Testing & Conformity Assessment for Energy Storage Systems

Slides:



Advertisements
Similar presentations
Mitigation of AC Induced Voltage On Buried Metallic Pipelines
Advertisements

Bonding and Grounding What? Why? How?
(Adapted from:D.T. Hall:Practical Marine Electrical Knowledge)
© 2011 Underwriters Laboratories Inc. Emerging Implications of DC Power & Energy Storage Ken Boyce NFPA Alternative Energy Technologies and Electrical.
Compliance With Resolution 0859 – Safety of Persons Underwriters Laboratories Inc. March 2008 Refrigerators, Freezers and Combination of Refrigerator-Freezers.
1 CNS/GSS/2008/M1 1 Module 1 Basic Terminologies and Characteristics of Switchgear.
Setup/Installation/Operation of an Environmental Control Unit (ECU)
VRLA Battery Maintenance and Safety UTC Region 3 Meeting October 4, 2012.
An illustration of EVS-GTR Battery System Test Project and Test Methods’ Adaption to Commercial Vehicles Peter Wu, BYD.
Pipeline and Hazardous Material Administration (PHMSA) Department of Transportation AN OVERVIEW OF INTERNAL SHORT CIRCUIT SCREENING TEST METHODS FOR LITHIUM.
UN Informal Working Group Meeting on Lithium Battery Tests Ideas to Address Problems Testing Large and Small Cells and Batteries George A. Kerchner Executive.
Emergency Lighting Code Review Presented by Iota Engineering LLC.
Smart battery technology for a global environment Louie Lane #104 Reno, Nevada
Helfried Rybin 1 AUTOMOBILENTWICKLUNG / ENGINEERING Safety Demands for Automotive Hydrogen Storage Systems Helfried Rybin.
Proposed Design and the Operation of a Disconnecting Device for Small EG Installations Prepared by Hendri Geldenhuys.
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE PV APPLICATIONS CODES AND STANDARDS EMERGENCY RESPONSE.
Battery Principles.
P/1 NEMA/NFPA/UL LVDC Conference April 8, 2011 Product Standards Ken Boyce Underwriters Laboratories Inc.
CNG STATION & GARAGE MODIFICATION CODES & STANDARDS Graham Barker Business Development Manager.
Funded by FCH JU (Grant agreement No ) 1 © HyFacts Project 2012/13 CONFIDENTIAL – NOT FOR PUBLIC USE 1.
National Highway Traffic Safety Administration U.S. Proposal on BMS Functionality-In Use Brian T. Park Safety Engineer.
PRBA – The Rechargeable Battery Association
CXS490 Carbon Dioxide Systems
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
Status of SAE FCV Safety Working Group Activities Developing Systems-level Performance- based Standards for Hydrogen and Fuel Cell Vehicles (FCVs) Presented.
Page June 2015 OICA position on venting EVSTF-04-11e.
Task Force 3: Electrolyte leakage Last update- 01/06/
NFPA ELECTRIC VEHICLE SAFETY FOR EMERGENCY RESPONDERS Module V : Emergency Operations Module V : Emergency Operations 5-1.
Mid Semester Presentation. Team Members Chapman, Jonathan Duties: Recharging Circuit Major: Electrical Engineering Dang, Quoc Duties: Power Circuit, Website.
JLAB Pressure Systems Considerations Ed Daly. Outline Introduction Federal Law - 10CFR851 Compliance JLAB Pressure Systems Program –Complies with 10CFR851,
Chapter 3 PHYSICAL INJURY AND CONTROLS 3.2 Electrical Safety
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Lockout Tagout Program
Ground Bond and Ground Continuity Testing
Steve Griffith February 28th, 2017
UL9540 Overview: Safety for Energy Storage Systems
Comparison of AIS and GIS Grid Station Muhammad Ali Ashraf Management Associate (Electrical) CPP Project.
Electric Vehicles Safety Global Technical Regulation Phase 1
v1/2011 Strikesorb Protection Solutions
Task Force 3: Electrolyte leakage
Task Force 3: Electrolyte leakage
A Microcontroller Based Power Management System for Standalone Micro grids With Hybrid Power Supply 1.
Electric Vehicles Safety Global Technical Regulation
The Role of Smart Transformers within Microgrids
ROCKET TESTING TYPES OF TESTS
Energy Storage System Guide for Compliance with Safety Codes and Standards Gene Eckhart November 2, 2016.
Mild Environment Qualification and Maintenance
2017 Fall Educational Forum Bruce A. Tagg, ALCM
THUM Adapter Impact on Hazardous Area Classification
Receptacle Classifications
Lithium Operating Issues in a Stationary Environment
T-6B On-Board Oxygen Generation System (OBOGS)
Mechanical Dimensions
3.0 Sirius Models.
Karen Bartleson, President, IEEE Standards Association
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
ELECTRICAL POWER-II Electrical engineering sixth semester
Factors to Consider when Designing a Reliable Power Grid
Factors to Consider when Designing a Reliable Power Grid
ECMA-287 Safety of Electronic Equipment Safeguards to reduce harmful exposure to energy sources Ecma TC12 Rue du Rhône CH-1204 Geneva - T: +41.
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
HAZOP Guidewords Base Set
SAE battery safety standards committee UPDATE January 23, 2019
Parker domnick hunter. Safety of Electrical and
Mechanical Dimensions
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
T-6B On-Board Oxygen Generation System (OBOGS)
Introduction Purpose To describe the features and capabilities of two new coin cell supercapacitor series from CDE. Objectives Explain advantages of supercapacitors.
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Effects of Cold on Military Vehicles
Presentation transcript:

Testing & Conformity Assessment for Energy Storage Systems Ken Boyce Principal Engineer Director Energy & Power Technologies UL LLC

Why Energy Storage? Recently, enormous focus has been placed on expanding the energy storage infrastructure. The benefits of energy storage are driven by several dynamic factors.

Kahuku, Hawaii 2012

The Invisible Foundation Good standards serve as the foundation for successful technology deployment, addressing safety, interoperability and clear expectations Environmental & Energy Goals Market Success Standards Codes & Regulations

Testing and conformity assessment of energy storage systems are critical for safety Safely managing high energy density under normal and abnormal conditions must be demonstrated Connections to the electric grid and buildings present dynamic and demanding conditions of use Integration into the infrastructure must be coordinated to minimize the risk of unintended consequences over the life of the energy storage system Some approaches used elsewhere may help the South African technical community find the best solutions

Testing Criteria

Fluid containment tests Overview of UL 9540 Tests EES system tests Electric tests Mechanical tests Fluid containment tests Environ-mental tests Although most testing would be covered by the technology specific standards, UL 9540 does include some testing for those technologies that may lack specific criteria. As noted above, the tests are divided into electrical tests, mechanical tests fluid containment tests and environmental tests.

Overview of UL 9540Tests Electric tests Normal operations 2 cycles of charge/discharge Measure temps Ensure limits are not exceeded Dielectric voltage withstand Per UL 60950-1 electric strength test Impulse 1.2/50 sec pulse of voltages per table Applied between circuit under test and accessible parts Equipment Grounding and bonding Test per NFPA 79 or UL 60950-1 method ≤ 0.1Ω in grounding circuit Insulation resistance Insulation between hazardous circuit and accessible parts ≥ 1 MΩ Apply 500 V dc for 1 minute and measure resistance Although most testing would be covered by the technology specific standards, UL 9540 does include some testing for those technologies that may lack specific criteria. As noted above, the tests are divided into electrical tests, mechanical tests fluid containment tests and environmental tests.

Overview of UL 9540Tests Mechanical tests Blocked shaft Over speed test Single fault that can lead to an over speed condition. Parts are not loosened or disconnected to cause a hazardous condition Faulted securement test Moving parts are subjected to single fault in securement and then rotated Blocked shaft Block shaft of moving part for 30 min max, protection operates, or breaking off of a part Although most testing would be covered by the technology specific standards, UL 9540 does include some testing for those technologies that may lack specific criteria. As noted above, the tests are divided into electrical tests, mechanical tests fluid containment tests and environmental tests.

Overview of UL 9540Tests Mechanical tests Abnormal Speed Test Leakage a margin of safety of a factor of at least 2.0 Leakage Leakage of Hazardous gas Leakage of hazardous liquid Strength Hydrostatic strength Pneumatic strength Although most testing would be covered by the technology specific standards, UL 9540 does include some testing for those technologies that may lack specific criteria. As noted above, the tests are divided into electrical tests, mechanical tests fluid containment tests and environmental tests.

