IT-4327/SMB – Bidders Conference

Slides:



Advertisements
Similar presentations
Project Planning: Assembling a Mortenson “Integrated Work Plan”
Advertisements

Estimating & Tendering. Estimating work involves dealing with Measurements and quantities Pricing and rates Subcontract packages Tender preparation.
IT-3872 Refurbishment of the piping of the chilled water circuit of the Proton Synchrotron Alexandre Broche EN-CV-PJ.
Skyscraper Construction
Welcome to CERN Accelerating Science and Innovation 2 nd March 2015 – Bidders Conference – DO-29161/EN.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
Walls: Materials, Location, Load Bearing, Non-Load Bearing
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
Preparatory Seminar for STL Examination By Dr. James Lau, BBS JP.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
Technical Control Bureau for Construction SECONED Technical Inspection Service AON Nazomermiddag 08 sept Delft.
Process Protocol Demonstrator Implementation of the Process Protocol at the Britannia Walk Development Stuart Carmichael Process Network 7 March 2002.
19 February Summary: Updating on the activities completed (Done) since the last meeting List activities on going (Next steps) and related Actions.
Specification & Quantities Estimating
Doing business with CERN Anders Unnervik 3 November 2014.
IT-4103/EN Bidder’s conference Technical Specification for the Design, Supply, Installation and Commissioning of an HVAC system, a Smoke Extraction system.
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
IT-4082 Design, Supply, Installation and Commissioning of the ventilation of the BAF3 building Alexandre Broche EN-CV-PJ.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
22 October Summary: Updating of the activities carried out on-site (Done) in SEPTEMBER List activities on going (Next steps) and scheduled for OCTOBER.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
CENF CIVIL ENGINEERING : - DESIGN TENDER AND ESTIMATED COSTS John Osborne GS/SE 19 July 2013.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Engineering Department EN 1 IT3853-EN Design, Supply of Ventilation Units and Smoke Extraction Systems for Building 192 Bidder’s conference – 29 th April.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
HiRadMat : Coordination meeting 02 October S. Evrard 1 News from project team General information : access,... PR532 repair : plans Existing services.
IT-3963/EN Bidder’s conference Design, supply, installation and commissioning of the cooling system for the NA62 Gigatracker Tuesday 10 December 2013 Building.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
Proposal for rerouting of buried electrical networks and optical fibres at Point 1 LS2 Committee meeting S. Bertolasi on behalf on EN/EL WP17.2 HL-LHC.
Introduction to Building Trades Denver High School.
Pieter Mattelaer (SMB-DI)
Jordan suggested list of occupations / Construction Sector As of a request from ETF, Jordan technical team has built the list of proposed occupations to.
Site lay out Tanks area Building area Unloading area GT21 GT22GT23 GT24.
T600 Detector FNAL Fernanda G. Garcia Fermi National Accelerator Laboratory.
Update on the PSB Cooling and Ventilation Systems
I. Bergevoet - Training preparation
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
IT-4337/SMB – Bidders Conference
Dielectric Oil Installations
LS2 COMMITTEE - 14th Meeting Friday 25 Aug 2017
Invitation To Tender Procedure IT – 4327/SMB Technical specification for the civil Engineering works for the construction of the new building.
5th FCC Infrastructure & Operation meeting
CE Status: Activities executed until 03/08 and ongoing
RIBA Plan of Work 2013.
the high-voltage network of CERN ToMORROW
Special LS1 day on 12 June 2012, EDMS:
Ways to industry participation in CLIC 24th October, 2017
SR1 cleanroom extension
SPS activities during LS2 TE-EPC (Power Converter Group)
Pre-Contract Cost Control
Business opportunities related to CERN electrical network
Contractor Open House and Diversity Networking Event
Safety Tip FQ18086 RHODE ISLAND AVENUE METRO STATION TRACK DECK AND PRE-CAST PANEL REHABILITATION Please use full fall Protection gear when using 6’ or.
The Hollies, Ravenshead
CMS Gantry for Detector Lowering
Value of contract: Length of contract: Contract start date:
Woodlane Timber, Hucknall
Value of contract: Length of contract: Contract start date:
Introduction DEFINATION :-
Far Experimental Hall Hutches Civil Construction
Value of contract: Length of contract: Contract start date:
Far Experimental Hall Hutches Civil Construction
RIBA Plan of Work 2013.
CERN: from fundamental sciences to daily applications
Advancd Measurement and Contract Administration
Presentation transcript:

IT-4327/SMB – Bidders Conference https://indico.cern.ch/event/642426/ 29.05.2017 IT-4327/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)

Agenda of the Conference 14:00 Welcome and registration at Building 33 (M. Manfredi) 14:15 Transfer to conference room –> 73/1-031 14:30 - 14-50 Agenda, Introduction to CERN and presentation of technical documents (M. Manfredi) 14:50 – 15:10 Working on the CERN site (P. Bonnal) 15:10 – 15:30 Presentation of commercial documents (C. Masoura) 15:30 – 16:00 Questions – Answers (All) 16:00 – 17:00 Visit of the site (M. Manfredi) 17:00 Transfer to Building 33 29.05.2017 IT-4327/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)

IT-4327/SMB – Bidders Conference M. Manfredi (SMB-SE-PO) Outline Introduction at CERN Description of the project Tender documents Key dates and time for completion 29.05.2017 IT-4327/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)

