Slides:



Advertisements
Similar presentations
Chapter 2- Visual Basic Schneider1 Chapter 2 Problem Solving.
Advertisements

Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Appendix.
SDC PUBLICATIONS © 2011 Chapter 11 Assembly Drawings and Blocks Learning Objectives:  Create an Assembly Drawing from Part files.  Using AutoCAD with.
TECHNICAL THEATRE I STAGECRAFT
AWG 36, 0.2 A 0.3 mm Heat Shrink Tubing t = 0.38 mm Silicone Coating t = 0.2 mm D = 3 mm Shielding: Copper Tape AWG 26, 2.2A 0.6 mm AWG 26, 2.2A 0.6 mm.
Streamlined Action Plan Code Review Process Ken Kopatz Software Process Improvement Network (SPIN) Meeting 30 June 2000.
1-2 Training of Process FacilitatorsTraining of Coordinators 3-1.
Multimedia Modules Teaching and Learning Multimedia Applications with Written Scripts John Bowers, Director of Computing Services Pam Gades, Instructional.
Robot Quick Build Session RQBS Intro - Instructions Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to Oklahoma.
TSI Plastics, Inc.. o TSI Plastics has been servicing the Aerospace & Defense Industries since 1959 as a contract manufacturer of custom fabricated parts.
INFO 637Lecture #31 Software Engineering Process II Launching & Strategy INFO 637 Glenn Booker.
Our concept was that we could effectively make a solar powered light that attaches to a hard hat and will provide a worker with adequate light when working.
THIN CLIENT COMPUTING USING ANDROID CLIENT for XYZ School.
SRA Lab Safety & Proposal PowerPoint Project This is a Partnered/Group Assignment Tech Ed - 9 Lab Safety & SRA Proposal Report Mr. Saunders Remember: This.
1. 2 IMPORTANCE OF MANAGEMENT Some organizations have begun to ask their contractors to provide only project managers who have been certified as professionals.
Control System and Electrical Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Monica Ballay Data Triangulation: Measuring Implementation of SPDG Focus Areas.
Safety First!. 1.Wear Goggles 2.Know your tools 3.Make sure all your wires are waterproofed 4.Document all circuits as you wire the control box 5.Prepare.
Question 1 Why did a majority of students perceive the innovative web-enhanced Japanese language courses favorably and participate in additional online.
August 2012 Laurene Beto Annie Kretowicz Taura Anderson.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Appendix B Rapid Application.
Hand Tools. 1. Adjustable Wrench Adjustable Wrench Turning various size nuts and bolts.
Principles of Managerial Accounting Chapter 9. Budgeting A good budgeting system must provide for both planning and control. Planning involves developing.
Production Lab Safety By :Patrick Wiswell Sept 25/05.
Introduction Produced by Ron Markum, Team 1750 Ed Latimer, Team 476 Ken York, Team
Powers and roots. Square each number a) 7 b) 12 c) 20 d) 9 e) 40 a) 49 b) 144 c) 400 d) 81 e) 1600.
Kaizen Event Flow Kaizen Facilitation Project Management.
Defining Project Scope Research has demonstrated that a clearly defined project scope is a major component of project success. A clearly defined project.
SJDAdvisory Committee May Production & Maintenance Steven J. Durand May 2006.
CSCI-256 Data Structures & Algorithm Analysis Lecture Note: Some slides by Kevin Wayne. Copyright © 2005 Pearson-Addison Wesley. All rights reserved. 18.
Coordinating Other Services Module 3 Level 2 Meeting Preparation and Management.
Tool Identification 1. Adjustable Wrench 2. Allen Wrench.
Chapter 7 Preliminary Construction The broad scope of implementation Preliminary construction in the SDLC Preliminary construction activities Preliminary.
Business Excellence Monthly Report-Out Site: Montreal Report Date: January 4 th 2007 Site GM : Jean Lafrance Site BE Lead : Nathalie Lecours.
1. WHAT IS A PROJECT? “A project is a problem scheduled for solution.” This definition forces us to recognize that projects are aimed at solving problems.
Soldering Building permanent circuits. Soldering accomplishes two things Electrical connections Mechanical connections.
Systems Development Life Cycle
© Janice Regan, CMPT 300, May CMPT 300 Introduction to Operating Systems Operating Systems Overview: Using Hardware.
Introduction Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
A Quick Review of the Components THE DMAIC CYCLE.
 cRIO with all modules & connectors and cables for each module.  Digital sidecar with all connectors and cables.  Panel signal light indicator & connector.
The mailroom receives customer orders from customers, where clerks sort orders from the rest of the mail, group them into batches, prepare a transmittal.
Copyright © by the NCCER, Published by Pearson Education, Inc. Core Curriculum: Introductory Craft Skills Module National Center for Construction.
L5 Computing Team Project Final Presentation Guidelines.
Pre-planning Planning to plan (and adapt) Implementation starts Here!
Chapter 5- Assembling , Linking, and Executing Programs
Now every configuration is possible
Dynamics GP Manufacturing
Small Engine Tool ID Part 1.
ZPS Foot and Ankle Display
Manufacturing Specification – Due Monday 22nd February 2016
Dimensioning can be overwhelming at first....
and Executing Programs
Company Profile About JAVA-TECH : Cable assembly Wire harness
Selection of Instructional Methods and Media
بسم الله الرحمن الرحيم هل اختلف دور المعلم بعد تطبيق المنهج الحديث الذي ينادي بتوفير خبرات تعليمية مناسبة للطلبة ؟ هل اختلف دور المعلم ؟ ن.ن. ع.
NCB® Distal Femoral Workshop
Project Title, date “Team Name: Team members, …”
IENG 451 / 452 Standardized Work Lab: Work Cells, Standardized Work
goteachmaths.co.uk Volume of a Cuboid – Complete Lesson
Multiplying binomials the Break up out of jail method
The mailroom receives customer orders from customers, where clerks sort orders from the rest of the mail, group them into batches, prepare a transmittal.
Brainstorm Cloud Use this page to list your 10 technological advances. Begin discussing your group’s strategy for taking pictures and integrating them.
Instructions for Density Lab
Pair work – Do you want to change seats??
Engine Part ID Part 2.
Multiplying binomials
AGENDA Introductions Review Goal, 3 strategies, Case for Change
SOFTWARE PROJECT MANAGEMENT KEY TOPICS
Multiplying binomials
Presentation transcript:

Strategy General Strategy: Workshop leaders manage timing and QC. (1) Modules are have well-defined boundaries and scope, and firm build schedule exists; (2) Material inventory is done with Visual Inventory Cheatsheets; (3) pair up on Module Build; firm schedule and cutoff exists for each module, and one person in team finishes up as other person continues to next module; (4) work in pairs during Module Assembly. (5) diffuse learnings and work as a group to achieve fusion. QC Strategy: QC occurs at build stations by: (1) prepared checklist rintouts; participants checking offworkshop leaders. Once all modules are built, they go to a quality control table, and are controlled as a group of 12 identical modules. Statistics are taken: number of errors per batch. Definition of Success: EVERYONE finishes in time up to successful print of a calibration cube. This is a Team Effort. Fusion is defined as instructors not being a bottleneck - towards the point where the build runs itself by diffusion of learning.

Tools Critical: Combination square 2-ended 2 & 2.5 mm hex wrench (3DP) 3 mm + 4 mm hex wrench 5.5 mm wrench Philips screwdriver Soldering iron + solder Heat shrink + heat gun Flush cutter

Overall Workshop List 10 part trays, 1 per printer Tripod + camera - for time lapse Computer Demo 3D printer Demo module set for 3D printer Joshua’s printer 12 printer sets Visual BOM sheets 1 tray of tools Soldering station + Solder Electrical tape Portable printer for printing out QC instructions