PALM BEACH COUNTY WATER UTILITIES DEPARTMENT

Slides:



Advertisements
Similar presentations
Meniv Rishon Ltd. The municipal water, drainage & waste water company.
Advertisements

Presented by: Ronald O. Nichols LADWP General Manager
Status of Wastewater Implementation February 20, 2013 Elizabeth Wood Monroe County, Sr. Administrator – Sewer Projects.
Intel Water Reclaim Project Final Report 5/25/05.
LEE COUNTY UTILITIES DIVISION Integrated Water Resources Master Plan
Florida Department of Environmental Protection Air Resource Management Orange County Environmental Streamlining Task Force May 4, 2011 Air Resource Management,
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
FY Budget Presentation to Board of Finance March 31, 2014 SWPCA William P. Brink, Executive Director Rhudean Bull, Administration Manager.
Public Works Jack Petkus, Director Informational Overview.
1 Industrial Chemical Metering and Control Applications Industrial Plant Incoming Water Filtration, Chlorination, RO/DI Utilities Cooling Water, Boiler.
Capital Improvement Program (CIP) Overview Nick Kanetis, P.E. June 14, 2013.
5-Year Capital Improvements Water Supply, Treatment and Distribution Water Treatment Plant #1 – Wells and Wellfields$ 500,000 –
11 City of Hallandale Beach Water, Wastewater and Stormwater Facilities Plan Public Meeting.
Cornerstone Engineering Group The Foundation for Your Civil Engineering Needs Camanche Reservoir Water Treatment Plant Project Cecilia Zamora Evangelina.
TCEQ Trade Fair Joel Klumpp Texas Commission on Environmental Quality TCEQ Review Process for Innovative Water Treatment Technologies.
LNG Liquefaction, Storage & Delivery Prefabricated & Manufactured M&R Facilities & Lateral Interconnects Complete Solutions for Natural Gas, LNG,Gas Storage,
Waupun Utilities Water Treatment Facility. Treatment Processes Source Water Pretreatment System Reverse Osmosis System Post Treatment System Distribution.
 Groundwater Supply ◦ Quantity ◦ Quality  Infrastructure ◦ Treatment ◦ Transmission ◦ Distribution  Response Plans ◦ Long-term ◦ Short-term ◦ Emergencies.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
New Technologies in Wastewater Treatment The Impact to O&M Staff “New Directions in Wastewater Treatment” October 21 st, 2014 Art Nunez Water Reclamation.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
Broward County-wide Master Reuse Plan
Vienna, 17th/18th February 2014 Heinz-Jürgen Brauch und Florian R
City Manager’s Proposed Budget for Fiscal Years 2010 and 2011 City of Palo Alto Finance Committee May 19, 2009 Public Works Department- Enterprise Funds.
Jeff Ray, EIT Project Engineer, Treatment & Recycle Engineering Broadband Access Points & Programmable Logic Controllers Replacement – Phase 1 Project.
Orange County Utilities Department Water and Wastewater Budget Challenges March 9, 2010.
South County Reclaimed Water Partnership South County Reclaimed Water Partnership Palm Beach County Water Utilities Department Brian Shields,
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
TENTATIVE BUDGET PRESENTATION CITY COUNCIL PUBLIC HEARING SEPTEMBER 8, 2010.
About Us  We are a group of Mechanical Engineers specialized in Construction & Engineering Services.  Our mission is to provide highest quality of construction.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
PROPOSED BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 23, 2011.
Implementation of the Joint Operations Plan Regionalization of the Water Resource Carol Bryck Capstone Project Executive Masters of Public Administration.
EXPANSION OF BRUNSWICK COUNTY’S NORTHWEST WATER TREATMENT PLANT Public Utilities.
© 2014 HDR Architecture, Inc., all rights reserved. © 2014 HDR, Inc., all rights reserved.
5-Year Capital Improvements Water Supply, Treatment and Distribution Water Treatment Plant #1 – Wells and Wellfields$ 500,000 –
Presented by: David S. Prinzhorn, P.E. Town Engineer/Public Works Director/Utilities Manager Town of Cave Creek.
December 10, 2009 TOWN OF PALM BEACH WATER COMMITTEE Discussion of Water Plant Options.
Desalination for Drinking Water Purposes TCEQ Trade Fair David A. Williams, P.E Robert W. Sims, P.E. Austin, Texas May, 2016.
1.  Accurate and timely intelligence shared by all  Effective tactics and strategies  Rapid deployment of resources  Relentless follow-up and assessment.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
Town of Davie Utilities Department Renuka M. Bajnath John McGeary.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
Welcome to AC Repair Miami Get your Air Conditioning repaired in most efficient way with Rafael’s Air Conditioning. Their skilled technicians first diagnose.
National Organization of Minority Engineers Metropolitan Water Reclamation District of Greater Chicago June 30, 2016.
Water Filtration Plant Improvements Project Summary
GIS CONSULTANT SERVICES · RFP# · JUNE 18, 2015
WATER – WASTEWATER TREATMENT EXPERIENCE
WATER – WASTEWATER TREATMENT EXPERIENCE
City of Margate Civil Engineering Services R.F.Q
Public Works/Municipal Utilities Department
THE PALM BEACH COUNTY LEAGUE OF CITIES.
CITY OF HALLANDALE BEACH
Surveying and Mapping City of Hollywood.
PRESENTATION FOR CITY OF TITUSVILLE, FLORIDA
Energy Savings Projects
2017 Fee Calculation Methodology – A Case Study
PROFESSIONAL GENERAL ENGINEERING SERVICES FOR TOWN OF SURFSIDE
FRESNO COUNTY WEST ANNEX JAIL
Davie Green Water Project
City Name Service Category R.F.Q September 14, 2012.
Emergency and Disaster Mitigation and Recovery Engineering Services
Calvin, Giordano & Associates, Inc.
City of Phoenix Request for Qualifications and Scoring Process Update
Improving Energy Reliability & Performance
Improving Energy Reliability & Performance
Background Broward County currently operates a 10 MGD reuse facility located at the North Regional Wastewater Treatment Plant. Customers include commercial,
Southwest Section AWWA 2018 – Baton Rouge, LA
City of West Palm Beach Quarterly Procurement Event Engineering Services Department February 15th 2019.
PUBLIC WATER SYSTEM PLAN and EXCEPTION REVIEW
Presentation transcript:

