Common Problems with Performance/Testing of Batteries

Slides:



Advertisements
Similar presentations
Current Electricity - Symbols
Advertisements

Beckett Energy Systems
1. Four LLs were published in February Transmission Relaying – Undesired Blocking 2.Lack of Separation for Critical Control Power Supply Leads.
1 CNS/GSS/2008/M1 1 Module 1 Basic Terminologies and Characteristics of Switchgear.
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
EQUIPMENT VALIDATION.
Chapter 5 – Series Circuits
UN Informal Working Group Meeting on Lithium Battery Tests Ideas to Address Problems Testing Large and Small Cells and Batteries George A. Kerchner Executive.
Chapter 5 – Series dc Circuits
Federal Aviation Administration 0 Intermixing of Cells in Nickel-Cadmium Batteries for Aircraft Usage May 11, Intermixing of Cells in Nickel-Cadmium.
September 2014 Lesson Learned Summary. September 2014 LLs 2 Three NERC lessons learned (LL) were published in September 2014 LL Redundant Network.
EKT214 - ANALOG ELECTRONIC CIRCUIT II
Chapter 5 – Series dc Circuits Introductory Circuit Analysis Robert L. Boylestad.
© 2012 Delmar, Cengage Learning Battery Service Chapter 27.
During a mains supply interruption the entire protected network is dependent on the integrity of the UPS battery as a secondary source of energy. A potential.
Chapter 8 Electrical and RF Safety Basic Safety Have a master on/off switch for your station. Don’t work on “live” equipment. Check with a meter first.
Bonding, Grounding and the NEC  Presented by The National Association of Certified Home Inspectors
+ -. Methode Connector  This is the standard USGS connection for the DCP.  Some manufacturers do not recommend using a methode connector. However, we.
Purpose Power lines Equipment Assured Grounding GFCI Conclusion.
Techniques for establishing and maintaining constant temperature in ICT systems in order to reduce energy consumption Mihail Radu Cătălin Truşcă, Ş. Albert,
Scheduled Versus Event Driven Testing of Distribution Protection IEDs Dr. Alexander Apostolov, Benton Vandiver, Will Knapek, OMICRON electronics.
1 ISTOG Position on Pre-conditioning ISTOG Input on Interpretation and Clarification Of NUREG-1482 Sections 3.5 / 3.6.
Electrical Installation 2
Settings & Adjustments. Settings & Adjustments.
Smitty’s Speed Drills 2008 Code Drills Health Care Facilities (C) Copyright 2008 Ted "Smitty" Smith1.
Utility Engineers, PC.  Generation  Transmission  Distribution.
1 Review of Specifications for Digital Upgrades NHUG Summer Meeting July 17, 2008 Tim Mitchell Component Engineering Palo Verde Nuclear Generating Station.
A Training Presentation On 132 KV GSS JAIPUR Submitted in partial fulfillment For the award of the degree of BACHELOR OF TECHNOLOGY Submitted To:- Submitted.
Preventing Voltage Sags and Interruptions. # Equipment supplier awareness: # Customers level protection: # Utility level protection: - Sag magnitude and.
Electronic Detonators
NERC BAL-005, BAL-006, FAC-001 Gary Nolan WECC ISAS April 20, 2016.
Technical Panel Session. Sunday January 11, DC System Failure Modes IEEE PES SBC Winter Meeting. January 11 – 15, New Orleans, LA Part 3.
E VERY L IFE H AS A P URPOSE… Instrument Selection.
Rev. 1 © Chevron 2009 Hot Work Awareness Plus. Rev. 1 © Chevron Training Objectives  To explain the type of work which may constitute Hot Work.
Facts About the Dell Inspiron 1525 Laptop Battery When it comes to laptop batteries, the level of confidence we have in our original ones or the.
Electrical Distribution Analysis & Testing Everything You Need To Know About Power Distribution By Current Solutions PC.
Practical Testing Issues Real Life Issues Bob Beavers June 12,
John Polenz Emerson Network Power Liebert Services.
Unit 11: Calibrating Instruments
Charging System Testing and Service
Warm-Up: April 13/14, 2016 A 9.0 V battery is connect to a 8250 Ω resistor. How much current flows through the resistor? What is the power consumed by.
ACCEPTANCE PROCEDURE FOR ALL SHIPMENTS
Energy Storage & Stationary Battery Committee
Motorola Solutions Internal Information
Clinical engineering Lecture (7).
Safety and Security of Radiation Sources
The D.C. Scout Battery Distribution System Ground Locator
Chapter 31 Battery Systems.
2014 NEC – Code Changes Pertaining to Wiring Devices
HVI HIPOT TEST SET Pft sERIES.
APPLICATIONS Reference: Textbook-Chapter 6,8 & 9 'Power Electronics',C
FIGURE 17-1 A visual inspection of this battery showed that the electrolyte level was below the plates in all cells.
Indian Grid Code and Commissioning Test Procedure Dr
Personal Protective Equipment
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
NICET Fire Alarm Tech Level 1 Practice Test # 10
Sizing Methodologies • Sizing Calculations
SAFE WORK INSTRUCTIONS
Interconnection of AES With The Grid
Motorola Solutions Internal Information
Creating Circuit Diagrams
Lithium Ion Battery Safety
SAFE WORK INSTRUCTIONS
SAFE WORK INSTRUCTIONS
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
Series 5300 Lithium Cell Formation System
2008 Code Drills Health Care Facilities
23.2 Applications of Circuits
Presentation transcript:

Common Problems with Performance/Testing of Batteries Surendra (Sal) Salgia Exelon Generaration 6-12-16

Definitions Acceptance Test: A constant‑current or constant‑power capacity test made on a new battery to confirm that it meets specifications or manufacturer's ratings. Capacity Test: A discharge of a battery at a constant‑current or constant‑power to a specified terminal voltage. Duty Cycle: The loads a battery is expected to supply for specified time periods while maintaining a minimum specified voltage.

Definitions Performance Test: A constant current or constant power capacity test made on a battery after it has been in service, to detect any change in the capacity Service Test: A test in the “as found” condition of the battery’s capability to satisfy the battery duty cycle Modified Performance Test: A test, in the “as found” condition, of battery capacity and the ability of the battery to satisfy the duty cycle.

Critical Attributes for Successful Discharge Test Test Equipment Hookup: Use of clear labeling on the cables and protective devices. Ensure that all power cables, protective devices are properly sized and rated for DC applications. Test Equipment Power Sources: Loss of AC power to the discharge test equipment will cause an interruption in the battery discharge load test. This could invalidate the test and require the battery to be recharged and re-tested. Ground Fault Circuit Interrupter (GFCI): Unless a GFCI is clearly required by site procedures and policies, they shall not be used in battery testing power circuits.

Critical Attributes for Successful Discharge Test Load bank operation: Ensure all load bank cooling fans, resistors, contactors, and fuses are intact and operating properly Controller configuration: Laptop computer settings should be checked prior to every test to ensure that have not been altered since the last test. Test instrument calibration: Test instruments (Voltmeter, Clamp On Ammeter, Stop Watch etc.) used to satisfy Technical Specification surveillance parameters must be certified / calibrated. Use of redundant instrumentation is recommended to provide additional assurance in the event an instrument is lost, broken or found out of calibration.

Critical Attributes/IEEE-450 Alarm and Shutdown Values: Alarm values are typically set to alert test personnel that the battery or cells within the battery string have reached an alert level. Frequency of Conducting Battery Discharge Testing Per IEEE-450: Acceptance Test at Factory or upon initial installation as determined by the user Performance test within first two years of service. Additional performance tests at five year intervals until the battery shows sign of degradation A service test of battery capability may be required by the user to meet specific application requirements

Discharge Test Interruptions Interruption of a service test or the service test portion of a modified performance test is not permitted. An interruption of a fixed rate performance or capacity test is clearly addressed in IEEE-450, which provides up to a 6-minute interruption. A short interruption during a performance test does not have a significant impact on the capacity evaluation of the battery.

Common Problems with Performance /Acceptance Testing Conclusion: Plan ahead Follow safety STAR Questions: ???