Introduction to Energy Efficient Design

Slides:



Advertisements
Similar presentations
Construction Contracting
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
DATA CONSIDERATIONS Module 3 UNIT IV ADDITIONAL TOPICS " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
SBA Unit 8B: Building Commissioning Prepared By: David J Ellner, PE.
LEAN PROCESS IMPROVEMENT Office of Plan Review & Inspections Wisconsin LEAN PROCESS IMPROVEMENT Office of Plan Review & Inspections Wisconsin.
Jim Pauley, P.E. Vice President, Industry and Government Relations – Schneider Electric Chair, NEMA High Performance Building Council Building Star An.
Sustainability and Commissioning for Military Facilities WHAT IT IS AND WHAT IT IS NOT! Dan Jackson, PE, Vice President Tim Whitley, PE, CxA, CCP, LEED.
How to Hit a Homerun Saving Energy and Updating Facilities Presented by Shirley McNutt.
EFFECTIVE COMMISSIONING PROPOSALS Presented To: High Performance Buildings 2006 Las Vegas, April 7, 2006 Presented By: Rebecca T. Ellis, PE LEED® AP, CCP,
Building Enclosure Commissioning (BECx): Practical Project Implementation.
ASHRAE Guideline The Commissioning Process Building Commissioning Association Northeast Chapter Thomas Anderson, CCP.
Design Envelope Pumps – Value Proposition 2012 Lowest Installed Cost Lowest Life Cost.
University of Alabama Electrical & Computer Engineering Electrical and Computer Engineering Capstone Design Experience at The University of Alabama: Challenges,
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Designing Your Project Output Achieving your objectives by targeting your audience Ken Peffers UNLV February 2004.
ESTIMATING By Laith Jacob.
© 2011 John Wiley and Sons, Inc. All Rights Reserved Selection and Procurement for the Hospitality Industry Purchasing ANDREW HALE FEINSTEIN AND JOHN M.
The Software Product Life Cycle. Views of the Software Product Life Cycle  Management  Software engineering  Engineering design  Architectural design.
Genesis Solar Module Brochure ™
Honoraria for Design Build Projects Methodology Assessment Matrix.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
What Do Inspectors Need To Know About BMPs? Tim Zimmerly, Terrill Lemke Los Alamos National Laboratory LA-UR
Capital Project Process
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
DESIGN-BUILD The Culture of Builders The “Design–Builder" is typically a general contractor. Some design–build firms employ professionals from both the.
Software Engineering Saeed Akhtar The University of Lahore Lecture 8 Originally shared for: mashhoood.webs.com.
Advanced Project Management Project Procurement/Contract Management Ghazala Amin.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Army National Guard Readiness Center Arlington, VA Arne Kvinnesland Construction Management AE Senior Thesis Final Presentation, Spring 2010 The Pennsylvania.
Template v5 October 12, Copyright © Infor. All Rights Reserved. 1 Infor LN: v v10.4 Estimating Differences Rollout training.
Information Systems Engineering. Lecture Outline Information Systems Architecture Information System Architecture components Information Engineering Phases.
Preparing the Bid Package (A Developers Perspective)
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Predesign Conceptual Design Design Development Detailed Design & Documentation Construction Operations and Maintenance.
An Introduction To Food Service Consulting FCSI & AIA Working Together.
Contracting for Commissioning Services A Priority for Facility Owner’s and Program Managers Matt Ferreira, CxA, LEED AP October 14, 2008.
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
Contractor Alternate Design Serving the Public’s Best Interest.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Getting Ready for Net Zero Laurie L. Goscha, Bailey Edward Sachin Anand, dbHMS.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
Constructing Recreation Facilities 8 chapter. Groundbreaking Before the construction begins, a groundbreaking ceremony is often held in recognition of.
The Intricacies of the Beginning and the End of a Project CM Leadership Manual Presented by: Todd Scholtz, LEED AP Carlos Sanchez, LEED AP BD+C.
Construction Documents Drawings Specifications Bid documents Construction Sketches and other data.
Chapter 8 Construction. Groundbreaking Before the construction begins, a ceremony is often held to recognize the official start of the project. This step,
Continuing education: Delivering Quality Programs Across Texas
Student Activities CRC Workshop
Yukon Government 3rd Annual Industry Conference
BIM EXECUTION PLANNING PROCESS
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
An Analysis of Project Management Practices Related to Constructability followed in Indian Construction Industry Sharmin Khan Assistant Professor, Department.
MULTI-PURPOSE DOCK GARY PAXTON INDUSTRIAL PARK | SITKA, ALASKA
Business System Development
The Life Cycle of a Project – START to FINISH
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Designers’ Manual Overview and Chapter Contents
BIM EXECUTION PLANNING PROCESS
TEAM NAME. TEAM NAME Additive Manufacturing Business Model Workshop Day 2 Outbrief 31 May 2018.
EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE
PROJECT DELIVERY METHODS
Student Activities CRC Workshop
P-100 Industry Day 29 November 2007.
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
DBIA Manual of Practice
System Construction and Implementation
Requirements Engineering
Construction Management Services April 16, 2018
Honoraria for Design Build Projects Methodology Assessment Matrix
Presentation transcript:

