the high priority items from MISUG: Review task list prioritization.
EILS Discussion February WMS. Charge to WMS from PRS The benefit. The cost based on the EILS PRRs. Changes in Market since April 17, 2006.
ROS Report Bill Hatfield 2014 ROS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public June 26, 2014 TAC Meeting.
Joint PLWG/CMWG Assignment Update to ROS September 15, 2011.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
The Wholesale Market Subcommittee Update Prepared for the July 31st TAC meeting.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
February 25, 2016 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 1, 2016 TAC Update to RMS 1.
NPRRs 705NPRR Provides Consistency for References to the End Date of the Generation Interconnection Process. In the Resource Interconnection Handbook,
MISUG Meeting Materials ERCOT 7/26/ MISUG Agenda 1.Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionsJ. Lavas9:30 a.m. 3.Market Data Transparency.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
NPRR784 Mitigated Offer Caps for RMR Units Protocol Revision Subcommittee June 16,
Announcements Please read Chapter 6
2017 Seasonal Adjustment Factors
Protocol Revision Subcommittee
Exceptional Fuel Costs in LMP
NPRR833 Workshop: Contingency Processing in CRR, DAM and SCED
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
Southern Cross Directives Planning Items
Phase Angle Limitations
Settlement Update Austin Rosel ERCOT October 11, 2017.
Real-Time Co-optimization of Energy & Ancillary Services
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Resource Cost Working Group
OPSM 405 Service Operations Management
Representing Rainbow Energy Marketing Corporation
NPRRs NPRR654 Discontinue Ancillary Service Requirement Methodology Assessment Report. This Nodal Protocol Revision Request (NPRR) proposes the discontinuation.
ECEN 460 Power System Operation and Control
Presentation transcript:

Reliability Unit Commitment Discussion with QMWG February 27th, 2017

Introduction In late 2016, QMWG requested that ERCOT analyze the potential impacts of lowering shadow price caps used in the RUC engine During the previous QMWG meeting, initial information from that study were provided looking only at how engine outputs and recommendations would change on an aggregate level For this presentation, we’ll be discussing how potential reliability concerns are being evaluated along with information about potential concerns being reviewed Additionally, some other RUC related items are included in the material regarding the other noted agenda items

Constraints with Increased Violations Summed Violation Amount Max. Increase in Violation Amount Current Caps Lower Caps DFL_MAR8 - BETFM_66_A 17.37 33.45 1.1% 5.1% DFL_MAR8 - BETHK_66_A 75.27 108.66 0.0% 4.7% DLONWAR5 - FANNIN_VICTOR1_1 6.1 28.79 7.9% DSN_BFP8 - BAY_SARG_1 45.83 59.34 11.4% DSNGZEN5 - BETFM_66_A 16.17 3.1% DSNGZEN5 - BETHK_66_A 4.08 124.52 6.9% DWH_STP5 - BONIVI_RINCON1_1 6.59 8.9% SBEVASH8 - BIG_COTU_1 67.63 83.65 2.3% 13.9% SBREHIG8 - 367T347_1 41.09 79.98 6.3% 15.3% SFERZ48 - WEIDER_RAND_1 22.21 3.9% SFTWW_D8 - AIR_W_DE_1 38.04 81.38 0.1% 3.0% SJARDIL8 - DIL_COTU_1 142.21 155.44 8.8% SJMCW_D8 - FTW_W_DE_1 176.98 198.72 2.0% SNADRIC8 - NAD_ELCM_1 1.76 14.45 9.4% SSIGSAN8 - NCA_SMTP_1 21.66 42.6 11.0% SVLDO2W8 - BAY_SARG_1 89.91 171.31 1.6% 14.1% XPHR58 - G138_10C_1 3.73 24.53 1.8% 10.8% XPHR58 - MDO_AT1 4.32 46.94 2.6% XPHR58 - MDO_AT1L 6.04 49.11 2.8% The table includes a subset of constraints that were more violated Increase is summed violation amount Some of theses constraints were already in real-time with historical behavior

Resources No Longer Recommended As discussed last time, the change is shadow price cap reduced the number of Resources that were recommended by the RUC engine This difference includes both Resources that ERCOT eventually committed and others that were not committed for that operating day For ones committed, a number of the Resources were tied to constraints mentioned on the previous slide Currently working with operations on the reliability impacts for these recommendations that were removed

Example Operating Day – July 10th 2 Resources that were recommended by the RUC engine and committed were no longer recommended with the lower shadow price cap The noted commitment reason was constraint DRNS_TB5 - SNGZEN99_A however other related constraints were SVLDO2W8 - BAY_SARG_1, SVLDO2W8 - MRK_VNVL_1, and XDOW58 - BAY_SARG_1 These latter 3 constraints became more violated in the RUC optimization as a result of the change For those two Resources, the shift factors were ~-15% for DRNS_TB5 - SNGZEN99_A and ~-1% for the other 3 constraints No clear alternative solutions provided by the RUC engine with the lower shadow price caps

Continuing to analyze the removed commitment recommendations Further Analysis Continuing to analyze the removed commitment recommendations Working with Operations to identify issues Impacts of increased violations Impacts to congestion management in Real-Time Individual cases are being reviewed manually What max. shadow prices will ensure that the acceptable level of reliability is achieved with reduced commitments

RUC Display Heuristic Rules There have been questions from QMWG around the heuristic rule for identifying as for “capacity” or “congestion” within the displays The logic looks at RUC recommendations and active constraints in the last iteration of RUC If a recommended Resource has a shift factor less than -0.1% for any of the active constraints, it was highlighted in the display as for “congestion” The value is configurable Otherwise identified as for “capacity” Shift factor used in rule is same shift factor as is displayed to the Operator Historically the single slack bus shift factor, but now the load-distributed slack bus shift factor Thinking about “non-shift factor” logic rules as well

Operator Display Enhancements In addition to these discussions, we have been looking at ways to give the Operators better information through their displays 1 enhancement just implemented was to provide constraint shift factors based on load-distributed slack bus As opposed to the values being based on a single slack bus, which is used for the optimization More equivalent to the values seen by Operators during real-time (produced by the Real-Time Contingency Analysis application) Provides a better understanding of how the Resource(s) may be used in real-time Working to identify other improvements

Extreme Cold Weather Discussion There were several months of discussion around RUC and extreme cold weather events Some of the things that resulted from that were: NPRR767, Commitment by RUC for Long Lead Time Resource Updates to Operator Desk Procedures “Increasing Ancillary Services for Extreme Cold Weather” in the Resource Desk Procedures updated in ‘14 and ’16 Believe it can be removed from the Open Action Items list