CERN – General presentation (1) Year of Foundation --> 1954 by 12 European States ; Today --> 2017 Aim of the Organization CERN has 22 Member States. Serbia and Cyprus are associate members in the pre-stage to membership ; Turkey, Pakistan, Ukraine and India are associate members ; Non-member states with co-operation agreements ; Scientific contacts. http://home.cern/about/member-states CERN, the European Organization for Nuclear Research, physicists and engineers are probing the fundamental structure of the universe. They use the world's largest and most complex scientific instruments to study the basic constituents of matter – the fundamental particles 29.05.2017 IT-4327/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)

CERN – General presentation (2) Location --> Astride the Franco-Swiss border near Geneva Some numbers --> People and Budget in 2016 2’560 Staff and 750 Fellows ; > 12’000 Users ; 1’127.2 MCHF 29.05.2017 IT-4327/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)

CERN – General presentation (3) An accelerator complex unique in the world 29.05.2017 IT-4327/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)

2. Description of the project – general information New cooling towers (SFA181) Site Point 1.8 in France Objectif du bâtiment : Tours de refroidissement Surface Local Technique: 250 m2 Surface Tours (2 cellule): 160 m2 Nbre d’étages: SS/RDC/R+1 Système constructif Local Technique: Radier/mur soubassement BA/charpente métallique et bardage Système constructif Tours: Radier/mur BA/ béton préfa. 29.05.2017 IT-4327/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)

2. Description of the project – general information Primary water networks and HDPE ducts Réseaux existante : EL-HT/BT, FO, EP, EU, EC, Tél, Air C. Bâtiment impactés directement: SHM18, SW18, SH18, B.3153 Bâtiment impactés indirectement: SM18, SF18, SD181, BA7 Autres ouvrages: Galerie technique, dalle béton boucle SPS, dalle réservoirs hélium, chambre tirage, etc.. 29.05.2017 IT-4327/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)

2. Description of the project – definition of the work The civil engineering contractor(s) is responsible for the works: - Installation of the worksite ; - Earthworks and backfilling ; - Demolition and dismantling ; - Primary water and ducts networks including connection to the surrounding buildings ; - Pipes and drainage networks, retention basin, asphalt surfacing, kerbs and road markings ; - Reinforced concrete for foundations, raft, retaining walls, walls, delivery platform, pre-casted beams, stacks ; - Steel structures (primary and secondary frame) ; - Waterproofing and insulation system ; - Facades and insulation system ; - Control room with sandwich panels; - Finishing : plasterwork and ceilings; tiling and surfacing; resin floor coverings; - Metalwork ; - Landscaping. CIVIL ENGINEER : Design, Execution and as-built drawings for structural elements ; CONTRACTOR(S) : Execution and as-built drawings for the finishing work, in particular the details of façades, waterproofing, insulation, minor metalwork, doors, etc., and the workshop drawings for the metal structure, including the design of the joints. Responsibility for design : 29.05.2017 IT-4327/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)

2. Description of the project – ground conditions Geotechnical report provided in Annexe C of the Technical Specification 29.05.2017 IT-4327/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)

2. Description of the project – worksite conditions POINT 1.8 site access Buildings access to be kept free Worksite and existing site fence SM18 visitor centre Cables 18kV, 66kV and OF (Prevessin-LHC1) - critical - Trench SL182 Worksite available access Provisional worksite installation Cables 18kV SPS - critical - 29.05.2017 IT-4327/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)

2. Description of the project – concrete works Système de fondation : Radier Structure: Radier Epaisseur Local Technique: 40cm Epaisseur Bassin Tours: Altimétrie Local Technique: -3.4m Altimétrie Bassin Tours: -1.4m Remarque: Isolation sous radier, pente 1% pour évacuation d’eau, socles pompes, fosse de relevage Structure en élévation: Mur soubassement et murs en BA des Tours Structure: Murs en BA Epaisseur Murs: 20 à 40cm Hauteur : 1.5 à 12.7 m Remarque: Isolation mur contre-terre et intérieur, réservation pour portes et réseaux divers, poutres prefa. pour packing, prédisposition pour 3eme cellule 29.05.2017 IT-4327/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)

2. Description of the project – steel works Charpente métallique principale Charpente métallique secondaire Profilés: Type HEA/HEB/RRW Mise en œuvre Boulonnage, scellement dans le béton Finitions: Peinture double couche RAL 6018 Remarques: pont roulant 3.2T avec passerelle Profilés: Type HEA/HEB Mise en œuvre Boulonnage, scellement dans le béton Finitions: Zingage à chaud 29.05.2017 IT-4327/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)

2. Description of the project – cladding/roofing/finishing The building’s façade shall consist of insulated sandwich panels with metal shell The building’s roof shall consist of insulated panels with double waterproofing membrane 29.05.2017 IT-4327/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)

IT-4327/SMB – Bidders Conference M. Manfredi (SMB-SE-PO) 3. Tender documents Administrative documents - Tender Form - Form of Contract - Description and Quantity Estimate (DQE) - Technical Specification and its Annexes: Annex A: Document “Working on the CERN site” Annex B: Construction Drawings (structural engineer) Annex C: Geotechnical report (GADZ, 7540-1, 02/11/2016) Annex D: WSCP – Work and Safety Coordination Plan Annex E: Requirements for overhead cranes rails, EDMS 1488244 v1 Annex F: Technical prescription on Hydraulic installations for pipework, equipment, accessories, construction, inspection and testing Technical documents 29.05.2017 IT-4327/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)

4. Key dates and time for completion Key dates --> Intermediate milestones are indicated in §3.4 of the Technical Specification ; Commencement date --> in October 2017 (to be confirmed by a Work Order two weeks before the actual commencement date) ; Time for completion --> 10 months 29.05.2017 IT-4327/SMB – Bidders Conference M. Manfredi (SMB-SE-PO)