Pacific Gas and Electric Company

Slides:



Advertisements
Similar presentations
Demonstration Grant PARTNERS FOR PIPELINE SAFETY WEB PAGES Develop interactive and informative webpage for residents, property owners, contractors and.
Advertisements

Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
TransCanada Corporation (TSX/NYSE: TRP)
LIGHT RAIL PERMITTING ADVISORY COMMITTEE COMMITTEE MEETING October 15, 2014|3:00PM -5:00PM | ROOM 1E-113.
1 Preparing for emergencies and climate impacts Gina Blus Sustainable Communities Feb. 28, 2013.
IMPROVING COAST WALK TRAIL Friends of Coast Walk Vision-Mission-Actions to Date.
Overview of Key Rule Features
Phoenix International Raceway (PIR) Presented By: Nicolaas Swart Traffic Engineering & ITS Program Manager Maricopa County DOT April 26, 2006 Presented.
1 PG&E Pipeline Safety Enhancement Program San Mateo County Jim Cogan Government Relations.
Urban Forest Inventory: A Primer Bill Hubbard Southern Regional Extension Forester.
Technical Review Needed Fire Flow Analysis Developer Services Summit November 16, 2010 Engineering - Asset Planning Joe Dugandzic, PE.
ILLINOIS COMMERCE COMMISSION Darin Burk Pipeline Safety Program Manager.
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
SCC DA Program Stress-corrosion-cracking direct assessment (SCCDA) is a structured process that contributes to pipeline company’s efforts to improve.
Julie Halliday, Program Development DOT – PHMSA – OPS November 18, Pipeline Safety Trust Conference Pipeline Safety – Getting to Zero Pipeline.
Department of Public Works Proposal for Archery in the Lower Arroyo & Deal Points for New Agreement with PRA City Council February 2, 2015.
Planning & Community Development Department Hillsides Residential Care and Educational Center Master Plan City Council July 20, 2015.
2012 CITY OF MIDDLETON SATISFACTION SURVEY WORKING DRAFT - PROPOSAL.
U.S. 31 at C.R. 400 South Intersection Improvement Clifty Creek Elementary School May 22, 2014, 6:00 p.m.
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)
1 Natural Gas Transmission Pipelines Brisbane City Council Meeting June 6, 2011.
Weaver Mountain Fuels Treatment Project BLM Phoenix Field Office N. 7 th Ave Phoenix, AZ.
Laguna Canyon Creek Protection and Restoration. Major Watercourse Laguna Canyon Creek is a major watercourse. The City identifies it as that and treats.
06/01/20161 Benny Hoff TÜV NORD Sweden AB AFS 2002:1 Use of pressure equipment.
1 Case Study: Pacific Gas & Electric Company San Francisco Lifelines Council Edwards Salas Senior Vice President, Engineering and Operations, PG&E February,
Pipeline Safety – 2015 Year in Review. Large PHMSA Budget Increase Pipeline Safety spending in 2015 was increased $26.9 million. Main areas of expansion.
CPAWC Meeting Nov. 12 th,  Some sidewalk tripping hazards are obvious and dangerous!
Just Checking: Inspections and Documentation Greenville, SC September 8-11, 2015.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
Business Continuity Disaster Planning
LESSONS LEARNED FROM RECENT PIPELINE INCIDENTS FLORIDA NATURAL GAS ASSOCIATION (FNGA) OPERATING & MARKETING CONFERENCE ROD WALKER PRINCIPAL CONSULTANT.
Alameda Creek Watershed San Francisco Public Utilities Commission October 27, 2009.
Community Pipeline Safety Initiative – St. Helena 1 Community Pipeline Safety Initiative City of St. Helena Tree Commission May 12, 2016.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Budget Week Results Public Forum Data March 10, 2010.
The Plaza at Santa Monica Project PUBLIC SCOPING MEETING
1828 Ocean Ave & 1921 Ocean Front Walk PUBLIC SCOPING MEETING
View display boards and speak one-on-one with staff
Jefferson County SA Red Rocks Site Approval
Tree Inspections for Real Estate Transactions
Marina Vista Streetscape Project
Facility Manager IPM PLAN and Policy
SAFE WORK INSTRUCTIONS
Jefferson County Planning Commission Hearing April 10, 2013
Center City Connector 101.
Fire Extinguisher Inspections.
Goodyear Napanee Contractor Safety
The Urban Forest Management Plan
NRC Cyber Security Regulatory Overview
FIRE EXTINGUISHER SAFETY TRAINING
Adopt-A-Facility Program
Pacific Power Seismic Preparedness Update
Community Update Project Overview Maximizing Benefits
SD INTRASTATE PUBLIC EDUCATION
Valves.
PROJ. 566(17) LOR PID MAJOR WIDENING
Significant Procedural Changes to the One-Call System
Safety Audit Components
Facility Manager IPM PLAN and Policy
When it snows, we respond. Snow season November 15-March 15
AGA Operations Conference
Palm Avenue between 9th and 10th Streets
Meadow Lake Boulevard Street Extension Project
SAFETY STANDARDS FINAL JEOPARDY
Sprague Avenue Phase II Survey Results and Next Steps
Harbour Island Force Main Replacement
Public Safety Power Shutoff (PSPS)
Camarillo Springs Project Draft EIR Scoping Meeting
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
SD INTRASTATE PUBLIC EDUCATION
Presentation transcript:

Pacific Gas and Electric Company Napa Tree Advisory Commission November 16, 2016

Valve Automation Project

Stanly Lane Operational and Safety Drivers Valve Automation Automatic and remote control shut-off valves improve PG&E’s ability to quickly turn off the flow of gas in the event of a significant change in pressure by isolating segments of our pipeline remotely The Valve Automation program also enhances electronic monitoring of our gas system to identify and locate operational issues quickly Remote controlled valves can be opened or closed with the push of a button from PG&E’s state-of-the-art gas control center in San Ramon In-line Inspection In-Line-Inspections (ILI) determines the thickness of a pipe’s remaining wall and, with some newer technologies, improves the ability to locate and assess cracks and other potential weaknesses. A “Pig” travels inside the pipe to measure and record irregularities that may indicate corrosion, cracks, laminations, deformations (dents, gouges, etc.) or other defects; Some “pigs” use high-resolution video to assess the internal condition of the pipeline, its welds and components, such as valve seals

Scope of Work As part of this valve automation project, PG&E will be removing 16 Eucalyptus trees and grinding all of tree stumps Additionally, we will grind 12 additional tree stumps located in the project area

Proposed Restoration Tree Removal Overview Proposed Vegetation Unacceptable risk trees to be removed Note: The visible tree line will not be interrupted as the Eucalyptus to the immediate west of San Francisco Bay trail provides continuous visual tree line Proposed Vegetation California Buckwheat (Eriogonum fasciculatum) Coast Live Oak (Quercus agrifolia) Silk Tassel (Garrya elliptica) Sticky Monkey Flower (Mimulus aurantiacus)

Proposed Restoration Existing Proposed Vegetation Proposed Silk Tassel Proposed Vegetation Proposed Note: The proposed restoration represents the vegetation at full maturity.

Proposed Restoration Existing Proposed Vegetation Proposed Silk Tassel Proposed Vegetation Coast Live Oak Proposed Note: The proposed restoration represents the vegetation at full maturity.

Proposed Restoration Existing Proposed Vegetation Proposed California Buckwheat Proposed Sticky Monkey Flower Note: The proposed restoration represents the vegetation at full maturity.

Community Pipeline Safety Initiative

Working with the City of Napa Present data to the Napa Tree Advisory Commission MAR. 3, 2016 Meet with City Staff to introduce the program APR. 13, 2016 Begin outreach to private property owners 25, 2016 Conduct Site-walk with Consulting Arborist to review franchise trees SEPT. 20, 2016 Meet with Parks, Trees and Facilities Manager to discuss mitigation NOV. 2, 2016 Present Stage 1 information to the Napa Tree Advisory Commission for approval 16, 2016

Program at a Glance WHAT WE’RE DOING Checking the area above the gas transmission pipeline for trees and structures that pose an emergency access or safety concern Helping to ensure immediate access for first responders, and preventing potential damage to the pipe Working with our customers and communities where a safety risk has been identified to develop shared solutions Planting new trees at a safe distance from the pipeline and restoring the area to preserve the natural beauty of our communities

Guide to Safe Landscaping Making sure the right plants and trees are located in the right location adds to the safety and natural beauty of your community

Tree-by-Tree Review To help ensure we are only replacing trees that pose a safety concern, we conducted an in- depth review of every tree within 14 feet of the pipeline. The review involves: Analyzing specific vegetation and pipeline data, such as the height and species of a tree and the age and coating of the pipeline Determining if a tree is a manageable risk and can potentially remain with regular monitoring, or an unacceptable risk and must be replaced We also work with a team of certified arborists to help minimize the impacts on vegetation, trees and wildlife habitat Every project and site is individually reviewed by a team made up of biology, cultural and environmental field specialists

Proposed Path Forward Working together with city staff, we have developed a plan for addressing the 192 unacceptable risk city-owned/franchise trees in two stages The first stage entails addressing 120 trees, including: Species: 33 species including Chinese Pistache, Coast Live Oak, Crape Myrtle, Ornamental Pear, Cypress, and Privet Condition: 24 trees identified as dead/dying or in poor condition Diameter at Breast Height (DBH) Range: 0-28” (60% less than 6” DBH) Locations: Along Solano Avenue, Byway East, Stanly Lane, 1st Street, Trower Avenue, and Jefferson Avenue We look to the Tree Advisory Commission for direction on mitigation for the first stage of this work We will continue to evaluate the remaining trees and coordinate with the City to develop a path forward

Community Partnership and Outreach It is important to us that our customers get answers to their questions and support this critical safety work Our outreach includes: Meeting with city officials and staff to discuss the safety risks and work together to plan for gas safety work in public areas Communicating about gas pipeline safety to all residents within 500-feet of the safety work Notifying nearby residents before any safety work takes place Hosting answer centers near work areas Contacting private property owners regarding any safety work proposed for their property We will not move forward with any planned work until we have a signed agreement in place with the customer. As of today, we have reached agreements with over 90% of the property owners in Napa

Tree Notification Prior to any work taking place, we will also post a notification on each tree proposed for removal that includes the following: Scheduled date for work to begin Reason for removal What to expect (i.e. trucks parked in the area) Resources for additional information on PG&E’s gas safety efforts

Restoration Options Option 1: Restoration within the Pipe Safety Zone; This includes low-lying plants and shrubs such as flower beds, lawns, grasses, and mosses (Example: Fremont) Proposed Existing

Restoration Options Option 2: Restoration within the Border Zone and Outer Zone; This includes planting trees and shrubs along sidewalks or medians (Examples: Sunnyvale and Rancho Cordova) Proposed Proposed

Restoration Options Option 3: Other Restoration Opportunities; This includes coordinating with the city on other beautification efforts (Example: Berkeley) Existing Proposed

KMZ Review

Contact Information For questions regarding the upcoming pipeline safety work, please contact Greg Gillis, Local Customer Outreach Specialist, at 1-415-815-7286 or by email at greg.gillis@pge.com For more information, visit us at pge.com/GasSafety To view an online map of our natural gas transmission pipelines, please go to pge.com/pipelinelocations

Thank You