ENVIRONMENTAL IMPACT ASSESSMENT (EIA)

Slides:



Advertisements
Similar presentations
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Advertisements

Federal Energy and Environmental Regulation Agencies and Laws
Energy National Policy Statements Anne Stuart DECC Energy Development Unit 22 October 2009.
PREPARED BY- NABANITA SHARMA M.E. 3 RD SEMESTER ROLL NO.-10/12.
Biodiversity in Vietnam
Writing a Preliminary Assessment (The example of the Environmental Review Report) [DATE][SPEAKERS NAMES]
Energy National Policy Statements Nick Cooper DECC.
Possible environmental impacts of 25 th UNIVERSIADE Winter Games in Erzurum Emine Bilgen EYMİRLİ Dr. Süleyman TOY Dr. Rıfat ALTAN Northeast Anatolia Development.
© 2005 West Legal Studies in Business, a division of Thompson Learning. All Rights Reserved.1 PowerPoint Slides to Accompany The Legal, Ethical, and International.
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
Federal Energy and Environmental Regulation Agencies and Laws
Foster and sustain the environmental and economic well being of the coast by linking people, information, and technology. Center Mission Coastal Hazards.
Programmatic Environmental Impact Statement Experimental Permits COMSTAC Stacey M. Zee October 25, 2006 Federal Aviation Administration.
Establishing SEA Guideline for Environment friendly Water Resource Development Young-Il Song.
Investing in the logistics necessary for Africa's Oil and Gas Industry.
Ecosystem Vulnerability Profile. Ecosystem Resources Vulnerability Profile What values and benefits do natural resources provide? What natural resources.
Knowledge on HIA IN CAMBODIA Constructing a Caring and Sharing Community Roles of HIA 4-6 October 2012 Bangkok.
Scoping An activity within the Environmental Impact Study which aims to identify those components of the biophysical and social environment which may be.
Chapter 45 Environmental Protection and Global Warming.
Characterization Report Module 2: Water Budget, Pressures and Impacts, Significant Water Management Issues, Monitoring, Characterization Report Characterization.
BIODIVERSITY CONSERVATION, AND ADAPTATION ASPECTS IN NATIONAL STRATEGIES ON POVERTY REDUCTION (NS- PR), SOCIO-ECONOMIC DEVELOPMENT PLAN (SEDP)
Flintstone-Oldtown Planning Region Comprehensive Plan Kick-Off Meeting June 23, 2010 Insert pictures.
Jeopardy $100 Land + SeaTrash/MinesPollutionWater Miscellaneous $200 $300 $400 $500 $400 $300 $200 $100 $500 $400 $300 $200 $100 $500 $400 $300 $200 $100.
Synopsis EIA Purpose of EIA Origin Key Elements NGO Participation Content Analysis 1.
Spatial Planning in Germany Principles The preparation of spatial plans and their implementation are principally independent from each other. A town planning.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
Case study: SEA for land-use plan amendments of Krasna Hora municipality.
EIA in Pakistan Brief background and History of the National EIA system. It started with the promulgation of Pakistan Environmental Protection Ordinance.
Chapter 46 Environmental Law Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent.
Status of Environment Statistics in Mauritius Workshop on Environment Statistics & Accounts Central Statistics Office.
Reclaimed Wastewater Quality Criteria, Standards, and Guidelines
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
Strengths and weaknesses of the permitting system and enforcement process in RIEW – Veliko Turnovo Regional Inspectorate of Environment and Water - Veliko.
Sample Codes of Ethics in Adventure Tourism
CORPS OF ENGINEERS REGULATORY PROGRAM PUBLIC INTEREST REVIEW (33 CFR Part 320) August 12, 2005.
Chapter 39 Environmental Law. 2  Under what common law theories may polluters be held liable?  What is an environmental impact statement? What is the.
Starter: Look at the photograph. This is the site for a proposed coal mine, providing essential fuel for the community. In pairs: Discuss whether you think.
Unit 4 revision Area of Study Knowledge and evaluation of the contemporary state of natural environments and the importance of healthy natural environments.
Monitoring Programme. What is monitoring? Environmental monitoring is the systematic observation, measurement and calculation of the condition of the.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Comprehensive Plan Update. General, far-reaching vision to benefit the whole community Takes a long term view of issues Focuses on physical development.
24 August 2007 EDR Effort 1 CF&S Environmental Process for an Americas Regional Effort EDR Planning Jerry Aarons & Rod Walton.
Potential Impacts on Biodiversity and Livelihoods Win Maung Chairman Myanmar Environment Institute (MEI)
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Siting Strategies.
Community Development Department FUTURE LAND USE MAP AMENDMENT LU-MIN & RZ-OTH
White Hill Middle School Initial Study/Mitigated Negative Declaration Ross Valley School District Community Meeting November 1, 2011.
Planning Scotland’s Seas consultation Seas Consultation 2013.
ENVIRONMENTALS LAWS AND ACTS. 1 Established air pollution regulation for key pollutants enforced Set goals and standards for the quality and purity of.
A Sustainable Tourism Framework for the Caribbean Mercedes Silva Sustainable Tourism Specialist Caribbean Tourism Organization “Ma Pampo” World Ecotourism.
Introduction to Environment. Environment : from the French word ‘environner ‘- to encircle or surround Whatever is around us constitutes our Environment.
Introduction to Environment. Environment : from the French word ‘environner ‘- to encircle or surround Whatever is around us constitutes our Environment.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
CE 360Dr SaMeH1 Environmental Eng. 1 (CE 360) Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah University.
ISO Session 3 Environmental Management and Ethics in Management.
Federal Energy and Environmental Regulation Agencies and Laws
Draft Environmental Assessment Report for Bradley International Airport October 2016
The JMWP Consultation Visit frackfreeyork.org.uk for a link to the consultation page Download parts A and B of the publication response form if you plan.
Environmental Laws.
Overview What is the CEQA environmental review process?
GEOLOGICAL AND ENVIRONMENTAL INVESTIGATIONS OF BRIDGE PROJECTS
CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional Authority
GEOLOGICAL AND ENVIRONMENTAL INVESTIGATIONS OF HIGHWAY PROJECTS
SEQRA as a Tool to Review Energy Projects
GEOLOGICAL & ENVIRONMENTAL INVESTIGATIONS
Photovoltaic Systems Engineering Utility Scale Development:
Ecological and Environmental Stability
Pre-Proposal Conference March 27, 2019, 1:00 p.m.
Environmental Priorities Environmental Impact Assessment
Chapter 45 Environmental Protection and Global Warming
Camarillo Springs Project Draft EIR Scoping Meeting
Presentation transcript:

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) TOTAL 28

INTODUCTION TOTAL 28

National Environmental Impact and its Implementation National Environmental Policy Act (NEPA)-1969 (PL-91-190) Effective on January 1, 1970 (First signed act--Magna Carta for the envt.)   total 31

Project planning and decision making should include consideration of Technical (satisfy the standards) Economic (should be feasible) Environmental (EIA) Social (benefits to social life) Other factors total 31

Environmental Inventory Environmental Impact Assessment Terminology Environmental Inventory Environmental Impact Assessment Environmental Impact Statement total 31

Environmental Inventory Complete description of the environment as it exists in an area where a particular proposed action is being considered. compiled from a checklist of descriptors for the physical/chemical, biological, cultural and socioeconomic environments total 31

Natural Environment (Bio-physical envt.) Physical-chemical environments: soils, geology, topography, surface-water and ground water resources, water quality, air quality and climatology. Biological environments: flora fauna of the area, including species of trees, grasses, fish, birds, and mammals. total 31

Man-made environments Cultural Environment: Historic and archeological sites and aesthetic resources such as visual quality. Socio-economic Environment: Humans in the environments including population trends and population distributions; economic indicators of human welfare; educational systems; transportation networks and other infrastructure concerns such as water supply, wastewater disposal and solid-waste management; public services such as police and fire protection and medical facilities. total 31

Health Impacts of the projects, plans, programs or policies should be considered in the decision making process. In developing countries----Environmental health assessment (EHIA) process has been proposed (WHO-world health organization 1987) Nuclear power plants--- Address psychological impacts “can change damage your mental health, 1982” total 31

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) Systematic identification and evaluation of the potential impacts (effects) of proposed projects, plans, programs or legislative actions relative to the physical-chemical, biological, cultural and socioeconomic components of the total environment. TOTAL 28

The primary purpose of the EIA process, also called the “NEPA process” is; to encourage the consideration of the environment in planning and decision making, to ultimately arrive at actions which are more environmentally compatible. TOTAL 28

It indicates consideration of aesthetics, wetlands, fish and wildlife values, floodplain values, navigation, recreation, water quality, food and fiber production, mineral needs, economics, general environmental concerns, historic properties, flood hazards, land use, shore erosion, water supply and conservation, energy needs, safety and property ownership. TOTAL 28

FEATURES OF THE NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) National Environmental Policy Act-NEPA (1969) has effect on project planning and evaluation in the USA. Over 75 countries, this law was adopted for environmental importance. TOTAL 28

Report writing guidelines for EIA TOTAL 28

General format of EIA preliminary investigation report Name, address, telephone and fax number (e-mail) of the project owner: Name, address, telephone and fax number (E-Mail) of persons or establishment, which prepared the EIA report: Name of the project: Date of project preparation: Name and location of the project: Description and scope of project: includes subject of project, job description and duration, aims of services, importance etc. TOTAL 28