PALM BEACH COUNTY WATER UTILITIES DEPARTMENT PRESENTATION FOR OPTIMIZATION AND IMPROVEMENTS – DESIGN/BUILD SERVICES Project Number: WUD 14-071 November 4, 2014

Hillers Electrical Engineering 2 PROJECT TEAM Hillers Electrical Engineering

Cardinal/CGA Design Build $32.5 Million Cardinal/CGA Design Build 3 TEAM HISTORY PBCWUD-WATER, WASTEWATER AND RECLAIMED WATER IMPROVEMENTS DESIGN BUILD SERVICES ($5.0 M) Royal Palm Beach Emergency Generator Storage at NROC Morikami Reclaimed Water Storage and Pump Facility WTP #3 Chemical Containment Area and Corrosion Inhibitor Storage Diesel Generator Catalytic Converters (RICE NESHAP Rule Compliance) WTP #9 SCADA System Tower Improvements WTP #3 Degasifier No.3 and Odor Scrubber Central Region Reclaimed Water Facility Improvements OTHER DESIGN BUILD SERVICES ($27.5 M) Pembroke Pines Phase II WTP/WWTP Improvements Miramar WRF Expansion Pembroke Pines WWTP High Efficiency Blower Upgrades

PALM BEACH COUNTY SBE PARTICIPATION 4 4 PALM BEACH COUNTY SBE PARTICIPATION Total Value of SBE Signed Sub-Contracts $1,304,393.93 26.07% of Cardinal/CGA Team’s Total Work

TYPICAL PROJECT APPROACH 5 TYPICAL PROJECT APPROACH PROJECT SCOPE PREPARATION OF PROPOSALS REVIEW AND SCOPE REFINEMENT DESIGN AND PROCUREMENT CONSTRUCTION

DESIGN PHASE CHECKS & BALANCES 6 QUALITY ASSURANCE & PERFORMANCE STANDARDS DESIGN PHASE CHECKS & BALANCES CGA INTERNAL QA/QC PROCESS FIELD VERIFICATION OF DIMENSIONS BY CCI CARDINAL CONSTRUCTABILITY INPUT SUBCONTRACTOR & VENDOR REVIEWS COST OPTIMIZATION DESIGN BY CGA & DESIGN TEAM

CONSTRUCTION PHASE CHECKS & BALANCES 7 QUALITY ASSURANCE & PERFORMANCE STANDARDS CONSTRUCTION PHASE CHECKS & BALANCES ENGINEERING CONSTRUCTION SERVICES INSPECTIONS CONSTRUCTION OVERSIGHT PROFESSIONAL TESTING SERVICES CLOSE KNIT TEAM APPROACH & SOLID DOCUMENTATION TO HANDLE UNFORESEEN FIELD CONDITIONS CONSTRUCTION BY CARDINAL