Overview of UL 9540Tests Environmental tests Outdoors installations subject to moisture exposure IEC 60529, UL 50E, CSA C22.2 No. 94.2 per rating Electrical Insulation tests after conditioning Check for water in side on components, etc. Outdoor installation near marine environments Salt Fog test of IEC 60068-2-52 for Severities 1 of 2. Examination for signs of damage as a result of salt fog exposure Installation in seismic environments Evaluated for ability to withstand seismic events per rating examined for signs of explosion, fire, combustible concentrations (if applicable to technology), rupture of the enclosure, electrolyte leakage, electric shock and loss of protection controls that may lead Although most testing would be covered by the technology specific standards, UL 9540 does include some testing for those technologies that may lack specific criteria. As noted above, the tests are divided into electrical tests, mechanical tests fluid containment tests and environmental tests.

Testing Facilities Testing of energy storage systems presents some unique challenges Safety of personnel and the facility is critical when testing battery technologies, especially large format and especially in fault modes Expertise in BMS technology is imperative Grid connection testing requires significant testing equipment and expertise of the technicians

Safety of large format batteries: UL 1973 vs. IEC 62619 UL 1973 Construction Requirements IEC 62619 Construction Requirements Scope: Safety, Non-technology specific and covers lithium ion, LA, Nickel, Sodium Beta, Flow Battery and Ultra-capacitor technologies for stationary and LER applications Covers very generic safety criteria for lithium ion cells and batteries for industrial use (stationary and off road motive) Material requirements affecting safety N/A Gaskets & Seals requirements if affecting safety Enclosures, ingress, accessibility to hazardous parts and material requirements Electrical system requirements Systems safety analysis (FMEA) Included Protective circuits and controls including functional safety Cooling/Thermal Management System requirements Electrolyte Containment Parts and Parts subject to pressure Cells and Capacitors: covers various technologies and ultra-capacitors (Annex E cell program similar to IEC 62619 with some exceptions) lithium ion cell tests only Nameplate & Cautionary Marking Requirements IEC 62620 nameplate, general info on cautionary Instructions for installation, operation and maintenance Very general instruction information

UL 1973 – IEC 62619 UL 1973 Test Requirements IEC 62619 Test Requirements Tests General: Monitor for insulation deterioration through repeat of dielectric voltage withstand test, determine combustible concentrations and potential toxic venting, include 1 hour observation period after test, conduct charge/discharge cycle if battery is still operational after test to determine no hazards resulting from operation N/A Overcharge -Attempt overcharge of battery to > then 110% of maximum charge voltage, single fault (SF) Overcharge control test for voltage controls and current controls Short Circuit -Subject battery to hard short at ≤ 20 mΩ and then repeat with loading below trip point of SC protection , SF Short circuit is only at the cell level. No short circuit at the battery level. Over-discharge Protection -Continue discharging discharged pack for 30 minutes after reaching end of discharge voltage or until protection operates, SF Evaluated at cell level only Temperature and Operating Limits Check -Charge/discharge cycle battery for 2 sets of cycles at maximum load and consideration for max ambient and measure temperatures and parameters of modules/cells

UL 1973 – IEC 62619 UL 1973 Test Requirements IEC 62619 Test Requirements Imbalanced Charging -create artificial imbalance of a cell or module in discharged pack by leaving at @ 50% SOC and then charge pack N/A Dielectric Voltage Withstand -voltage withstand test per IEC 60950-1 electric strength test parameters Continuity -measure impedance of grounding circuit either through ohmmeter measurements or through measurements of voltage drops when running current through circuit. Failure of Cooling/Thermal Stability System -fail cooling/thermal stability system to determine if hazards occur Overheating control test addresses similar concern Working Voltage Measurements -measure voltages at circuits to determine suitable spacing criteria and dielectric withstand test voltages Strain Relief -156 N pull on external cord at anchorage for 1 minute Push Back Relief -push external cord back at anchorage for 26.7 N force Static Force - 250 N static force on battery enclosure for 5 seconds. Impact -6.8 J ball impact of battery enclosure Drop Impact - Drop field installed modules or packs onto hard surface from designated height which varies with wait of device Drop impact test is similar to UL 1973 Wall Mount/Handle - Handle or wall mount fixture to be able to support 4 times weight of device for 1 minute

