Commissioning Planning

Slides:



Advertisements
Similar presentations
Test Automation Success: Choosing the Right People & Process
Advertisements

Plans for LSE-130 through CD-2 Gregory Dubois-Felsmann SLAC National Accelerator Laboratory.
Systems Engineering Breakouts George Angeli. Tuesday 11am Current Commissioning Plans – Chuck Claver Revised commissioning timeline Development plans.
May 17, Capabilities Description of a Rapid Prototyping Capability for Earth-Sun System Sciences RPC Project Team Mississippi State University.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
Effective Methods for Software and Systems Integration
Commissioning the NOAO Data Management System Howard H. Lanning, Rob Seaman, Chris Smith (National Optical Astronomy Observatory, Data Products Program)
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
Control Software Integration German Schumacher T&S Software Lead.
Framework for Compliance, Verification, and Non-Conformance George Angeli LSST All-Hands Meeting Bremerton August 17, 2015.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
Telescope Integration and Tests Tuesday Afternoon.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
Test and Integration Robyn Allsman LSST Corp DC3 Applications Design Workshop IPAC August , 2008.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
LSST VAO Meeting March 24, 2011 Tucson, AZ. Headquarters Site Headquarters Facility Observatory Management Science Operations Education and Public Outreach.
Proposal: staged delivery of Scheduler and OpSim V1 (2016) meet most of the SRD requirements – Deliver a system that can be extended with an improved scheduler.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
International Data Centre October 2015Page 1 Progressive Commissioning Jerry Carter, Senior Scientist W. Randy Bell, Director Gerhard Graham, Coordinator.
1 Board Telescope & Site Tucson, Arizona July 18-20, 2011 LLST Control Software Review Resources Tucson, January
1 OBSERVATORY CONTROL SYSTEM (OCS) FRANCISCO DELGADO OCS CAM.
LSST SLAC Office of Communications August 8, 2016 Communications Roadmap.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
LSST Commissioning Status Update & Overview Charles (Chuck) Claver LSST System Scientist SAC Meeting March 5, 2017.
Camera PDR/CD1 Planning 19 September 2008
Verification Matrix Process
LSST External Communications Suzanne Jacoby, Andrew Gordon Communications Leads at LSST and SLAC August 17,
Accelerator Readiness Review October 31, 2006
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
Jim Fast Pacific Northwest National Laboratory
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
From LSE-30: Observatory System Spec.
Systems Engineering, Verification, and Commissioning for LSST George Z
Community Science Updates
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
LSST Commissioning: FY18 Planning
Software and Systems Integration
GLAST Large Area Telescope:
LSST Commissioning Kevin Reil LSST Commissioning Camera Rep
Software Requirements
Chuck F Claver LSST System Scientist & Commissioning Lead
OCS Scheduler Status Francisco Delgado T&S Software Manager
Overview of the FEPAC Accreditation Process
DOE: Transition from MIE to Early Operations Kevin Reil LSST Camera Commissioning Lead LSST Commissioning Plan Review January 24-26, 2017.
Management Breakout: DOE Budget Summary Vincent Riot LSST Camera Interim Project Manager LSST Commissioning Plan Review January 24-26, 2017.
Management Breakout: MREFC Budget Summary Victor L
X-ray Pump-Probe Instrument
LSST Control Software Integration Francisco Delgado OCS Software Manager LSST Commissioning Plan Review January 24-26, 2017.
Software & Hardware for Wavefront Estimation Pipeline Development Te-Wei Tsai Software Engineer Joint Technical Meeting March 6, 2017.
Lockheed Martin Canada’s SMB Mentoring Program
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
Overview of Science Verification Plan Keith Bechtol and Zeljko Ivezic LSST Commissioning Plan Review January 24-26, 2017.
Reliability Standards Development Plan
Mark McKinnon EVLA Project Manager
Observatory Science Operations
NERC Reliability Standards Development Plan
Observatory Science Operations
NERC Reliability Standards Development Plan
PSS verification and validation
DOE Review of the LCLS Project October 2006
Preliminary Project Execution Plan
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Commissioning Data – Who and Why?
Institutional Self Evaluation Report Team Training
NMDWS Internship Portal
Presentation transcript:

Commissioning Planning 1

Data Access Centers plus Science-EPO user Interfaces The LSST Observatory System will conduct 10-year multi-color survey, process, archive, and serve images and data products to a broad and diverse community of users 8.4m Wide Field Telescope + Data Access Centers plus Science-EPO user Interfaces 3.2 Gpix Camera

Outline Workshop agenda and objectives Critical Dates Strategic overview of the Commissioning Plan Work plan for next 5 months 3

Workshop Agenda 09:00 – 09:15 Workshop Scope & Objectives (Claver) 09:15 – 10:00 Commissioning Overview & Near Term Plans (Claver) 10:00 – 11:00 System Verification Planning Timeline and Plan (Angeli – 40min) Verification Matrix Process (Selvy – 20min) 11:00 – 11:15 Break 11:15 – 12:15 Camera I&T Planning & Commissioning Preparation (Reil) 12:15 – 13:00 Lunch 13:00 – 14:00 Telescope & Sit I&T Planning & Commissioning Preparation (Sebag) 14:00 – 15:00 DM I&T Planning & Commissioning Preparation (K-T Lim) 15:00 – 17:00 Upacking commissioning usecases to scope required database funtionality (All) 4

Workshop Objectives Establish expectations and schedule to support a January ComPDR Review scope and definitions of LSST Commissioning Establish expectations to support system verification Evaluate expected state of subsystems at commissioning onset Identify conflicts in subsystem I&T plans impacting commissioning 5

Critical Dates

Commissioning PDR (ComPDR) Mid to late January 2017 – CD-2 like in scope Set new baseline of the integrated NSF + DOE commissioning plan: - Schedule + Budget + Staffing Profiles w/BOEs - Includes “pre-Commissioning” development and preparation effort Subsystem AI&T pathways into commissioning Demonstrate feasibility and tool prototypes

Critical Dates 11 weeks January 21, 2017 Commissioning PDR December 15, 2016 ComPDR Director’s Review November 17, 2016 CCB Meeting to approve new baseline November 7, 2016 New baseline & Change Request complete October 31, 2016 Commissioning activity schedule complete September 15, 2016 Updated commissioning design w/DM integration and site specific plans August 31, 2016 Basic NSF + DOE re-plan established 11 weeks

Scope & Definitions of the Commissioning Plan

Commissioning Scope The LSST Commissioning Plan covers the final system level assembly, integration and testing (AI&T) of the three primary subsystems – Telescope, Camera and Data Management – plus the infrastructure supporting EPO and Headquarters operations into the LSST Observatory System. Commissioning includes DOE “early operations” funded (non-MIE) activities.

Commissioning Scope The Commissioning Plan is derived from the following inputs: System level verification plan per LSE-160, including the SysML based verification event sequences and logic; Subsystem assembly, integration and test plans (T&S: LTS-104; Camera: LCA- 40; DM: ???) with subsystem requirements identified that can only be verified once commissioning starts; Scientifically motivated system performance characterization; and Technical optimization of system operations.

Commissioning Definitions A useful guiding principle for commissioning boundary definition follows: An activity is considered part of commissioning when it involves a “delivered” component from one of the subsystem “touching” that of one of the other subsystems.

Commissioning Definitions Commissioning activities involving Data Management starts when components receive “real data” from one of the principal sources, including the Auxiliary telescope/instrument, ComCam or the full Science Camera. First calibration data from Auxiliary Telescope: August 2018 First on-sky and calibration images with ComCam: September 2019 Sustained observing with ComCam: February 2020 Images from Camera re-verification at Summit Facility: June 2020 First on-sky and calibration data from Camera+Telescope: October 2020 Sustained scheduler driven observing with Camera+Telescope: January 2021 Start Science Verification mini-Surveys: April 2021

Commissioning Definitions Commissioning activities involving the Camera begins with shipping from SLAC to Chile and re-verification on the Cerro Pachon summit. Re- verification activities of the Camera will be led by DOE personnel, but coordinated through the Commissioning team and plan. These activities are currently scheduled to start February 14, 2020 with a Camera Pre-Ship Acceptance review at SLAC.