POTENTIAL PROJECT LIST 8 POTENTIAL PROJECT LIST Degasification / odor control WTP#9, WTP#11 Chemical Storage / Pumping Systems WTP(s) #2, #3, #8, #9, #11 & SRWRF Membrane softening treatment WTP#9 & WTP#11 Water storage / booster pumping morikami, Pahokee & south bay Electrical / emergency generator WTP#9, WTP#11, morikami, belle glade & Pahokee wwtp(s)

RELEVANT EXPERIENCE Degasification / odor control 9 RELEVANT EXPERIENCE Degasification / odor control PBC WTP#3 Degasifier #3 & Odor Control Degasifier & Odor Control Design Cleaning system addition Ground Water Rule Compliance - Clearwell Modifications PBC SRWRF Odor Abatement Improvements 2 Stage Odor Control System Pembroke Pines WWTP Odor Control Air Duct Improvements Cape Coral Everest WTF Odor Control System

RELEVANT EXPERIENCE Chemical Storage / Pump Systems 10 RELEVANT EXPERIENCE Chemical Storage / Pump Systems PBC SRWRF Odor Abatement Improvements Hypochlorite, Caustic & Citric Acid Tanks Chemical Metering Pumps Pembroke Pines Phase II WTP Improvements Hypochlorite Tanks Metering Pumps & Delivery Piping Sunrise Springtree WTP Sunrise Sawgrass WTP Improvements Hypochlorite, Sulfuric Acid & Fluoride Tanks Scale and Corrosion Inhibitor Storage & Mix Tanks

RELEVANT EXPERIENCE Membrane softening treatment 11 RELEVANT EXPERIENCE Membrane softening treatment Sawgrass WTP Improvements Project, RO Skid Rehabilitation Clewiston RO WTP, Low Pressure Reverse Osmosis WTP Port of the Islands Water Treatment Plant in Naples, FL Lee County Pinewoods WTP, Concentrate Line Replacement Tampa Bay Water Desalinization Plant/Corrective Work Town of Jupiter RO Expansion and RO Retrofit Lee County Utilities Expansion and Desalinization Pilot Marathon Reverse Osmosis WTP Stock Island Reverse Osmosis WTP City of Sarasota WRF RO Retrofit Design Build Town of Davie WTP/WRF City of Pembroke Pines Reverse Osmosis System Pilot Study

RELEVANT EXPERIENCE EMERGENCY GENERATORS / electrical PBC RICE-RULE 12 RELEVANT EXPERIENCE EMERGENCY GENERATORS / electrical PBC RICE-RULE City of Tamarac Generator Replacement TIER IV Sarasota County Pump Station No. 3 Improvements City of Mulberry Wastewater Treatment Facility Improvements Broward North Regional WWTP Generator Replacement Broward 440 Pump Station Pembroke Pines WTP Phase II

Hillers Electrical Engineering 13 PROJECT TEAM WHY OUR TEAM? WHAT DOESN’T CHANGE WITH OUR TEAM: PEOPLE & CONTINUITY Our team knows the PBC facilities and the people in them. PBC STANDARDS No learning curve for our team, either with each other or with the County. QUALITY Provide cost-effective, reliable, quality service to the customer Hillers Electrical Engineering

Hillers Electrical Engineering 14 PROJECT TEAM WHY OUR TEAM? WHAT’S NEW! WEST PALM BEACH OFFICE SHARED OFFICE FOR CONSTRUCTION & DESIGN NEW LOGO NEW TEAM MEMBERS Hillers Electrical Engineering

EXPERIENCE – SONG & ASSOCIATES 15 EXPERIENCE – SONG & ASSOCIATES Palm Beach County Water Utilities Experience Green Cay Nature Center Central Regional Operations + Maintenance Center Water Utilities Dept. Customer Service Center Southern Regional Operations + Maintenance Center Other Utilities Experience Abacoa Generator Building, Jupiter SWA Waste-to-Energy Facility Utilities Administration Building, Boynton Beach Master Pump Station, Lake Worth Nanofiltration Plant, Jupiter Reverse Osmosis Plant, Lake Worth West Water Treatment Plant, Boynton Beach Water Treatment Plant, West Palm Beach Emergency Operations Center, Jupiter

Hillers Electrical Engineering 16 PROJECT TEAM WHY OUR TEAM? SIMPLICITY Contracts Insurance Bonding/Form of Guarantee Transition Hillers Electrical Engineering

Project Number: WUD 14-071 November 4, 2014 THANK YOU! Project Number: WUD 14-071 November 4, 2014

Project Number: WUD 14-071 November 4, 2014 QUESTIONS? Project Number: WUD 14-071 November 4, 2014