UL 1973 – IEC 62619 UL 1973 Test Requirements IEC 62619 Test Requirements Mold Stress - UL 746C 7 h aging test of polymeric enclosure N/A Pressure Release -Evaluation of relief mechanism in a VRLA or valve regulated nickel battery per UL 1989 method Start-to-Discharge -Evaluation of pressure relief valve Resistance to Moisture -Resistance to moisture based upon IP rating of enclosure, tests per IEC 60529 or can do UL 50E enclosure tests Salt Fog -IEC 60068-2-52 Salt Mist test for Severity 1 or 2 External Fire -Hydrocarbon Fuel Pan Fire exposure for 30 minutes followed by hose down Internal Fire -Propagation test for lithium and sodium technologies – under revision to include other technologies and provide details regarding cell failure methods. Name of test changing to “Single Cell Failure Tolerance” and will be taken out of the environmental test. New appendix developed for cell failure methods. Propagation Test similar to internal fire test of UL 1973 however, can waive propagation test for cell particle test (FISC) Forced Internal Short Circuit (FISC) Test - Particle cell test which is option to replace propagation test. Consists of pressing on exposed cell electrode assembly that contains a small particle.

For Lithium ion battery systems UL 1973 – IEC 62619 UL 1973 Test Requirements IEC 62619 Test Requirements Production Tests - Dielectric Voltage Withstand, Continuity, N/A No production testing noted, but does have criteria regarding quality program for production. Special Technologies Sodium Beta: Cell Test program for sodium sulfur and sodium nickel chloride, etc. cells - short circuit, abnormal charging, shock (mechanical), vibration, heating, temperature cycling, N/A (lithium ion only) Flowing Electrolyte Batteries, Flow battery stack tests - vibration, shock, and short circuit N/A Flowing Electrolyte Battery: Additional tests specifics with regard to testing flow batteries - hydraulic pressure, leakage, electrolyte blockage, short circuit, shunt current determination, spill containment For Lithium ion battery systems UL 1973  IEC 62619 + IEC 63056 + IEC 62485-5

Other standards of note for energy storage The IEC 62257 series, Recommendations for renewable energy and hybrid systems for rural electrification, addresses equipment for isolated use in producing and distributing electricity UL 9741 was developed to address “V2X” technology for exporting power from electric vehicle batteries UL 1974 is being developed to address repurposing of electric vehicle batteries into the stationary energy storage infrastructure in a “second life” UL 3001 is being developed to address microgrids

Conformity Assessment

Conformity Assessment Conformity assessment is essential to establish initial and ongoing adherence to important requirements such as safety Battery technologies generally have low failure rates, but the energy density and significant consequences for large scale energy storage installations require ongoing confidence in the supply chain Best practices include placing a conformity assessment scheme in place to address both certification and ongoing production

Interface with Codes and Regulations Coordinating testing and certification to product standards with an overarching codes and regulatory structure promotes optimal integration This establishes clear rules for how certified products and systems need to be imported, sited, installed, commissioned and operated These requirements can address electrical aspects, how to integrate into a building with respect to fire safety and structural integrity, grid compatibility, and the like

Code developments NFPA 70, the National Electrical Code, added new requirements in the 2017 Edition to address energy storage systems and DC microgrids, requiring certification NFPA 855 is being developed to address building and fire safety considerations for integrating energy storage systems The International Fire Code (IFC) was revised to include rules for installing energy storage systems into buildings, identifying limits, certification, fire suppression and setbacks Grid codes continue to evolve, but the evolution to “smart inverters” with advanced technology will offer better grid management for the future

Other efforts related to energy storage UL is leading work to with interested parties to continue refinement of methods to assess the risk of fire starting within and propagating UL is working with leaders in industry and the fire service to assess the risk of an external fire engaging an energy storage system Work continues in the broader fire community to address the best methods for fire suppression involving energy storage technologies

Summary Energy storage has brought may benefits to the global energy infrastructure There are standards and codes that may serve as a model to help South Africa develop the optimal approach for its people and country Work continues on finding the best way to address the needs of all stakeholders – consumers, owners, manufacturers, utilities, government, insurers, first responders and others – for energy storage

Thank you Ngiyabonga Dankie Ken Boyce Kenneth.p.boyce@ul.com