Introduction to Energy Efficient Design Presented to: Energy Design Conference Preconference Workshop Duluth, Minnesota February 20, 2017 Presented by: Rebecca Ellis, PE, LEED AP BD+C, CCP, CPMP, CxA President Questions & Solutions Engineering, Inc.

Outline Current State of Energy Systems Design Implications for Energy Conservation Costs Barriers to Improvement

Introductions Presenters Attendees Minnesota Power Representatives

Current State of Energy Systems Design “Efficient Design” vs. “Energy Efficient Design” Designer Selection Process Architects Selected by Owners Engineers selected by Architects Fixed fee Commodity perception Necessary evil Current process is “efficient” for project team but not “energy efficient” for owner. NOTE: A “worst case” very cynical perspective – exaggerated for the purposes of this presentation. Not representative of all design professionals or projects. Architects shield owner’s from engineers

Current State of Energy Systems Design Project Design Team Architect Engineers Owner’s Project Manager/Representative Future Users Construction Manager (optional) Future Building Operators (optional)

Current State of Energy Systems Design Engineering Design Process Building and space types definition by Architect Energy systems schematic design narrative Based on last “similar” project Corporate standard template Design Development Block load calculations Coordination with Architect for space requirements Rough lay-out of equipment and major distribution routes

Current State of Energy Systems Design Engineering Design Process (cont’d) Construction Documents Delay as long as possible due to ever-changing Architectural plans Detailed load calculations Final equipment selections, layout, and distribution sizing Corporate standard specifications O&M training requirements O&M documentation requirements Punchlist & Closeout

Current State of Energy Systems Design Engineering Design Process (cont’d) Operations & Maintenance Planning Design engineers with little or no systems operations experience Industry standard boilerplate O&M training requirements Industry standard boilerplate O&M documentation requirements Industry standard boilerplate specifications = common knowledge of what is expected = developed by designers O&M Manuals as a closeout punch list item O&M Training only if requested and at the contractors’ convenience

Current State of Energy Systems Design Engineering Design Process (cont’d) Bid Document Addenda Final coordination details Control system design Low Bidder Selected Final coordination by addenda is the result of Architects ever-changing plans – even up to last minute of Construction Documents.

Current State of Energy Systems Design Project Timeline Owner Schedule Constraints Financing Domino affect of relocating people End of leases

Current State of Energy Systems Design Objective of Design Process? Drawings and specifications for use in bidding Not so much concern about what comes next

Current State of Energy Systems Design Summary Minimal or no analysis of alternate systems Architectural-Engineering integration limited to space requirements Minimal or no systems operations and integration consideration No meaningful, enforceable operations and maintenance planning

Implications for Energy Conservation Minimum Energy Code Compliance Common Systems Potentially Familiar to Building Operators Most likely to be operated as intended – just by chance, not by planning Frustrated Energy-Conscious Owners Inadequate or non-existent design phase comparative systems analysis Design Engineers Familiar with Equipment & Systems Lower risk of design errors, change orders, and/or post-construction troubleshooting Most likely to be operated as intended = reasonable likelihood of achieving close to minimum energy code consumption Minimal design risk = lowered risk of INCREASED ENERGY CONSUMPTION due to an energy efficient system being designed, installed, or controlled inappropriately

Costs Design Fees Procurement & Installation Costs Troubleshooting Costs Remediation Costs Energy Costs Lot of emphasis on Design Fees and Procurement/Installation with little Design Phase consideration of Troubleshooting & Remediation if the Design Phase is not robust. Energy Costs are hit-and-miss on how deeply and meaningfully they are taken into consideration during Design.

Barriers to Improvement Commodity Design Engineering Fees Design Engineers Unfamiliar with New Systems Rushed Design Process Lack of Experience Evaluating Energy System Options Lack of Experience Operating Building Systems High Risk/Low Reward for Innovative Design Design Engineers Unfamiliar with New Systems Design assistance from equipment vendors May not have full understanding of how to design around and integrate new equipment

Preconference Workshop Agenda Lighting & Lighting Controls Design HVAC & Controls Design Case Studies Lessons Learned & Best Practices