Commissioning Definitions Significant commissioning activities involving the Telescope & Site starts with the arrival of ComCam in Chile leading to the beginning of Phase 1, Early System AI&T. These activities are currently scheduled to start April, 2019 when ComCam is delivered to the Summit Facility. Note: The auxiliary telescope is scheduled to begin observations in August 2018.

Commissioning Phases Pre-Commissioning - Test procedure definition - Test analysis script development using the LSST code base - Procedure & script validation with simulation tools - Special hardware/software development Phase1: Early System AI&T with ComCam - early interface testing - telescope alignment and AOS control - subscale DM pipeline testing Phase II: Full System AI&T with Science Camera - camera-telescope integration, alignment & AOS control - full scale DM pipeline testing Phase III: Science Verification - Operations readiness with mini-Surveys and Data Releases

Plan Status: Phase I A single raft camera operating as a surrogate of the full science camera. Utilizes as many Camera system interfaces as possible: CCS-OCS: Command/Control SDS-DM: Image data delivery WDS-TCS: Wavefront sensing GDS-TCS: Guiding Early Camera refrigeration testing Early interface testing and optical alignment with active optics control Early testing of science pipelines Conceptual layout of ComCam with Camera surrogate mass integrated to rotator interface and telescope integrating structure. Detailed design now underway.

Full scale science processing and algorithm testing Plan Status: Phase II Camera integration, calibration and full field optical alignment with AOS control Scheduler testing & optimization Full scale science processing and algorithm testing Data Management integration focus includes: Instrument signature removal calibration and verification Full scale calibration products production Full scale Level 1 alert production testing Camera-Telescope integration focus includes: Physical installation and basic functional checkout Final calibration and verification of active optics look-up tables and optical feedback Integrated system requirements verification (OSS) OCS sequencing & functional interactions with scheduler driven observing

Full scale science pipeline processing Plan Status: Phase III Science verification focuses on characterizing the survey data performance properties defined in the LSR/SRD. Verification matrix filled in with compliance and characterization data. ORR mini-Surveys Full scale science pipeline processing Example sky coverage from a 30-day mini-Survey with a mean visit density of 6 visits per unit area.

Work Plan for getting to ComPDR

Elements of the re-plan Clearly defined management structure and lines of responsibilities/authority An integrated (DOE+NSF) commissioning activity schedule resource loaded by location and skill category (individuals identified where possible).  This schedule will also include early preparatory work. The Commissioning planning structure will be updated to include: Data Management components - infrastructure, services and payloads (pipelines and databases) Education and Public Outreach deliverables – data center and services Location specific activities for main LSST facilities Budget and staffing profile supported by DOE Early Operations Funding

Elements of the re-plan Re-baseline MREFC plan to include early preparatory work Requirements for additional tools (hardware and software) needed by the Commissioning plan Update required pre-conditions for each subsystem prior to entering commissioning

Verification Event Integration Dir. Rev. ComPDR Pre-Com Dev. Phase I: Early AI&T Dev. Phase II: Full AI&T Dev. Phase III: Sci. Ver. Dev. Verification Event Integration

Required Subsystem Input: Camera Required inputs: Identify non-MIE work scope Shipping plan On-site re-verification plan Summit Facility build out plan – support systems & clean rooms ??? Commissioning test plan

Required Subsystem Input: Data Management Required inputs: Site specific test plan following expected data progression Chilean DAC build out plan NCSA build out plan Commissioning test plan ???

Required Subsystem Input: Telescope & Site Required inputs: I&T plan with a clear transition to commissioning Commissioning test plan ???