ENVIRONMENTAL CHARACTERISTICS OF LOCATION SELECTED FOR THE PROJECT SECTION 1: ENVIRONMENTAL CHARACTERISTICS OF LOCATION SELECTED FOR THE PROJECT TOTAL 28

1. Land usage Description of usage of existing (current) land and its characteristics. Existing usage (agriculture, forest, tourism, industry, recreation, transportation, water resources development potential). Topography and description of geological characteristics (also indication on 1/1000, 1/2500, 1/5000, or 1/25000 scale map) TOTAL 28

2. Species and Ecosystems Ecosystem and species in ecosystems within the land selected for project. Kinds of flora-fauna, their classification, living environment, density of population and risk of generation exhausting. TOTAL 28

3. Characteristics of air, water and soil Description of climatic conditions and quality of air, water and soil. Meteorological conditions: Explanation of meteorological characteristics (monthly maximum and minimum temperature records, rainfall, velocity and direction of wind). Hydrological and hydro-geological characteristics: Sources of surface and subsurface water that will be affected by activity, their physical and chemical characteristics and usage condition. Air quality and noise: Current situation of air quality, and average and maximum noise levels. TOTAL 28

Physical and chemical properties of soils which are in risk of impact. 4. Soil Quality Physical and chemical properties of soils which are in risk of impact. TOTAL 28

5. Socioeconomic Considerations Investigating the effect of activities on socioeconomy (main sectors that constitutes the economic structure of a region, trend of economic development, unemployment, etc). Population density in the activity area and region, distance between settlement area and activity area, the number and types of houses, business and industries that will be affected directly by actions. TOTAL 28

6. Other Characteristics Protection (conservation) areas (national parks, natural parks, watery areas, natural monuments, protected natural areas, wild life habitats, cultural wealth, biogenetic reserve areas, biosphere reserves, private environmental protection zones, private protection areas, protection areas related to water resources for drinking and usage, tourism areas, scenic sites, and other areas under protection). Forest Areas: (species of trees, their quantity (number), coverage areas of trees, and their existing and planned protection and/or usage aims) High places having landscape value and recreation areas, areas having unique geological and geomorphological formations. Lands under the authority of Government (military forbidden zones, areas belonging to public and its associates etc) TOTAL 28

IMPACTS OF PROJECT ON ENVIRONMENT AND PRECAUTIONS TAKEN SECTION II: IMPACTS OF PROJECT ON ENVIRONMENT AND PRECAUTIONS TAKEN TOTAL 28

A. Preparation of land, activities during construction process, and impacts on physical and biological environments and precautions to be taken. 1. Places where excavations to be done and its amount during the preparation and construction process, the place of haulage of materials like soil, stone, sand etc. or the purpose for which they will be utilized. 2. The annual quantity of cut and fill, total coverage area and where to spill out materials. 3. Activities creating dust during preparation and construction process. 4. The species and quantity of trees to be cut during construction and total cut area. 5. Areas to be used during preparation and construction process (including agricultural areas). 6. Types of flora-fauna that could be affected during construction. 7. Types and amount of solid waste materials during preparation and construction process and disposal methods. 8. Level and control of noise during preparation and construction process and precautions taken. TOTAL 28

3- Sources of dust during operations and precautions taken. B. Activities during project operation, impacts on physical and biological environmental and precautions taken. 1- Amounts and types of raw materials to be used for activity products. 2- Production quantity, manufacturing methods and technology, scheme of process flow and side products. Indication of pollutant sources (emission and discharge points) on scheme. 3- Sources of dust during operations and precautions taken. 4- Amount of materials remaining from cut and fill operations and their disposal methods. 5- The usage of explosive materials, types of explosion and precautions taken. TOTAL 28

6. Precautions to be taken against dusting. 7. Impacts of activities to districts and highways and precautions. 8. Amount of toxic, flammable and explosive materials and their detailed description of usage (where and how). 9. Amount and properties of water to be used. 10. Types and amount of fuel, its chemical analysis, combustion systems, amount of emission and precautions taken. 11. Types of flora-fauna to be affected. 12Length of safety guard strip and studies to be done for formation 13. Types and amounts of solid waste materials and precautions taken. 14. Level and control of noise due to working unit and precautions taken. TOTAL 28

C. Project Closeout (termination) Stabilization of land Rehabilitation works Impact on existing water resources Possible air emissions TOTAL 28

D. Monitoring program and Urgent Intervention Plan Monitoring scheme for construction, processing and termination of the project. The precautions to be taken for these and urgent intervention plan if required.   E. Alternatives Alternatives that can be considered for the project. F. Conclusions for EIA General summary of the report, most important environmental impacts, benefits of the projects, selection reasons of the alternatives. Enclosures: All documents and reports used for the preparation of EIA. Notes: CVs of people that prepared the EIA report with their signatures. References: References used for the EIA report. TOTAL 28